My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 22 13 -2 <br /> Water Filter Plant Emergency Generator Replacement WO#3587 1 <br /> assessment of the Bidder's performance, including but not limited to the following <br /> areas: <br /> a. Quality control; <br /> b. Safety record; <br /> c. Timeliness of performance; <br /> d. Use of skilled personnel; <br /> e. Management of subcontractors; <br /> f. Availability of and use of appropriate equipment; <br /> g. Compliance with contract documents; <br /> h. Management of submittals process, change orders, and close-out. <br /> B. Mandatory Pre-Bid Meeting <br /> 1. Criterion: Bidder shall have attended a mandatory pre-bid meeting in accordance <br /> with Section 00 25 13. <br /> 2. Documentation: The Bidder shall have signed the sign-in sheet at a mandatory <br /> pre-bid meeting. 111 <br /> 1.3 PROCEDURE I <br /> A. Requests for Criteria Modification. <br /> 1. A Bidder may request that City modify the supplemental bidder responsibility <br /> criteria listed above. This request must be in writing to the City project manager <br /> and must be received by the City project manager at least ten business days before <br /> the bid opening. The City project manager will evaluate the information submitted <br /> by the Bidder and will respond within three business days after receipt of the111 <br /> request. If City evaluation results in a change of the criteria, the City will issue an <br /> addendum to the bid documents identifying the new or revised criteria. Any protest <br /> of a City decision regarding a request for criteria modification must be in strict111 <br /> conformity with Everett Municipal Code Chapter 3.46, Bid Protest Procedures. <br /> B. Additional Information. <br /> 1. The City may require that the Bidder submit information in addition to the Bidder's <br /> Supplemental Responsibility Statement. The City may requirement <br /> supplementation or revision of the Bidder's Supplemental Responsibility <br /> Statement. The City also reserves the right to obtain information from third parties <br /> and independent sources of information concerning a Bidder's compliance with the <br /> mandatory and supplemental criteria, and to use that information in their <br /> evaluation. The City may consider mitigating factors in determining whether the <br /> Bidder complies with the requirements of the Supplemental Criteria. <br /> C. Appeal of Responsibility Decision. <br /> 1. If the City determines the Bidder does not meet the bidder responsibility criteria <br /> above and is therefore not a responsible bidder, the City will notify the Bidder in <br /> writing with the reasons for its determination. If the Bidder disagrees with this <br /> determination, the Bidder may appeal to the director of the City department <br /> responsible for this Contract (the "Director") by presenting additional information <br /> 00 22 13 - 2 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br /> I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.