My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHINGTON <br /> I <br /> I <br /> CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> FOR <br /> r <br /> WFP EMERGENCY GENERATOR <br /> REPLACEMENT <br /> WORK ORDER # UP-3587 <br /> MAY 2022 <br /> Prepared By: SAZAN GROUP, INC. <br /> I <br /> I <br /> I <br /> Project Manager: Zach Brown, P.E. <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.