My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
>
Address Records
>
WALL ST
>
1502
>
IMAGINE CHILDRENS MUSEUM
>
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 4:22:03 PM
Creation date
8/25/2022 2:14:52 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1502
Tenant Name
IMAGINE CHILDRENS MUSEUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 13: Protect Low Impact Development (LID) BMPs (2.1 .13) <br /> Describe LIDs. <br /> Permittees must protect all Bioretention and Rain Garden facilities from sedimentation through <br /> installation and maintenance of erosion and sediment control BMPs on portions of the site that <br /> drain into the Bioretention and/or Rain Garden facilities. Restore the facilities to their fully <br /> functioning condition if they accumulate sediment during construction. Restoring the facility must <br /> include removal of sediment and any sediment-laden Bioretention/Rain Garden soils, and <br /> replacing the removed soils with soils meeting the design specification. <br /> Permittees must maintain the infiltration capabilities of Bioretention and Rain Garden facilities by <br /> protecting against compaction by construction equipment and foot traffic. Protect completed <br /> lawn and landscaped areas from compaction due to construction equipment. <br /> Permittees must control erosion and avoid introducing sediment from surrounding land uses <br /> onto permeable pavements. Do not allow muddy construction equipment on the base material <br /> or pavement. Do not allow sediment-laden runoff onto permeable pavements. <br /> Permittees must clean permeable pavements fouled with sediments or no longer passing an <br /> initial infiltration test using local stormwater manual methodology or the manufacturer's <br /> procedures. <br /> Permittees must keep all heavy equipment off existing soils under LID facilities that have been <br /> excavated to final grade to retain the infiltration rate of the soils. <br /> Describe how you will protect LID facilities from sedimentation, protect soils from compaction, <br /> and maintain the infiltration capabilities. <br /> Describe how you will clean permeable pavements fouled with sediments. <br /> [Insert text here] <br /> Pollution Prevention Team (3.0) <br /> Table 7 —Team Information <br /> Title Name(s) Phone Number <br /> Certified Erosion and Contractor to provide [Insert Number] <br /> Sediment Control Lead <br /> (CESCL) <br /> Resident Engineer <br /> Emergency Ecology DOE, Emergency Management Div. 1-800-258-5990 <br /> Contact <br /> Emergency Permittee/ <br /> Owner Contact <br /> Non-Emergency Owner <br /> Contact <br /> Monitoring Personnel Contractor to provide <br />
The URL can be used to link to this page
Your browser does not support the video tag.