My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8310 RIM DR Geotech Report 2018-01-02 MF Import
>
Address Records
>
RIM DR
>
8310
>
Geotech Report
>
8310 RIM DR Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:15:42 PM
Creation date
9/22/2022 7:32:22 AM
Metadata
Fields
Template:
Address Document
Street Name
RIM DR
Street Number
8310
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnicel Engineering Evl�,,,ation <br /> 8310 Rim Drive- Ryan <br /> Novembcr 8, 2004 <br /> RMI PileNo. 21G04 <br /> Page 12 <br /> We suggcst thnt we provide uh�crvalion of the cnrthwork phases of development. �his shuuld include <br /> grnding, foundation construcUon, and setbnek;, drainage installation, nnd erosion control meusures. <br /> Although ���e expcc' site gcology. ;oil types, conditions. and distributions to te ns discussed herein, some <br /> variations in subsurftuc conditions could occur. Should conditions other than those discussed above be <br /> encountered, thc gwtechnical c�nsulinnt should be notiflcd for rcvicw nnd comment. Additional or <br /> altemative rccommendations ma� be rcquircd. <br /> USE OF THIS RI:YORT <br /> This report is the pruperty of RMI Associntes, Lid. nnd has bcen prepared for Mr. & Mrs. Ryan mid <br /> tlicir agents for usc in pinnning and dcsign of this project on this site only. Th�data and report should be <br /> p;ovidcd to prosp=cti��e contrnctors for thcir bidding nnd estimating purpases, but our report,conclusions <br /> nnd intcrprctations slwuld not be construcd a, n warrnnty of suhsurface conditions. At tlie time of this <br /> report, finnl pinns werc not availablc. VVe rccommcnd thnt we bc retained to re�iew tinal plans prior to <br /> thc start ol'constniction to chcck for confor�mncc with thc rccommcndntions in this report. <br /> l'he sccpe of our �vork does nol includ� services related to consvuction safety precautions, nnd our <br /> recommcndations are not intendcd to direct the contractors' methods, techniques, sequences or <br /> proccdures, except as specifically described in our rcport for considerntion in design. There are possiblc <br /> variations in subsurfnce cunditions. We recommend that pn.l�cl planning inciude contingencies in <br /> hudget and schcdulc should arcas bc found �vith conditions t!int vary Gom ihose described in this rcport. <br /> Within thc limitntions of scopc, schedule and budget, uur services have bcen perfonned in accordance <br /> with generall�� accepted geolechnica! engineering practices in effect in this nrca et the time t'�is report <br /> �ras prepared. No other ���arranty, cspresscd or implicd, is madc. Our observations, findings, and <br /> opinions arc a mcans t�� idcntily and rcJucc the inherent risks to the owner. <br /> RMI Associates, Ltd. <br />
The URL can be used to link to this page
Your browser does not support the video tag.