My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 63 25 - 2 <br /> Water Filter Plant Emergency Generator Replacement WO#3587 , <br /> H. Cost Savings? <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his , <br /> rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately, and for the required work to make corrections thereof. <br /> Signature must be by a person having authority to legally bind his firm to the above terms. ' <br /> Failure to provide legally-binding signature will result in approval retraction. <br /> Submitted by: ' <br /> Signature Date <br /> Printed <br /> Firm <br /> Address <br /> 1 <br /> Telephone <br /> For use by Architect/Engineer: <br /> Accepted Accepted as Noted Not Accepted Received Too ' <br /> Late <br /> BY: Date: <br /> Remarks: <br /> For use by Owner: <br /> Accepted Accepted as Noted Not Accepted Received Too Late ' <br /> Project Manager Date <br /> Remarks: <br /> END OF SECTION 00 63 25 ' <br /> 00 63 25 - 2 SUBSTITUTION REQUEST FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.