Laserfiche WebLink
' City of Everett 00 43 36 - 1 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> ' SECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM <br /> 1, For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br /> ' 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br /> installation and rebar installation, Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the <br /> ' Work, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work <br /> identified, unless Subcontractors vary with Bid alternates, in which case the Bidder <br /> must indicate which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation and air conditioning, plumbing, electrical work, <br /> structural steel installation and rebar installation, Bidder fails: (1) to submit <br /> ' as part of the Bid the names of such Subcontractors; (2) to name itself to <br /> perform such Work; or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> ' 4. The requirement to name the Bidder's proposed heating, ventilation, air <br /> conditioning, plumbing, electrical, structural steel installation and rebar installation <br /> ' subcontractors applies only to proposed heating, ventilation, air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors who will contract directly with the general contractor submitting the <br /> Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, and electrical portions of <br /> the chart below must be submitted with the bid proposal or within one hour of the <br /> ' published bid submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below <br /> must be submitted with the bid proposal or within forty-eight hours of the published <br /> bid submittal time. <br /> Type/Scope of Work Name and Address of Subcontractor or <br /> Bidder <br /> HEATING 51,6 vi 041'11A <br /> Subcontractor, bidder or "no work" MUST be iQ,602. cop% S, K,74- v0A,a` 'a2- <br /> stated <br /> VENTILATION AND AIR CONDITIONING rimvovr4C,v, <br /> Subcontractor, bidder or"no work" MUST be t ,Z c0 ? S W A c o3 L <br /> stated <br /> PLUMBING (as described in RCW Chap. SYtiAN+ Q ,M,C.At. <br /> 18.106) U2- t ' M2 S. 4- WA , °t�3L <br /> ' Subcontractor, bidder or "no work" MUST be t% <br /> stated <br /> 00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM <br />