My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 52 13 - 4 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 1 <br /> 9. Insurance. The Contractor shall purchase and maintain such insurance as set forth <br /> in the Contract Documents Failure to maintain such insurance shall be a material , <br /> breach of the Contract. The City shall be entitled to damages for such a breach that <br /> include, but are not limited to, any loss (including, but not limited to, third party litigation <br /> expenses and professional fees) suffered by the City if the City is determined to be ' <br /> solely or concurrently negligent, and if the City suffers any loss or must pay or defend <br /> against any such claim, suit, demand or damage as a result of such breach. <br /> 10 Waiver of Industrial Insurance Immunity. Contractor waives any right of I <br /> contribution against the City. It is agreed and mutually negotiated that in any and all <br /> claims against the City, its agents or employees, the Contractor, a subcontractor, <br /> anyone directly or indirectly employed by the Contractor or subcontractor, or anyone for <br /> whose acts any of them may be liable, the defense and indemnification obligations <br /> hereunder shall not be limited in any way by any limitation on the amount of damages, <br /> compensation, or benefits payable by or for the Contractor or any subcontractor under <br /> industrial worker's compensation acts, disability benefit acts, or other employees' <br /> benefit acts. Contractor's and City's signatures hereto indicate specific waiver of <br /> Contractor's industrial insurance immunity in order to fulfill the indemnities hereunder. <br /> Solely for the purpose of indemnification and defense as provided in this Contract, the <br /> Contractor specifically waives any immunity under the State Industrial Insurance Law, <br /> Title 51 RCW. The Contractor expressly acknowledges that this waiver of immunity <br /> under Title 51 RCW was the subject of mutual negotiation and was specifically entered <br /> into pursuant to the provisions of RCW 4.24.115. 1 <br /> 8. Repair of Damage. The Contractor agrees to repair and replace all property of the <br /> City and all property of others damaged by it, its employees, subcontractors, suppliers <br /> and agents. <br /> 9. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work <br /> under this contract is to be done at the Contractor's risk and that: (1) prior to submitting <br /> its proposal or bid, it became familiar with the conditions of excavation, subsurface, <br /> backfill, materials, climatic conditions, location, traffic, and other contingencies that may <br /> affect the work and has made its bid or proposal accordingly and (2) that it assumes the <br /> responsibility and risk of all loss or damage to materials or work that may arise from any <br /> cause whatsoever prior to completion. <br /> 10.Headings for Convenience Only. The headings in this document are for <br /> convenience only, and shall not be used or considered to interpret or construe this <br /> document. I <br /> 11.Effective Date. This Contract is effective as of the date of the last person to sign it, <br /> and may be executed in multiple counterparts, each of which shall be deemed an I <br /> original. <br /> [Remainder of Page Intentionally Left Blank] I <br /> 1 <br /> 00 52 13 - 4 AGREEMENT FORM (Addendum 1) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.