Laserfiche WebLink
INSPECTION REPORT <br />IK L'{CEO <br />Contractor, (C71 L_ <br />Owner ` <br />Date U(— [� _—��C _-__— <br />J APPROVAL J PARTIAL APPROVAL <br />J VIOLATION J CORRECTION REQUESTED <br />Corrections listed below MUST BE MADE before work can be approved. <br />Please contact inspector and arrange for appointment. <br />Was not able to perform inspection. <br />J CALL 259.8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />` nvarr_l; I IUN HEQUESTED <br />Temp. Elect. J Framing J Gas Piping <br />❑ Footing J Drywall. Nailin I- p <br />O Foundation J Shear Nailingg J Consultation <br />❑ Ductwork ;J grid U Groundwork <br />U Wood Stove ough-in JO Final t. Slab <br />1 Masonry U Service U Insulation <br />J Other <br />U BLDG: Pmt. No. XMECH: Pmt. <br />U ELEC: Pmt. No. _ J PLBG: Pmt. No. <br />