Laserfiche WebLink
EXHIBIT C <br /> Table 1 <br /> City to pay for the following tasks: OME to pay for the following tasks: <br /> DESIGN <br /> All Design and Construction Documents for Design(including Construction Documents) <br /> 415L Street System including costs for the System on the Landfill Pad <br /> associated with connecting and integrating <br /> the 415i Street System with the System. <br /> CONSTRUCTION <br /> 100%of Construction Costs for the 41" 100%of Construction Costs for the System <br /> Street System, on the Landfill Pad. <br /> The City will pay for 100%of the Low OM will pay for 100%of the Low <br /> Permeability Barrier under any City Permeability Baffler on the Landfill Pad, <br /> Amenities/Buildings and 415`Street ROW except for under any City <br /> Amenities/Buildings on the Landfill Pad <br /> LONG TERM MAINTENANCE (O&M) <br /> { Including any conversion, retrofit or closure <br /> of the System <br /> O&M on entire Landfill Property,except for O&M underneath OME Buildings and <br /> O&M paid for by OME extending to the Stub Out beyond OME <br /> building foundations to a connection point at <br /> the System, and alarm system within OME <br /> Buildings on entire Landfill Pad <br /> O&M for any Low Permeability Barrier that O&M for any Low Permeability Barrier that <br /> the City pays to install OME pays to install <br />