Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> MEMORANDUM <br /> TO: Adam Clark 12812 Architecture,425-252-2153 <br /> CC: Nancy Johnson I Imagine Children Museum 425-258-1006 <br /> FROM: Benyam Stephanos I City of Everett Engineering/Permit Services,425-257-7289 <br /> DATE: 08/08/2019 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Children Museum <br /> LOCATION: 1502 Wall St. <br /> PERMIT#: PW1906-020 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following revisions <br /> should be made and/or the following conditions must be met: <br /> Please see the compiled list of comments below and the attached redlines to revise your plans accordingly, <br /> prior to resubmitting to the Permit Services Counter. If you have any questions regarding the <br /> comments/redlines or need anything further, please directly contact this project's Public Works plans <br /> reviewer,Benyam Stephanos, at BStephanos@everettwa.gov(or 425-257-7289),or the other reviewers <br /> listed depending on the scope of the question. Please note that these comments are compiled from Public <br /> Works reviewers for the Public Works (civil) plans only.The applicant team may receive a separate comment <br /> letter from the Building Reviewer and/or the Planning Reviewer for architectural, landscape,or other types of <br /> drawings. <br /> 1. Please resubmit the following items to the Permit Services Counter with your resubmittal once all <br /> requested revisions have been made: <br /> a. Transmittal Sheet: (1) available at the Permit Counter (and included herein for your use upon <br /> resubmittal). <br /> b. Plans: (4)full size sets of revised plans, plus original City Markups. <br /> c. Drainage Report: (2)copies of revised report. <br /> d. SWPPP Report: (2) copies of revised SWPPP report. <br /> e. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate form filled out for the <br /> City to use to calculate the Public Works Permit Fee (as applicable based on water plan revision). <br /> The Permit Counter is open Monday through Friday from 7:30am-12:00pm and from 1:00pm-4:00pm (closed <br /> between 12:00pm-1:00pm for lunch). <br /> 2. Please see all redlines on the attached plans for required corrections in addition to all comments listed <br /> below. Frequently, redlines will be stand-alone and will not have an associated item in this corrections <br /> Page 1 of 2 <br />