My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY ONAMAC 2022-10-14
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
ONAMAC
>
6300 MERRILL CREEK PKY ONAMAC 2022-10-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 2:37:37 PM
Creation date
10/7/2022 10:24:20 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
ONAMAC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Jan 2014 <br />Project Info <br />Project Address 6300 Merrill Creek Parkway <br />Date 12/15/2015 <br />Compliance <br />Tukwilla, WA <br />For Building Department Use <br />forms do not <br />require a <br />password to <br />use. Instructional <br />r / <br />5 1 Z —0Z 9S <br />Applicant Name: Harold Christensen c/o Lance Mueller Architects <br />and calculating <br />cells are write - <br />Applicant Address: 130 Lakeside, Suite 250, Seattle, WA <br />Applicant Phone: 206-325-2553 <br />protected. <br />Project Description <br />❑ New Building ❑ Addition 0 Alteration ❑ Plans Included <br />Lighting Compliance Path <br />O Lighting Power Density Calculations Q Total Building Performance <br />(If Total Building Performance then only LGT-CHK is required.) <br />Lighting Power Allowance <br />0 Building Area Method Q Space -By -Space Method <br />Method Selection required to <br />enable LPA forms <br />Interior Lighting System <br />Description <br />Briefly describe lighting <br />system type and features. <br />Additions and Change of Space Use (C101.4.3 & C101.4.4) <br />❑ Addition area or Change of Space Use area complies with all applicable provisions as stand alone project <br />❑ Addition area is combined with existing building lighting systems to demonstrate compliance with all applicable <br />provisions per C101.4.3 <br />Provide Building Area Method (LTG-INT-BLD) or Space -By -Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (including existing if applicable) lighting wattage of Addition or Change of Use space. Provide applicable lighting <br />controls per C405.2 and commissioning of lighting controls per C405.13. <br />Alterations, Renovations and Repairs (C101.4.3.1) <br />❑ 60% or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space -By -Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed wattage within the lighting retrofit space in Maximum Allowed Wattage table and proposed (including existing) lighting wattage in <br />Proposed Wattage table. Retrofit and non -retrofit spaces shall be documented separately using multiple forms. <br />❑ Less than 60% of luminaires in space replaced <br />Provide a separate Space -By -Space Method (LTG-INT-SPACE) Compliance Form for this retrofit area. Document existing total wattage <br />within the lighting retrofit space in cell provided in the Maximum Allowed Wattage table. Document proposed (including existing) lighting <br />wattage in the Proposed Wattage table. <br />❑ Lamp and/or ballast replacement within existing luminaires only — existing total interior building wattage not increased <br />❑ New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific <br />application controls (C405.2.3), and commissioning of lighting controls per C405.13 <br />❑ New or moved lighting panel <br />Provide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of lighting <br />controls per C405.13. <br />p� Space is reconfigured - luminaires unchanged or moved only <br />Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />❑ No changes are being made to the interior lighting and space use not changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.