My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 63 65 - 2 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> Change Order No. <br /> Change Order Effective Date: <br /> t <br /> As allowed by the contract, the City directs the Contractor as follows: t <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. ' <br /> 2. The Contract Sum shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractually scheduled completion date, <br /> shall be adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the Contract <br /> Documents for seeking further equitable adjustment of time and compensation, I <br /> including, but not limited to, delays, impacts, inefficiencies, overhead, and direct <br /> and indirect costs, and except as otherwise expressly provided herein, the <br /> Contractor will be barred from (a) asserting any claim for further adjustment of <br /> time and compensation arising out of, or relating to, the charges described in this <br /> Change Order or work described in Exhibit A and (b) asserting an equitable <br /> adjustment of time or price arising earlier than the date of this Change Order. This <br /> provision does not apply to requests for equitable adjustment of time or price for <br /> which the Contractor timely and properly provided notice of a differing site <br /> condition, protest, dispute, claim or Contract Claim as required by the Contract <br /> Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends after <br /> the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City <br /> to the extent explicitly provided herein. <br /> 00 63 65 - 2 CHANGE ORDER— UNILATERAL (Addendum 1) <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.