My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 93RD ST SE 2022-08-25
>
Address Records
>
93RD ST SE
>
916
>
916 93RD ST SE 2022-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:39:01 PM
Creation date
8/25/2022 2:38:53 PM
Metadata
Fields
Template:
Address Document
Street Name
93RD ST SE
Street Number
916
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT Ell OO - <br /> I: <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> E V E R E T T 425 257-8800 <br /> WASHINGTON COST ESTIMATE SIIEET <br /> Receipt # Date Paid <br /> X Cost of Work Order $5610.00 Work Order# <br /> Cost of Service Order - Service Order# <br /> Requested By: Terri Jorgenson <br /> Contact Person Maude Marzan Telephone# 206 605-7128 <br /> Email Address: maudemarzan@hotmail.com Date of Request 10-12-2021 <br /> Property Owner(name) Maude Marzan • <br /> -C . �:,��to <br /> ,......s,:�: -(name if different than owner) <br /> Address 916 93rd St SE City Everett,WA Zip 98208 <br /> Installation Location 916 93rd St SE <br /> Installation type/description/size/etc. Modify existing 3/a" service to 1" Dom/Fire combo. 1"tap on 6" <br /> main and install 1" meter with box. Owner request <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc: Bldg.Permit Center <br /> Material $1262.00 (EverettEPS@EverettWA.gov) <br /> Labor and Benefits $2538.00 Matt Welborn-Email&HC <br /> Randy Allen-Email <br /> Equipment Rental $780.00 Jim Spooner-HC <br /> Tax $230.00 Sabrina Good-Email <br /> Grant Moen-Email <br /> Restoration $800.00 Thad Newport-Email <br /> TOTAL $5610.00 Terri Jorgenson-Email <br /> Prepared by: Jim Spooner a Date Estimate Prepared 11-12-2021 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clericat\Cost.est12021\9I6 93rd St SE 1 inch CEFP <br /> l of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.