My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 41 13 -6 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> 19, Trench Safety System LS 1 N/A $( oeo °° <br /> (RCW 39.04.180) <br /> 20. Force Account N/A N/A $200,000.00 <br /> (Section 00 72 00) <br /> SUBTOTAL_ <br /> $4sT3 , oo FOOD <br /> Washington State Sales $ ,Glo °° <br /> 10 <br /> Tax@8.5 <br /> TOTAL BID $4,$19t fios'o° <br /> 1.3 ACCEPTANCE ' <br /> A. This offer shall be open to acceptance and is irrevocable for 45 calendar days <br /> from the Bid closing date. I <br /> B. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> 1, Execute the Agreement within 14 calendar days of receipt of Notice of <br /> Award, <br /> 2, Furnish the required 100% payment and 100% performance bonds within <br /> 14 calendar days of receipt of Notice of Award in the form described in <br /> Contract Documents. <br /> 3. Commence Work within seven calendar days after receipt of Notice to <br /> Proceed. <br /> 111 <br /> C. If this Bid is accepted within the indicated time, and we fail to commence the Work <br /> or we fail to provide the required bonds, the Bid security shall be forfeited as <br /> damages to the Owner by reason of our failure, limited in amount to the lesser of <br /> the face value of the Bid security or the difference between this Bid and the Bid <br /> upon which Contract is signed. <br /> D. In the event our Bid is not accepted within the time stated above, the required Bid <br /> security will be returned to the undersigned, according to the provisions of the <br /> Instructions to Bidders, unless a mutually satisfactory arrangement is made for 1 <br /> its retention and validity for an extended period of time. <br /> 1.4 CONTRACT TIME <br /> A. If this Bid is accepted, we will: <br /> 1. Begin work immediately after receiving Owner's letter of Notice to Proceed <br /> and to reach Substantial Completion within the dates required under the <br /> Contract Documents. <br /> 2. Agree to pay liquidated damages to the City as stated in the Contract in the <br /> event the project is not completed on or before required time periods. <br /> 004113 - 6 BID FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.