My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 6/29/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Military Dept 6/29/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:19 AM
Creation date
9/30/2022 1:15:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
6/29/2022
Council Approval Date
6/22/2022
End Date
4/30/2024
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Tracking Number
0003456
Total Compensation
$946,895.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
when this Agreement is terminated, is actually less than above, the actual cost shall be <br /> substituted herein. <br /> b. The value of the contributions by the SUBRECIPIENT to the project shall be $118,361.88 <br /> dollars, or 12.5 percent, at minimum, of the total project cost. The SUBRECIPIENT's <br /> contributions may be cash or in-kind, must be from a non-federal source, must be <br /> reasonable, allowable and allocable, and must comply with all Federal requirements and <br /> regulations. <br /> c. When the DEPARTMENT enters into an agreement with the Federal Emergency <br /> Management Agency (FEMA) to contribute federal funds to this project, that federal <br /> contribution will be $710,171.25 dollars, or 75 percent of the total project cost, whichever <br /> is less. <br /> d. The value of the contributions by the DEPARTMENT to the project shall be $118,361.87 <br /> dollars, or 12.5 percent, at minimum, of the total project cost. The DEPARTMENT's <br /> contributions must be from a non-federal source and must comply with all Federal <br /> requirements and regulations. <br /> e. The DEPARTMENT shall not be obligated to pay any amount beyond that set out in <br /> Subsections c and d above, unless that additional amount has been approved in advance <br /> by both the DEPARTMENT and SUBRECIPIENT and is incorporated by written <br /> amendment into this Agreement. <br /> f. A written amendment will be required if the SUBRECIPIENT expects cumulative transfers <br /> between project budgets, as identified in the Project budget (Attachment 5) and the <br /> Statement of Work and/or description of Project (Attachment 3), to exceed 10% of the <br /> Grant Agreement Amount. Any changes to project budgets other than in compliance with <br /> this paragraph will not be reimbursed. <br /> 3. GRANT AGREEMENT PERIOD <br /> Activities payable under this Agreement and to be performed by the SUBRECIPIENT under this <br /> Agreement shall only be those after the obligation of federal funds on 03/24/2022 and shall <br /> terminate on 04/30/24. This period shall be referred to herein as the Grant Agreement Period <br /> and/or Period of Performance, unless expressly stated otherwise. Costs incurred during the Grant <br /> Agreement Period shall include pre-award costs authorized in writing by FEMA as well as eligible <br /> costs incurred after the effective date of the Grant Agreement Period and before termination. <br /> a. The SUBRECIPIENT shall complete the project as described in the FEMA approved <br /> project application FM-5320-23, incorporated in and made a part of this Agreement by <br /> reference, and as described in Attachments 3, 4, and 5. In the event of extenuating <br /> circumstances, the SUBRECIPIENT may request, in writing, that the DEPARTMENT <br /> extend the deadline for Grant Agreement completion. <br /> b. The Grant Agreement Period shall only be extended by (1) written notification of FEMA <br /> approval of the Grant Agreement Period followed by execution of a mutually agreed written <br /> amendment, or (2) written notification from the DEPARTMENT to the SUBRECIPIENT <br /> addressing extensions of the Department's underlying federal grant performance period <br /> or to provide additional time for completion of the SUBRECIPIENT's project(s). <br /> c. No expenditure made, or obligation incurred, before or after the Grant Agreement Period <br /> shall be eligible, in whole or in part, for grant funds with the exception of pre-award costs <br /> authorized in writing by FEMA. In addition to any remedy the DEPARTMENT may have <br /> under this Agreement, the amounts set out in Article II, section A.2 Project Funding, <br /> above, may be reduced to exclude any such expenditure from participation. <br /> d. Failure to complete the project in a timely manner, as outlined in Attachment 4, is a <br /> material breach of this Agreement for which the DEPARTMENT is entitled to termination <br /> or suspension under Attachment 2, section A.36. <br /> Mitigation Project Grant Agreement Page 3 of 29 City of Everett, D22-024 Revised <br /> Form 4/17/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.