Laserfiche WebLink
Imagine Children's Museum Building Addition Revised Geotechnical Engineering Report <br /> Everett, Washington Project and Site Conditions <br /> AESI completed a limited Phase II Environmental Site Assessment (Phase II ESA) to further <br /> investigate soils with hydrocarbon odors that were encountered during completion of boring <br /> EB-1. The results of that limited Phase II ESA are presented under separate cover in our report <br /> dated April 5, 2007. No additional sampling or analytical testing was completed on the <br /> museum property that is the subject of this geotechnical engineering report. <br /> March 28,2019;Revised April 16,2019 ASSOCIATED EARTH SCIENCES,INC. <br /> SGB/Id-190104E001-3-Projects\20190104\KE\WP rage,5 <br />