My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 9/29/2022 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
WA ST Dept of Ecology 9/29/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:20:58 AM
Creation date
10/5/2022 11:11:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
9/29/2022
Council Approval Date
9/28/2022
End Date
6/30/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington - Broadway Drainage Improvements
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0001878
Total Compensation
$1,317,050.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 10State of Washington Department of Ecology <br />City of Everett <br />Reduction of CSOs at Two Snohomish River Outfalls Project <br />Agreement No. WQC-2019-EverPW-00051 <br />CHANGES TO SCOPE OF WORK <br />Task Number:2 Task Cost: $1,612,550.00 <br />Task Title:Design Plans and Specs, Environmental Review <br />Task Description: <br />The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY The <br />RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance . <br />A. The RECIPIENT will coordinate the preparation and submittal of State Environmental Policy Act (SEPA) documentation. <br />B. The RECIPIENT is responsible for application of, receipt of, and compliance with all required local, state, tribal and federal <br />permits, licenses, easements, or property rights necessary for the project. <br />C. The RECIPIENT will comply with Executive Order (05-05) cultural resources review requirements. To initiate cultural <br />resources review the RECIPIENT will: <br />1. Submit an ECOLOGY 05-05/106 Form, or a cultural resources survey or assessment completed by a licensed <br />archaeologist to ECOLOGY. All submitted materials must conform to the Washington State Standards for Cultural Resource <br />Reporting (DAHP February 2014). <br />2. Develop and submit an Inadvertent Discovery Plan (IDP) to ECOLOGY. The RECIPIENT will ensure that all contractors <br />and subcontractors have a copy of the completed IDP prior to and while working on -site. An IDP template may be found on <br />the ECOLOGY website. <br />Ground disturbing work (including geotechnical investigations) completed prior to receiving written notice to proceed from <br />ECOLOGY shall not be eligible for reimbursement. <br />D. The RECIPIENT will develop a project Design Report. Projects must be designed in accordance with the Stormwater <br />Management Manual for Eastern Washington , Stormwater Management Manual for Western Washington , or equivalent <br />manual. Project must be reviewed and accepted in writing by ECOLOGY to be eligible for reimbursement . <br />The RECIPIENT will submit one digital copy of the items listed below to ECOLOGY for review. Reduce design figures to <br />11x17 inches in size and ensure they are legible. <br />1. Design Report. For a complete list of required design report elements refer to the ECOLOGY website . <br />The RECIPIENT agrees to respond to ECOLOGY comments. The RECIPIENT must receive an Ecology Design Report <br />Acceptance Letter prior to proceeding to 90 Percent design. <br />Template Version 10/30/2015 <br />DocuSign Envelope ID: 48DA661C-BF00-44C6-9537-339B3BDF963F
The URL can be used to link to this page
Your browser does not support the video tag.