Laserfiche WebLink
i • <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Tuesday, November 16, 2021 9:43 AM <br /> To: bereket1973@gmail.com <br /> Subject: City of Everett Permit Services: 2421 81st Place SE (B2110-029) - First Building Intake <br /> Review <br /> Attachments: 2018 IRC_Typical Code References_04-12-2021.docx; CoE_Residential Drawing <br /> Preparation_Edited 09-27-2021.pdf <br /> Hello, Bereket. <br /> Your application has been received and a permit set up. However,the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Information is attached to provide guidance. Revised construction-level documents should be submitted for <br /> review. Two complete sets of the revised drawings should be submitted to replace the previously submitted <br /> drawing sets. Preliminary comments are provided below to assist in revising the drawings, but these are not <br /> intended to provide a comprehensive review. The resubmittal documents should include an itemized <br /> response letter clarifying how the review comments below have been addressed. Depending on your <br /> experience with the adopted codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> Intake Review Comments: <br /> General: <br /> 1. The proposed project involves converting a single-family residence into an adult family home (AFH). The <br /> submittal documents are required to include the AFH checklist. The checklist should include a floor plan <br /> on 8.5x11 paper per Section 3. Complete Sections 1, 2, and 4; do not complete Section 5. Submit the <br /> entire checklist with the floor plan. See the following link for the checklist: <br /> https://everettwa.gov/DocumentCenter/View/108/Adult-family-home-checklist-PDF <br /> 2. The drawings should include a schedule of residents for each room. Total residents should not exceed 6. <br /> 3. The project should specify the applicable building codes, including but not limited to the 2018 IRC, 2018 <br /> WSEC, and the 2018 IBC. See Section R106.1.1 and EMC Section 16.005.030. <br /> 4. The proposed scope-of-work is not clear. The drawings should clearly delineate between existing and new <br /> r work using established drafting standards. All demolition should be shown on the existing floor plans. All <br /> new construction should be shown on the new floor plan. Where the proposed project includes <br /> modifications existing building components (e.g., gypsum wall board, insulation, etc.), these components <br /> should be similarly delineated from existing component that are not being altered. See IRC Section <br /> R106.1.1. <br /> Architectural: <br /> 3 <br />