My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/08/31 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/08/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 9:46:16 AM
Creation date
9/1/2022 9:38:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/31/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D - EMC 15.02 LAND USE AND PROJECT REVIEW PROCEDURES <br />use permit and modification of standards. The <br />2. Notice of the request for modification of standards of the time and place of the public hearing <br />shall be provided with a ten-day comment period to the applicant and to any person who, prior to <br />the rendering of the decision on the permit, made a written request for notice or submitted <br />substantial comments on the application for the permit. The public hearing procedures shall be as <br />specified in Section 15.02.200. <br />�3. The hearing examiner planning director shall issue findings within tcn business days of the <br />conclusion of the hearing following the notice comment period. Within three business days of <br />rendering the written decision, copies shall be mailed to the applicant and all who have requested <br />notice to the planning director. by signing a register provided at the hearing. The hearing <br />examiner's planning director's decision shall constitute the city's final decision. Any An appeal of <br />the city's final decision planning director's decision may be to the hearing examiner in accordance <br />with EMC 15.02.600(D)(2).only be made to Snohomish County superior court in accordance with <br />Chapter 36.70 RCW. <br />3. In considering whether the modification should be granted, the city shall first consider the effects on <br />the health and safety of residents and the community. The burden of proof shall be on applicant. <br />EMC 15.02.070 Review Process II —Planning director review. <br />B. REV lI Decisions Included. The following permit applications are included as REV II decisions: <br />2. Modification of Development Standards. The following modification of development standards <br />allowed by this title are included as REV II decisions: <br />a. Accessory dwelling units (Section 19.08.100); <br />b. Modification of lot width requirements or on -site open space standards (Chapter 19.08); <br />c. Modification of specific use standards (Chapter 19.13); and <br />d. Modification of structured parking standards (Section 19.12.110). <br />e. Modification to specific standards for outdoor emergency shelters (Sections 15.02.140(D) <br />and 19.08.200. <br />C. Public Notice Requirements. Public notice of REV II decisions shall include notice of application and <br />notice of decision. <br />2. Specific Land Use Notice Requirements. In addition to the general requirements outlined <br />above, the following notices are required as set forth below: <br />d. Buildings which provide shelter for survivors of domestic violence are exempt from <br />notice to adjacent property owners. <br />1 i <br />EVERETT <br />Planning Commission Resolution 22-02 <br />Homeless Shelters and Housing Code Amendments <br />Exhibit D: EMC 15.02 Land Use and Project Review Procedures <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.