Laserfiche WebLink
DocuSign Envelope ID:478DAF06-A27F-4277-9842-A0AA8B37CB3D <br /> State of Washington Department of Ecology Page 16 of 43 <br /> Agreement No: WQC-2022-EverPW-00084 <br /> Project Title: 100th St.SW Regional Stormwater Facility Study <br /> Recipient Name: City of Everett <br /> SCOPE OF WORK <br /> Task Number: 5 Task Cost: $39,725.00 <br /> Task Title: Design Plans and Specifications <br /> Task Description: <br /> The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to ECOLOGY. The <br /> RECIPIENT must review project eligibility and approve all materials prior to submitting them to ECOLOGY for acceptance. <br /> A. The RECIPIENT will develop a stormwater retrofit project design. The design submittals must conform to the Design <br /> Deliverables for Stormwater Projects with Ecology Funding(Design Deliverables Document). Projects must be designed in <br /> accordance with the Stormwater Management Manual for Eastern Washington, Stormwater Management Manual for Western <br /> Washington,or equivalent manual. Refer to the ECOLOGY website for specific guidance. Project must be reviewed and <br /> accepted in writing by ECOLOGY to be eligible for reimbursement. <br /> The RECIPIENT will upload the design submittals listed below to EAGL for ECOLOGY review. Reduce design figures to <br /> 11x17 inches in size and ensure they are legible. <br /> 1. The RECIPIENT will submit a Design Report to ECOLOGY for review and acceptance. Allow 45 calendar days for <br /> ECOLOGY review. <br /> The RECIPIENT agrees to respond to ECOLOGY comments. The RECIPIENT must receive an Ecology Design Report <br /> Acceptance Letter prior to proceeding to 90 Percent Design. <br /> 2. The RECIPIENT will submit a 90 Percent Design Package to ECOLOGY for review and acceptance.At a minimum,this <br /> package must include 90 percent plans,specifications, engineer's opinion of cost,which includes a schedule of eligible costs, <br /> and project construction schedule. The current required bid inserts and specifications may be found on the Ecology website. <br /> Allow 45 calendar days for ECOLOGY review. <br /> The RECIPIENT agrees to respond to ECOLOGY comments. The RECIPIENT must receive an Ecology 90 Percent Design <br /> Acceptance Letter prior to proceeding Final Design. <br /> B. The RECIPIENT will calculate and submit a preliminary equivalent new/re-development area for the completed retrofit <br /> project(s)using the methods outlined in the Design Deliverables Document. <br /> C. The RECIPIENT will submit a preliminary GIS compatible project area in shapefile,geodatabase file,or <br /> ECOLOGY-approved equivalent. The project area should include polygon features for stormwater facilities and contributing <br /> areas. <br /> Task Goal Statement: <br /> The RECIPIENT will complete all design tasks and respond to ECOLOGY comments in a timely manner. <br /> Task Expected Outcome: <br /> Template Version 12/10/2020 <br />