Laserfiche WebLink
� <br /> Gcotechnical Lnginccring 6J.��onticn <br /> 8310 Rim Drivc- Ryan <br /> Novembcr 8,2004 <br /> RMI Pilc No. 21GOd <br /> Page 5 <br /> Am' dislurbcd arcus should hc reslabilizcd as soon as possiblc through vcgetation planting or other <br /> approved means. Within cxposcd soil arcas, veget�tion planting, hydro-secding, and/or straw mulcliing <br /> arc cffcctivc mcuns tn minimizc crosiun and nllo�l� vcgetntion to bcgin rapidlv. All c�cavntion sn�ils <br /> should be_,;vcred with ,ilnstic in thc cvent nf rain to minimizc thc potcntial for erosion and siltntio:: <br /> Surfacc Drainagc <br /> It is dcsirnblu that posi�ive surface drain�ge be provided so as to direct surface ��ater awny from lhe crest <br /> oi the slope and the foimdmions of the building. Ponding of surfuce water should not be allo�sed ndjaceni <br /> to thc vtructurc or thc slopc. It ie rccommcndcd that thc ground surfncc nc�t to thc building be slopcd at <br /> nbout 3 dcgrccs a�v�y from the buiiding for n minimum of 10 fcet. It is imperntive thnt concentrated watcr <br /> Ilo�c nul bc �illuacd n�ross anv clopcs �-. :n��ion or�vcakening of surtacc so��s could occur. <br /> �ubsurfs�cc Crainagc <br /> ►t is good practice to use e�terior fuoting d,ains around all oP the structures �vhere moisture con6-ol :s <br /> important. Pooting drains should be iu�;a!'ed nt Icast I loot oelow the pinno-,:d finished floor slab or <br /> crawl space clevatinn. llic drains shou � consist of 4-inch-dimaeler, rigid, perforated PVC pipe <br /> surcounded by Gee-draining matcrial, such as pca cravcl wrapped in a non-woven filtcr fabric °uch as <br /> Mirati 140NSL. Footing drains sliould discharge into tightlines Iending to an nppropriute collection and <br /> dischargc point. In addition, thc "higli' end and all 90-degree hcnds o( the subdrain pipe should be <br /> cnnn,;.•ted to a riser, �vhich e�tends to tl�e surfacc and acts as a cicnn-out Gawl spaces should be sloped <br /> to dra'n, and a positive connection should he made into the foundntion drainage system. Rouf drains <br /> shou'd be tighUined separateh of footine drains. NI drainage slioidd be routed to an appropri�te <br /> disc iargc poiiv. <br /> Sitc Prcpars�tion a�nd Gruding <br /> "I'hc new building nren should be stripped of vegetatiun, topsoil, loose soils, a„a ru ��r �„y). Any <br /> cxcavation into ihe slope should have its slopes laid back to flboul 111: IV (hurizontal: �ertical). The <br /> subgradc bclo�v an}• planned ,lab-on-grade and/or I'oundations should be compnctcd to a dense, non- <br /> yielding condition. Arcas obscrved ro pump o� weavc, shouid bc rep�ired by o��cr-c�cavnting and <br /> replacing��ith thuraughly compacted gram��ar till (structural till). <br /> RMI Associates, Ltd. <br />