Laserfiche WebLink
EROSION, SEDIMENTATION AND WATER QUALffY SITE I P TiO S <br />PRIOR TO ANY SITE DEVELOPMENT WORK TAKING PLACE, A PRE -CONSTRUCTION MEEiNG MOTH THE CONTRACTOR OWNER, CESCL, AND <br />CITY INSPECTOR SHALL BE HELD. <br />7HE DEPARTMENT OF ECOLOGY REQUIRES THAT LAND DISTURBANCE CONSTRUCTION PROJECTS ONE ACRE OR LARGER RETAIN A CESCL TO <br />ENSURE THAT THE PROJECT IS /N COMPLIANCE KITH THE CURRENT EROSION, SED{MENTAITON AND WATER QUALITY STANDARDS FOR <br />EMERGENCY PURPOSED, 714E CESCL CONTACT PER FOR THIS PROJECT IS ELDEN D. McCALL, (425) 903-1399 <br />ON LAND DISTURBANCE CONSTRUCTON PROJECTS OF ONE ACRE OR LARGER 774E CESCL IS RESPONSIBLE FOR: <br />A. INSPEC77NG THE CONSTRUCTION SITE TO ENSURE THAT ALL CONSTRUCTION SWPPP MEASURES ARE FUNG770NING AS INTENDED. <br />B. ALLOCA77NG RESOURCES TO REPAIR ALL EROSION CONTROL STRUCTURES THAT ARE IN NEED OF MAINTENANCE. <br />C° MONITORING DATER QUALITY FOR ANY STORM DRAINAGE THAT LEAVES THE SITE. <br />D. AND HAVE THE AUTHORITY TO STOP AND/OR REDIRECT CONS7RUC770N AC77077ES DEEMED NECESSARY 70 PROTECT THE <br />ENVRONMENT <br />SHOULD BMP PERFORMANCE GOALS NOT BE ACHIEVED, THE ONLY CONSTTRUC77ON AC77VI77ES THAT SHALL BE ALLOWED ARE THE REPAIR <br />OF EXIS77NG EROSION CONTROL S77?UCTURES, INSTALLA77ON OF ADD17701VAL BMP'S TO MINIMIZE THE 7RANSPORT OF SEDIMENT OFFSITE, OR <br />THOSE AC77077ES 771AT DO NOT DISTURB EXPOSED EARTH AND DO NOT HAVE 774E POTENTIAL TO GENERATE ADDIRONAL SEDIMENT: <br />5 STABILIZED SOILS: <br />PROVD2 W&ONRY AND 110MAW SOL STABSU770Y TO ALL WORDO SOW WMMY M PRWCT <br />SM FROM OCTOBER I UNM APRE 30, NO MFOSED S4,7L MAY RMM &POEND AN01 017MMO FOR MORE THAN TWO <br />DAYS, AFTER MAY I, NO MOSED SOH, MY AMM WOSED AND UMOMMFOR MORE Iffiff EMN DAYS. <br />.B Sa C120 'Y AM PAWAM9 ST100r, <br />CI21 MULCHING <br />C122 NETS AND BLANKETS <br />CI23 PL&lilyc CovEavel <br />C124 SODDING <br />C125 TOPSOILING <br />C126 POLYACRYLAMIDE FOR SOIL PRO7EC770N <br />C130 SURFACE ROUGHENING <br />C131 GRADIENT TERRACES <br />C140 DUrl CONTROL <br />6. PROTECT SLOPES. <br />CUT AND FILL SLOPES SHALL BE PROTECTED FROM EROSIVE AND CONCEN7RA7ED FLOWS UN77L PERMANENT COVER AND DRAINAGE <br />CONVEYANCE SYSTEU ARE IN PLACE, <br />BMP's: C120 7EMPORARY AND PERMANENT SEEDING <br />C121 MULCHING <br />C122 NETS AND BLANKETS <br />C123 PLASTIC COVERING <br />C124 SODDING <br />C130 SURFACE ROUGHENING <br />C131 GRADIENT TERRACES <br />C200 INTERCEPTOR DrXE AND SWALE <br />C201 GRASS -LINED CHANNELS <br />C203 WATER BARS <br />C204 PIPE SLOPE DRAINS <br />C205 SUBSURFACE DRAINS <br />C206 LEVEL SPREADER <br />C207 CHECK DAMS <br />C208 TRIANGULAR SILT DIKE (GEDTEXIXE-ENCASED CHECK DAM) <br />7. PROTECT PERMANENT DRAIN INLETS: <br />ALL PERMANENT STORM DRAIN INLETS WILL BE PROTECTED FROM SEDIMENT AND SILT -LADEN WATER. <br />Byp's. C220 STORM DRAIN INLET PROIEC77ON <br />8. STABILIZE CHANNELS AND OUTLETS: <br />TEMPORARY AND PERMANENT CONVEYANCE SYSTEMS SHALL BE STABILIZED TO PREVENT EROSION DURING AND AFTER CONSTRUC770N. <br />BM'P s: C122 NETS AND BLANKETS <br />C202 CHANNEL LINING <br />C207 CHECK DAMS <br />C209 