Laserfiche WebLink
4'fi�4, <br />I'vi ON <br />2 -,-,ASS <br />1N'Cll DN 0 C. <br />10' PRIVATE <br />SEWER ESMT. 10 <br />BENEFIT LOT 3 <br />4 <br />'Alkly'll wX <br />2" 1,',Oh <br />'n <br />J'AN 20'1,63 <br />1. <br />PLAY, <br />SECTION 1 TOWNSHIP 28N, RANGE 4E, W.M2 <br />SOIL AMENDMENT NOTES: <br />QeTlaLll - AMEND EXISTING SOILS IN PLACE, <br />7 <br />110 SCARIFY OR TILL EXISTING SUBGRADE TO 4 INCHES DEPTH (OR TO DEPTH NEEDED TO ACHIEVE A <br />6 <br />TOTAL DEPTH OF 12 INCHES OF UNCOMPACTED SOIL AFTER CALCULATED AMOUNT OF AMENDMENT IS <br />5 <br />- - — -- ADDED, SEE SPECIFIC SUBSECTIONS BELOW). ENTIRE SURFACE SHOULD BE DISTURBED BY <br />— <br />EMERALD V1 LLAGE SCARIFICATION. DO NOT SCARIFY WITHIN DRIP LINE OF EXISTING TREES TO BE RETAINED, <br />AFN 199910295002 <br />4 ------- <br />hl, <br />WITHIN STORMWATER DRAINAGE SYSTEM LOCATIONS OR LANDSCAPED AREAS (10 PERCENT ORGANIC <br />13 CONTENT) - PLACE AND ROTOTILL 3 INCHES OF COMPOSTED MATERIAL INTO 5 INCHES OF SOIL (A <br />TRACT 998 +00 <br />TOTAL DEPTH OF ABOUT 9.5 INCHES, FOR A SETTLED DEPTH OF 8 INCHES). AS NOTED PREVIOUSLY, <br />+ . ..... SUBSOILS BELOW THIS LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES, FOR A FINISHED MINIMUM <br />DEPTH OF 12 INCHES OF UNCOMPACTED SOIL. RAKE BEDS TO SMOOTH AND REMOVE ROCKS LARGER <br />...... . ... ...... THAN 2 INCHES DIAMETER. MULCH AREAS WITH 2 INCHES OF ORGANIC MULCH, <br />a N <br />b WITHIN LAWN AREAS (5 PERCENT ORGANIC CONTENT) - PLACE AND ROTOTILL 1,75 INCHES OF <br />N1 . . ........ <br />SPLIT RAIL x1_1 <br />... . .......... COMPOSTED MATERIAL INTO 6.25 INCHES OF SOIL (A TOTAL AMENDED DEPTH OF ABOUT 9.5 INCHES, <br />n —0/ <br />001'. <br />FENCE <br />FORA SETTLED DEPTH OF 8 INCHES). AS NOTED PREVIOUSLY, SUBSOILS BELOW THIS LAYER SHOULD <br />7p <br />BE SCARIFIED AT LEAST 4 INCHES, FOR A FINISHED MINIMUM DEPTH OF 12 INCHES OF UNCOMPACTED <br />7_1_1­11­1 w . ....... . ....... <br />..... . SOIL. WATER OR ROLL TO COMPACT SOIL TO 85 PERCENT OF MAXIMUM. RAKE TO LEVEL, AND <br />REMOVE SURFACE WOODY DEBRIS AND ROCKS LARGER THAN 1 INCH IN DIAMETER. <br />4 <br />R TO GRADING FOR REAPPLICATION: <br />717 T777 <br />IF PLACED TOPSOIL PLUS COMPOST OR OTHER ORGANIC MATERIAL WILL AMOUNT TO LESS THAN 12 <br />-2;5 5w�,_ INCHES: SCARIFY OR TILL SUBGRADE TO DEPTH NEEDED TO ACHIEVE 12 INCHES OF LOOSENED SOIL <br />.. . .. . . . .......... <br />AFTER TOPSOIL AND AMENDMENT ARE PLACED. ENTIRE SURFACE SHOULD BE DISTURBED BY <br />SCARIFICATION. DO NOT SCARIFY WITHIN DRIP LINE OF EXISTING TREES TO BE RETAINED. <br />FLOW <br />W <br />1W/UTJLI'T' STOCKPILE AND COVER SOIL WITH WEED BARRIER MATERIAL THAT SHEDS MOISTURE YET ALLOWS AIR <br />R . . . ....... . ...... <br />A f�0 <br />-A� TRANSMISSION, IN APPROVED LOCATION, PRIOR TO GRADING. <br />W, . .... . <br />REPLACE STOCKPILED TOPSOIL PRIOR TO PLANTING. <br />WITHIN STORMWATER