My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2022-10-07
>
Address Records
>
RUCKER AVE
>
4201
>
COMMUNITY HEALTH CENTER
>
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2022-10-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2022 11:08:38 AM
Creation date
10/7/2022 11:07:05 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4201
Tenant Name
COMMUNITY HEALTH CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/25/2022 City of Everett Page <br /> 3:23:48PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. K2202-003 Site Address 4201 RUCKER AVE FLRS 1 &3 <br /> Applied 2/11/2022 Applicant HAYDENBAUMANN Lot <br /> Approved 3/2/2022 Owner COMMUNITY HEALTH CENTER OF SNO COUNTY Block <br /> Issued 3/7/2022 Contractor FIRE SPRINKLERS INCORPORATED Tract <br /> Parent Permit No. B2112-008 Description ADD&RELOCATE SPRINKLERS FOR NEW WALLS&CEILIA <br /> Notes <br /> Scheduled Comnleted Tine Insnector Result Remarks Insnector's Comments <br /> 5/5/2022 5/5/2022 ADMIN OTHER AEA OTHER REV AFTER ISSUE <br /> -ISSUED <br /> 5/16/2022 5/16/2022 AM K 03-FIRE RJJ APPROVAL single head rough-in (5/13/2022 9:49 AM KAB) <br /> SUPPRESSION approved Derek Stand 206-305-2392 <br /> 5/31/2022 5/31/2022 PM K 03-FIRE JA CORRECTION see notes (5/27/2022 3:56 PM JA) <br /> SUPPRESSION Cover Inspection 3rd Floor. <br /> Contact: <br /> Josh 206-214-7268 <br /> (5/31/2022 2:43 PM JA) <br /> Sprinkler pipe broke under hydro.2hr <br /> hydro needed floor 3 as well as sprinkler <br /> placement throughout drop ceiling in foyer <br /> hallway. <br /> 6/13/2022 6/13/2022 PM K 02-FIRE JA APPROVAL Hydro and cover (6/10/2022 9:07 AM JA) <br /> SUPPRESSION floor 3 Approved If possible isolate 3rd floor and hydro <br /> system.System failed last inspection on <br /> 5/31/22 <br /> (5/27/2022 3:56 PM JA) <br /> Cover Inspection 3rd Floor. <br /> Contact: <br /> Josh 206-214-7268 <br /> 6/16/2022 6/16/2022 K 02-FIRE JA NOT READY System not to <br /> SUPPRESSION pressure <br /> 6/16/2022 6/16/2022 AM K 03-FIRE JA NOT READY Complete with (6/15/2022 2:39 PM JA) <br /> SUPPRESSION Hydro Derric Strand 206-305-2392 <br /> First floor cover <br /> 6/21/2022 6/21/2022 K 02-FIRE JA APPROVAL Floor 1 <br /> SUPPRESSION <br /> 6/21/2022 6/21/2022 K 03-FIRE JA APPROVAL Floor 1 (6/21/2022 8:08 AM JA) <br /> SUPPRESSION Contact: <br /> Josh 206-214-7268 <br /> 7/22/2022 AM 7/22/2022 AM K 04-FIRE KAB APPRVD-PERK (7/21/2022 12:08 PM KAB) <br /> SUPPRESSION Shawn 253-370-4405 <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.