Laserfiche WebLink
DocuSign Envelope ID:82CF488E-D010-423F-A510-7E548D1F9C38 <br /> State of Washington Department of Ecology Page 17 of 44 <br /> Agreement No: WQC-2022-EverPW-00030 <br /> Project Title: Water Quality Retrofit/Improvements;City of Everett's Programmatic Effort <br /> Recipient Name: City of Everett <br /> SCOPE OF WORK <br /> Task Number: 6 Task Cost: $14,300.00 <br /> Task Title: Project Close Out <br /> Task Description: <br /> The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY.The <br /> RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance. <br /> A. The RECIPIENT will operate and maintain the constructed facility for the design life of the facility.The RECIPIENT will <br /> develop and submit an Operations and Maintenance(O&M) plan for all facilities constructed with ECOLOGY funding to <br /> ECOLOGY for review.The O&M plan must address long-term activities to assure ongoing pollutant removal and flow-control <br /> capability of the project in accordance with the design manual. O&M plan development guidance is located in the Design <br /> Deliverables Document available on the ECOLOGY website.Allow 15 calendar days for ECOLOGY review. <br /> B. The RECIPIENT will calculate and submit a final equivalent new/re-development area for the completed retrofit project(s) <br /> using the methods outlined in the Design Deliverables Document. <br /> C. The RECIPIENT will submit the final GIS compatible project area in shapefile,geodatabase file,or ECOLOGY-approved <br /> equivalent.The project area should include polygon features for stormwater facilities and contributing areas. <br /> D. The RECIPIENT will submit the Recipient Closeout Report(RCOR)in EAGL in accordance with Task 1. <br /> E. The RECIPIENT will submit the Two-page Outcome Summary Report using the ECOLOGY template in accordance to <br /> Task 1.Upload the Two-page Outcome Summary Report in the RCOR in EAGL. <br /> Task Goal Statement: <br /> The RECIPIENT will complete all close out submittals in a timely manner. <br /> Task Expected Outcome: <br /> * Timely and complete submittal of O&M plan,equivalent area calculation,GIS,Recipient Closeout Report, and Two-page <br /> Outcome Summary Report. <br /> *Proper maintenance of the constructed facility to maintain water quality benefits. <br /> Template Version 12/10/2020 <br />