DRAINAGE SYSTEM LOCATIONS OR LANDSCAPED AREAS (10 PERCENT ORGANIC <br />CONTENT) - PLACE AND ROTOTILL 3 INCHES OF COMPOSTED MATERIAL INTO 5 INCHES OF REPLACED <br />SOIL (A TOTAL DEPTH OF ABOUT 9.5 INCHES, FOR A SETTLED DEPTH OF 8 INCHES). SUBSOILS <br />BELOW THIS LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES, FOR A FINISHED MINIMUM DEPTH OF <br />12 INCHES OF UNCOMPACTED SOIL. RAKE BEDS TO SMOOTH AND REMOVE ROCKS LARGER THAN 2 <br />X <br />!NCHES' IN DIAMETER. MULCH AREAS WITH 2 INCHES 'OF ORGANIC MULCH OR STOCKPILED DUFF. <br />-EDOE _'WEfLA <br />WITHIN LAN AREAS (5 PERCENT ORGANIC CONTENT) - PLACE AND ROTOTILL 1.75 INCHES <br />' W OF <br />' AREA A <br />COMPOSTED MATERIAL INTO 6.25 INCHES OF REPLACED SOIL (A TOTAL AMENDED DEPTH OF ABOUT <br />y. <br />9.5 INCHES, FOR A SETTLED DEPTH OF 8 INCHES). SUBSOILS BELOW THIS LAYER SHOULD BE <br />SCARIFIED AT LEAST 4 INCHES, FOR A FINISHED MINIMUM DEPTH OF 12 INCHES OF UNCOMPACTED <br />SOIL. WATER OR ROLL TO COMPACT SOIL TO 85 PERCENT OF MAXIMUM. RAKE TO LEVEL, AND <br />\V\ \11 <br />Z <br />REMOVE SURFACE WOODY DEBRIS AND ROCKS LARGER THAN 1 INCH IN DIAMETER. <br />xv, <br />J1, <br />S: <br />A:' L`o� <br />SCARIFY OR TILL SUBGRADE IN TWO DIRECTIONS TO 6 INCHES DEPTH. ENTIRE SURFACE SHOULD BE <br />DISTURBED BY SCARIFICATION. DO NOT SCARIFY WITHIN DRIP LINE OF EXISTING TREES TO BE <br />­k_ <br />RETAINED. <br />...... ...... <br />WITHIN STORMWAT <br />zgroN�30'A•ER DRAINAGE SYSTEM LOCATIONS OR LANDSCAPED AREAS (10 PERCENT ORGANIC <br />CO IMPORTED TOPSOIL MIX CONTAINING 10 PERCENT ORGANIC MATTER (TYPICALLY <br />USE IMPOR <br />p <br />AROUND 40 PERCENT COMPOST). SOIL PORTION MUST BE SAND OR SANDY LOAM AS DEFINED BY THE <br />C> <br />J11, �J, <br />A USDA. PLACE 3 INCHES OF IMPORTED TOPSOIL MIX ON SURFACE AND TILL INTO 2 INCHES OF SOIL. <br />NGPA \v Ny <br />J <br />OVER 2 INCHES DIAMETER. MULCH PLAN IING BEDS WITH 2 IN OF ORGANIC MULCH. <br />PLACE 3 INCHES OF TOPSOIL MIX ON THE SURFACE. RAKE SMOOTH AND REMOVE SURFACE ROCKS <br />A <br />n-, <br />WITHIN LAWN AREAS (5 PERCENT ORGANIC CONTENT) - USE IMPORTED TOPSOIL MIX CONTAINING 5 <br />PERCENT ORGANIC MATTER (TYPICALLY AROUND 25 PERCENT COMPOST). SOIL PORTION MUST BE <br />SAND OR SANDY LOAM AS DEFINED BY THE USDA. PLACE 3 INCHES OF IMPORTED TOPSOIL MIX ON <br />SURFACE AND TILL INTO 2 INCHES OF SOIL. WATER OR ROLL TO COMPACT SOIL TO 85 PERCENT <br />MAXIMUM, RAKE TO LEVEL, AND REMOVE SURFACE ROCKS LARGER THAN 1 INCH IN DIAMETER. <br />NOTE: <br />AMEND SOIL FOR DISTURBED, GRADED <br />OR COMPACTED AREAS ONLY. <br />LEGEND (SEE NOTES) <br />AREA A 0 AREA B <br />BASIC SOIL AMMENDMENT UNCOMPACTED, UNGRADED, <br />UNDISTURBED <br />ml <br />0 30 60 <br />HORIZONTAL SCALE <br />il <br />z <br />0 <br />i <br />< <br />w <br />o <br />End <br />> <br />Ill <br />ILL <br />X <br />0 <br />DRAWING NO, <br />7 or 7 <br />