My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 6/29/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Military Dept 6/29/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:19 AM
Creation date
9/30/2022 1:15:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
6/29/2022
Council Approval Date
6/22/2022
End Date
4/30/2024
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Tracking Number
0003456
Total Compensation
$946,895.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. The SUBRECIPIENT agrees that land acquired for open space purposes under this grant will be <br /> restricted in perpetuity to open space uses and will be unavailable for the construction of flood damage <br /> reduction levees, transportation facilities, and other incompatible purposes and agrees to comply with <br /> the requirements of 44 CFR Part 80 Property Acquisition and Relocation for Open Space. <br /> c. The SUBRECIPIENT agrees to prepare, execute and record Deed Restrictions for each affected property <br /> utilizing the current Model Deed Restriction provided on the FEMA website or available from the <br /> DEPARTM ENT. <br /> Copies of the recorded deed and attached deed restrictions for each property will be provided to the <br /> DEPARTMENT by project close-out. <br /> d. The SUBRECIPIENT accepts all of the requirements of the deed restriction governing the use of the land. <br /> e. The SUBRECIPIENT ensures that, prior to acquisition of the property, in consultation with the U.S. Army <br /> Corps of Engineers, it has addressed and considered the potential future use of these lands for the <br /> construction of flood damage reduction levees, has rejected consideration of such measures in the future <br /> in the project area, and instead has chosen to proceed with acquisition of permanent open space. <br /> Documentation of this consultation and the SUBRECIPIENT's consideration of this issue will be provided <br /> to the DEPARTMENT by project close-out. <br /> f. The SUBRECIPIENT must, prior to acquisition of the property, consult with the Washington State <br /> Department of Transportation to ensure that no future planned improvements or enhancements are under <br /> consideration that will affect the proposed project area. <br /> Documentation of this consultation will be provided to the DEPARTMENT by project close-out. <br /> g. The SUBRECIPIENT will remove existing buildings from acquired properties within 90 days of settlement. <br /> The SUBRECIPIENT will provide confirmation to the DEPARTMENT as to the date of demolition of each <br /> structure included in the project in its quarterly reports, as well as confirmation that the property has been <br /> returned to "natural" or park/open space condition. <br /> The SUBRECIPIENT will provide digital latitude and longitude coordinates and digital photographs of <br /> each property site after project implementation to the DEPARTMENT by project close-out. <br /> h. The SUBRECIPIENT agrees to complete FEMA Form AW-501, NFIP Repetitive Loss Update Worksheet <br /> for each property identified on FEMA's Repetitive Loss list to document completion of mitigation on the <br /> property. The form is available on FEMA's Web site or available from the DEPARTMENT. <br /> The SUBRECIPIENT will provide a copy of the completed form to the DEPARTMENT by project close- <br /> out. <br /> i. The SUBRECIPIENT agrees to comply with the requirements of 44 CFR§80.19 Land Use and Oversight, <br /> which are incorporated into these conditions by reference. These requirements include, but are not <br /> limited to, the following (which are described further in the 2015 Hazard Mitigation Assistance Unified <br /> Guidance and the Addendum to the 2013 Hazard Mitigation Assistance Unified Guidance which are <br /> incorporated herein by reference): <br /> 1. Restriction on future disaster assistance for damages to the property. <br /> 2. Lists of allowable open space uses as well as uses generally not allowed on acquired open space <br /> land. <br /> 3. Provision for salvage of pre-existing structures and paved areas. <br /> 4. Requirements pertaining to future transfer of property interest. <br /> 5. Requirement for SUBRECIPIENT monitoring and inspection of the acquired property at least <br /> every 3 years. The SUBRECIPIENT will provide the DEPARTMENT with a report on the result <br /> of the inspection within 90 days of the inspection. <br /> 6. Provisions for enforcement of violation of open space requirements. <br /> The Military Department Agrees To: <br /> 1. Provide staff coordination and input regarding grant administration for funding and technical assistance for <br /> project and reviews for mitigation construction projects, as necessary. <br /> 2. Except as otherwise provided in Article II, A.4, of this Agreement, reimburse City of Everett within 30 days <br /> of receipt and approval of signed, dated invoice voucher(s) (state form A-19) with sufficient documentation <br /> of costs to include completion of tasks to date and dated invoices for goods and services purchased. Costs <br /> Mitigation Project Grant Agreement Page 26 of 29 City of Everett, D22-024 Revised <br /> Form 4/17/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.