Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> Architectural and Engineering services associated with the improvements to the Forest Park Splash Pad located at <br /> 802 Mukilteo Boulevard,Everett,WA 98203.Services for this project include preparation of construction <br /> documents,permit coordination,cost estimating,bidding and construction administration.The scope of services and <br /> fees listed below outline the work necessary to complete plans,assist with permitting and bidding,and follow <br /> through with construction administration as requested. <br /> ARCHITECTURAL <br /> -Meet with owner representative to discuss and modify design drawings as necessary based on outcome of meeting. <br /> -Develop design drawings for review and approval. <br /> -Develop design drawings that meet the water quality standards,analysis,and sample collection in compliance with <br /> WAC 246-262-050. <br /> CONSTRUCTION DOCUMENTS: <br /> -Refine the existing drawings as required to permit the project and bid to multiple general contractors. <br /> -Develop drawings as required to put project out to bid. <br /> -Drawings will include architectural information including plans,elevations,and details as necessary to convey the <br /> scope of work and product selections to bidding contractors. <br /> -Provide product specifications. <br /> -Provide specifications. <br /> -Provide construction cost estimates at 90%drawings. <br /> BIDDING: <br /> -Assist with contractor questions. <br /> -Perform a walk through of the building with the bidding contractors. <br /> CONSTRUCTION ADMINISTRATION: <br /> -Provide owner with construction support as required to reroof and repairs to structure. <br /> -Answer RFIs and other questions during the construction process. <br /> -Prepare punchlist associated with the work when construction has been substantially completed. <br /> -It is presumed that the city project manager will handle day-to-day construction administration activitites. <br /> MECHANICAL ENGINEERING <br /> The services of a mechanical engineer may be necessary for piping and equipment design associated with this <br /> project. <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated March 13,2022) <br />