My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 8/21/2022
>
Contracts
>
6 Years Then Destroy
>
2025
>
WA ST Dept of Ecology 8/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:18 AM
Creation date
10/7/2022 3:42:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
8/21/2022
Council Approval Date
8/10/2022
End Date
6/30/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
WQC-2022-EverPW-00084 100th St SW Stormwater
Tracking Number
0003493
Total Compensation
$226,000.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:478DAF06-A27F-4277-9842-A0AA8B37CB3D <br /> State of Washington Department of Ecology Page 14 of 43 <br /> Agreement No: WQC-2022-EverPW-00084 <br /> Project Title: 100th St.SW Regional Stormwater Facility Study <br /> Recipient Name: City of Everett <br /> SCOPE OF WORK <br /> Task Number: 4 Task Cost: $27,983.00 <br /> Task Title: Preliminary Design and Alternative Selection <br /> Task Description: <br /> The RECIPIENT will conduct a review of the available information and examine potential stormwater treatment and flow <br /> control facilities that will serve both the existing developed areas and the future road improvements. <br /> A. Using information collected in Data Collection task, the RECIPIENT shall prepare concept level design for potential flow <br /> control and treatment facilities. Alternatives shall consider land use,contributing areas,property acquisition scenarios and <br /> facility types. A comparative cost estimate shall be prepared for each alternative to facilitate comparison. <br /> B. The RECIPIENT will prepare documentation for review by internal project stakeholders to examine alternatives. <br /> RECIPIENT will convene one or two charrette style meetings to select a preferred option. Stakeholders may include internal <br /> City surface water and maintenance and real property staff,Ecology and other environmental review staff. The RECIPIENT <br /> will consult property owners, prior to selecting a preferred alternative. <br /> C. The RECIPIENT will provide a description of the selection process and the preferred alternative selected. <br /> D. The RECIPIENT will complete initial due diligence to ensure that the selected property has no major concerns, liens, etc. <br /> before completing the design process. <br /> Task Goal Statement: <br /> The RECIPIENT will assess and select the best alternatives for advancement to final design with project stakeholders. <br /> Task Expected Outcome: <br /> Potential sites,contributing area, land use and property acquisition scenarios,and facility types will be compared and narrowed <br /> down to a list for review at a charrette,where they will be narrowed down further to one design. <br /> Template Version 12/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.