My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 27 <br /> ' Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> materials of construction. Construction Work shall be executed in conformity with the standard practice <br /> ' of the trade. <br /> 8.2. PRODUCT DATA <br /> ' When specified,the Contractor shall provide data required for inspecting,testing,operating,or <br /> maintaining parts of the Work. Unless otherwise specified, such data shall be provided at the time the <br /> referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall <br /> include,unless otherwise specified, such items as shop drawings,erection drawings,reinforcing steel <br /> ' schedules,testing and adjusting instructions,operations manuals,maintenance procedures,parts lists,and <br /> record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability <br /> determined by the Owner in its sole discretion. <br /> I8.3. QUALITY <br /> Where detailed Specifications of materials,Equipment,or construction Work are not set forth,the <br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the <br /> materials and workmanship specified for the other parts of the Work, from firms of established good <br /> reputations, and shall follow standard practices to perform construction Work of good quality in a <br /> ' workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the <br /> standard of construction and Equipment of Work as a whole and in part. All Work must comply and <br /> conform to applicable building codes in effect when the Work is performed. <br /> ' 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> When material or Equipment is specified by reference to patents,brand names, or catalog numbers, the <br /> Owner will not usually consider or approve a substitution. However,the Contractor may offer <br /> ' substitutions of products it considers to be equal to that specified,but the Owner is not obliged or required <br /> to consider or accept such offered substitution. <br /> 8.5. REQUESTS FOR SUBSTITUTION <br /> ' The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's offers of <br /> substitution shall be made in writing to the Owner's Representative and shall include sufficient data to <br /> enable the Owner's Representative to assess the acceptability of the material or Equipment for the <br /> particular application and requirements. The Owner and Owner's Representative are not required or <br /> obligated to consider or review a request for substitution and may, in their sole discretion and option, <br /> ' consider or review such requests. <br /> If the offered substitution requires changes to or coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br /> Contractor from responsibility for the efficiency,quality, and performance of the substitute material or <br /> ' Equipment,in the same manner and degree as the material and Equipment originally specified. Any cost <br /> differential associated with a substitution shall be reflected in the offer. If the Owner approves the <br /> substitution,the Contract Documents shall be modified by a Change Order modifying the Contract Sum <br /> in the amount of the cost differential. <br /> 8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS <br /> 8.6.1. Inspection <br /> ' The burden of proving the constructed Work complies with the Contract Documents shall be on the <br /> Contractor at all times. To demonstrate its compliance with the Contract requirements,the Contractor <br /> shall assist the Owner's Representative in his or her inspection and observation of the Work. The <br /> ' Contractor shall grant the Owner's Representative access to the Work and Work Site,and to places where - <br /> 00 72 00 - 27 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.