My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 25 13 - 1 <br /> ' Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> SECTION 00 25 13 - PRE-BID MEETING <br /> 1 1.1 SUMMARY <br /> A. Two pre-bid meetings will be held to discuss the project. Attendance of at least <br /> one of the pre-bid meetings is mandatory for all prospective bidders. At this <br /> meeting the items on the Agenda will be covered (see 1.5 AGENDA). The <br /> meeting will also include a site walk. <br /> B. Each Bidder must sign the sign-in sheet at the meeting. <br /> C. Attendance at a pre-bid meeting is one of the supplemental responsibility criteria <br /> ' under Supplemental Instructions to Bidders (Section 00 45 13). A Bid received <br /> from a Bidder who did not attend one pre-bid meeting and sign the sign-in sheet <br /> will be found not responsible and the bid will be rejected. <br /> 1 <br /> 1.2 DATE <br /> rA. Meeting 1 - 10:00 a.m., Tuesday, June 7th, 2022 <br /> B. Meeting 2 - 2:00 p.m., Thursday, June 9th, 2022 <br /> 1.3 LOCATION <br /> A. The meeting place will be at the site: 6133 Lake Chaplain Road, Monroe, WA <br /> 98272. <br /> 111 <br /> 1.4 TIME <br /> A. On June 7th, the meeting/site visit will start promptly at 10:00 a.m. <br /> B. On June 9th, the meeting/site visit will start promptly at 2:00 p.m. <br /> 1.5 AGENDA <br /> A. Review Scope of Project <br /> B. Review required documents to be submitted with the Bid Form <br /> C. Bid Due Date <br /> ' D. Review Scope of Work <br /> 00 25 13 - 1 PRE-BID MEETING <br />
The URL can be used to link to this page
Your browser does not support the video tag.