My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 LARIMER RD 2022-09-20
>
Address Records
>
LARIMER RD
>
7301
>
7301 LARIMER RD 2022-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 2:22:54 PM
Creation date
9/20/2022 2:22:52 PM
Metadata
Fields
Template:
Address Document
Street Name
LARIMER RD
Street Number
7301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 7/6/2009 <br /> City of Everett Public Works Department Public Works Permit#: PW0907-002 <br /> 3200 Cedar Street Building Permit#; <br /> Everett, WA 98201 <br /> Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee $: $ 25.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ZEPP RESOURCES ALBERT ZEPP <br /> 225 DUNLAP RD <br /> ELMA WA 98541 <br /> PHONE: 3604824244 PHONE: 3604700669 <br /> TAX PARCEL ID# SITE ADDRESS: S OF 7301 LARIMER RD <br /> DESCRIPTION OF PROPOSED WORK: <br /> HARVEST POPLAR TREE FARM (JUNE 24 -SEPT. 15, 2009) <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Driveway modification can only be temporary and must be removed within 30 days of the end of this permit <br /> 5. Hauling and returning trucks must use access from the south and are restricted to travel to and from the north; <br /> 6. Applicant shall remove and replace the guard rail as directed by the City Traffic Dept. Replacement must-be Gale �% <br /> within 30 days r c. _ " <br /> 7. Public roadways are to be kept clean at all times. r M <br /> � O <br /> ?alit <br /> Z <br /> u• <br /> ��? .""•V 1<.__ <br /> a <br /> Col <br /> ca r•� <br /> c <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> roved for Construc ion ate to remove same upon notice from the City and to replace <br /> pp public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.