Laserfiche WebLink
Ao��� m• <br />,J <br />, <br />!;T <br />4 <br />PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425)257-8810 <br />Date: 12/11 /2008 <br />Public Works Permit #: PW0812-005 <br />Buildinq Permit #: <br />Planninq Reference #: <br />Public Works Fee $: $ 45.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />I BOEING COMPANY PETE MCGUIRE <br />PO BOX 3707 MS 1 F 09 <br />SEATTLE WA 98124 <br />PHONE: PHONE: 4252383768 <br />TAX PARCEL ID # 28041000100200 SITE ADDRESS: 3003 W CASINO RD <br />DESCRIPTION OF PROPOSED WORK <br />PATIO PAVERS IN THE R-O-W - TWO LOCATIONS <br />LOCATION #1 BOEING ENTRANCE 8 SEAWAY BLVD <br />LOCATION #2: PERIMETER RD 8 SEAWAY BLVD <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig TOLL FREE NUMBER 811 <br />4. Boeing shall be responsible for installing and maintaining these facilities <br />Approv for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />s3Ur U <br />,)AN 2 Zoe <br />ACKNOWL EDGEf�1�NTOF'ICONDIT10NS <br />The undersigned ownertapplicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the Improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />publiG.p operty damaged thereby. <br />Signature of Ap icanI Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT 15 ISSUED AND THEREAFTER IS TO BE DILIGENRY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />