My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4404 THOMSON AVE 2022-10-07
>
Address Records
>
THOMSON AVE
>
4404
>
4404 THOMSON AVE 2022-10-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2022 1:03:23 PM
Creation date
10/7/2022 1:03:19 PM
Metadata
Fields
Template:
Address Document
Street Name
THOMSON AVE
Street Number
4404
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/25/2022 Page I <br /> City of Everett <br /> 6:32:39AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. M2207-103 Site Address 4404 THOMSON AVE <br /> Applied 7/29/2022 Applicant JOHN HUGHES Lot <br /> Approved 7/29/2022 Owner WILLIAMS INVESTMENTS Block <br /> Issued 7/29/2022 Contractor MORGAN MECHANICAL INC Tract <br /> Parent Permit No. Description REPLACE EXISTING WATER HEATER <br /> Notes <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 8/8/2022 8/8/2022 MECH 06-FINAL BGA PARTIAL APPR eTRAKiT Inspection 8/4/2022 3:55 PM MORGAN <br /> Request MECHANICAL INC <br /> Contact Name:Jeff Hayes <br /> Site Address: 12314 134th.Court N.E. <br /> Phone:4252182844 <br /> e-Mail:jeffhayes@hvacmorgan.com <br /> (8/8/2022 1:01 PM BGA) <br /> 1.Tankless,storage tank and related piping <br /> are approved.Backflow RI installation is <br /> okay but contractor must purchase a permit <br /> and have the backflow tested prior to final. <br /> 8/10/2022 8/10/2022 MECH 06-FINAL BGA CANCELLED eTRAKiT Inspection 8/9/2022 3:30 PM MORGAN <br /> Request MECHANICAL INC <br /> Contact Name:Jeff Hayes <br /> Site Address:12314 134th.Court N.E. <br /> Phone:4252182844 <br /> e-Mail:jeffhayes@hvacmorgan.com <br /> (8/10/2022 7:44 AM BGA) <br /> 1.Inspection cancelled,final approval <br /> issued upon receit of backflow testing <br /> report. <br /> 8/24/2022 8/24/2022 MECH 06-FINAL JJM APPRVD-PERN <br /> INSP12 Miffs T EPA <br />
The URL can be used to link to this page
Your browser does not support the video tag.