Laserfiche WebLink
1/27/22,7:15 AM https://waenergycodes.com/print_project_summary_form.php?k=aWQ9ODIxMSZmdmk9MTcmcmVzZXQ9MQ==&debug=1 <br /> MECHANICAL COMPLIANCE SUMMARY <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI red by:©2022 NEEA,All rights reserved <br /> Project Title CHCSC Everett Central-2018 WSEC For Building Department Use: Date: Jan 27,2022 <br /> 4201 Rucker Ave <br /> Project Address Floors 1 9 3 �f <br /> Project&Applicant Everett,WA 8203 <br /> Q..9 <br /> Information Applicant Name _ 6 Alex Burkhart .13 Not" 1;t/ <br /> Applicant Phone 206-763-1744 lO^ O , <br /> Applicant Email alexb@evergreenhvac.com �• <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@w�St' pdes.4 <br /> General Occupancy All Commercial General Building Use Type Healthcare,Outpatient Therapy Build" d.Floor Area 14,765 <br /> New Building Projec loor , 14,765 <br /> General Project Types Alteration or Addition Alteration Single Zone Systems&Equipment Floors Ally a.• 3 <br /> Mechanical Scope Mechanical Scope <br /> p Compliance t Compliance Method 1-General <br /> Mechanical Project Description Installation of two(2)energy recovery ventilators,two(2)electric duct heaters,two(2)exhaust fans,ductwork,a d grilles/diffusers. <br /> Economizer Equipment Efficiency <br /> Project DOAS Ventilation Higher Equipment <br /> Mechanical Scope Exception(s) OptionApplied? <br /> Compliance <br /> Mechanical Compliance Type Applied? Provided? Efficiency <br /> Verification <br /> Scope and Method <br /> Alteration Single Zone Systems& No Yes NA COMPLIES <br /> Equipment <br /> Additional Efficiency <br /> Credits Included(AEC) <br /> Does building include occupancy classifications requiring Yes Does include DOAS equipment? Yes <br /> DOAS? project <br /> Based on project scope do TSPR requirements apply? No Do all systems comply with Appendix D standard reference design or qualify for an exception to No <br /> TSPR? <br /> Scope&Space Conditioning ALTERATION-SINGLE ZONE SYSTEMS&EQUIPMENT Compliance Verification COMPLIES <br /> Single Zone Air Systems Category-Unit heaters&duct heaters <br /> Air Systems Summary Information <br /> System/Equip ID Quantity of Items Ventilation Standard Ventilation CFM Ventilation Paired with DOAS <br /> (Total if Multiple Items) _ Air Source <br /> DII-2 IMC Ventilation 300 Separate DOAS ERV-2 <br /> DH-1 IMC Ventilation 300 Separate DOAS ERV-1 <br /> Air Systems&Equipment-Heating <br /> System Heating System/Equip Type Specific Type Heating Capacity HE Proposed Heating Efficiency HE Efficiency Compliance <br /> /Equip ID Units Units Verification <br /> DH-1 Duct heater Electric resistance 2 Btu/h COMPLIES <br /> DH-2 Duct heater Electric resistance 2 Btu/h COMPLIES <br /> Air Systems&Equipment Details <br /> System/Equip ID Area(s)Served Location In Project Documents-Plan/Detail# <br /> DH-2 Floor 3 M001,M202 <br /> System/Equip ID for a single or multiple items?:Single item <br /> DII-1 Floor 3 MOOI,M202 <br /> System/Equip ID for a single or multiple items?:Single item <br /> https://waenergycodes.com/print_project_summary_form.php?k=aWQ90DIxMSZmdmk9MTcmcmVzZXQ9MQ==&debug=1 1/1 <br />