My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2202 100TH ST SW 2023-02-07
>
Address Records
>
100TH ST SW
>
2202
>
2202 100TH ST SW 2023-02-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2023 10:20:28 AM
Creation date
8/25/2022 4:06:42 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHINGTON <br />PUBLIC OORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />Everett, WA 98201 <br />425-257-8810 <br />CONTINUED ON PREVIOUS PAGE.... <br />Public Works Permit Fee Breakdown: <br />Grade/Fill/Excavate (5000 cy)...................$290.00 <br />Paving (20,700 sf).......................................$103.50 <br />Erosion Control........................................$200.00 <br />Driveway Cuts (2).........................................$90.00 <br />PW Plan Review.......................................$4,688.45 <br />PWSite Inspection....................................$9,376.89 <br />Traffic Mitigation Fee................................$19,200.00 <br />Stormwater Sys Dev Fee.........................$6,661.49 <br />City of Everett Official Use Only <br />Approved for Construction, Public Works Dept. Date <br />ate Applied: 4/13/2020 <br />Public Works Permit #: PW2004-012 <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: $0 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant <br />hereby agrees to hold and save harmless the City of Everett from any <br />and all claims for damages, costs, expenses, or causes of action that <br />may arise because of installation and maintenance of the <br />improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.