OUPLET PR07EC77ON <br />SlT,E GPM DINGA ND S WPP NOTES <br />PERMANENT COVER BMP (HYDROSEEDING GE'EN L NOTES) <br />1. <br />EROSION AND SEDIMENTARON CONTROL SHALL COMPLY WJd74 THE MINIMUM REQUIREMENTS OF THE CITY <br />CONSTRUCTION ACCEPTANCE BILL BE SUBJECT TO FELL ESTABLISHED GROUND COVER THAT FULFILLS: <br />NONCOMPLIANCE W IH 774E EROSION C0N7ROL REQUIREMENTS WATER QUALITY REQUIREMENTS AND CLEARING <br />LIMITS WOI_AT7lONS MAY RESULT IN REVOCARaON OF PROJECT PERMITS PLAN APPROVAL AND BOND <br />1. THE REQUIREMENT OF 774E APPROVED CONS77?UC77ON PLANS AND 771E CITY <br />FORECLOSURES <br />2. ALL LAND DISTURBANCE AREAS SUCH AS DETENTION FACILITIES, ROADWAY BACK -SLOPES, ETC. SHALL <br />2 <br />774E STORMWATER POLLU770JV PREVEIV77ON (SWPP) BMP'S SHALL BE CONSTRUCTED PRIOR TO ANY LAND <br />BE SEEDED WI7H A PERENNIAL GROUND COVER GRASS TO MINIMIZE EROSION. GRASS SEEDING DILL BE <br />DISTURBANCE OR EXTENSIVE LAND CLEARING IN ACCORDANCE W17H THE APPROVED TARGETED PLAN. THESE <br />DONE USING AN APPROVED HYDROSEEDER OR AS OTHERWISE APPROVED BY THE CITY` <br />FACIL177ES MUST BE SATISFACTORILY MAINTAINED UNTIL CONS77RUC77ON AND LANDSCAPING IS COMPLETED <br />AND POTENTIAL FOR ON -SITE` EROSION HAS PASSED. SEDIMENT LADEN W47ERS SHALL NOT ENTER THE <br />J. PREPARATION OF SURFACE: ALL AREAS TO E SEEDED SHALL BE CUL77VATED TO THE SAIISFAC77ON <br />NATURAL DRAINAGE SYSTEM: <br />OF THE CITY INSPECTOR THIS MAY BE ACCOMPLISHED BY DISCING, RAKING HARROWING OR OTHER <br />ACCEPTABLE MEANS <br />3, <br />THE DEVELOPER/CESCL IS RESPONSIBLE FOR THE WATER QUALITY AS DETERMINED BY THE MONITORING <br />PROGRAM, ESTABLISHED BY THE ENGINEER. THE PROJECT ENGINEER°SjCESCL NAME AND PHONE NUMBER <br />4. IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETA77ON (CONSIS7TNG OF RAPID, PERSIS7ENT <br />ARE: MAC ENGINEERING, LLC. @ (425) 903-1399. <br />AND LEGUME) WILL BE APPLIED. (MIN/MUM E011 PER ACRE). THIS IS TO INCLUDE 774E FOLLOWING. ° 40% <br />4. <br />ALL SITE WORK MUST COMPLY TO CHAPTER 18 OF 711E INTE'P.NAPONAL BUILDING CODE AND CITY <br />PERENNIAL RYA 40% RED FESCUE: 107o WHITE DUTCH CLOVER, 10% COLONIAL BENTGRASS ,HYDROSEEJ <br />DEVELOPMENT CODE (LATEST EDITIONS). <br />REQUIRED, <br />5. <br />ALL LAND DIST IRBANCE FORK SHALL BE PERFORMED IN ACCORDANCE WITH CITY STANDARDS <br />5. FERTILIZER: SHALL BE APPLIED AT 400,E PER ACRE OF 10-20-20 (10 I6. PER 1,100 SQUARE FEET) OR <br />6. <br />IF CUT AND FILL SLOPES EXCEED A MAXIMUM OF TWO FEET HORIZONTAL TO ONE FOOT VER77CAL, A ROCK <br />EQUIVALENT <br />OR CONCRETE RETAINING FALL MAY BE REQUIRED. ALL ROCK RETAINING MALLS GREATER THAN FOUR (4) <br />FEET IN HEIGHT ARE TO FOLLOW CITY SPECIFICATIONS AND TO BE DESIGNED AND CER77FIED BY A CIVIL <br />9. CONTROL POLLUTANTS ° <br />ENGINEER EXPERIENCED IN SOILS MECHANICS ALL BALLS EXCEEDING 30" HIGH SHALL HAVE A 4' HIGH <br />POTENTIAL POLLUTANTS <br />ALL FOLLOTAM, INC6UDS9 =21MWICERMAIS, O -SITE' A=G TAM AM BAVOEMOff DEBRIS <br />CHAIN LINK FENCE ALONG TOP. <br />MU DD HANDLED AAW D OSM OF 1N A MANNO MT DOBS NOT CWAMNAM STORNWATIR. <br />STOCKPILES ARE TO BE LOCATED SUCH THAT SEDIMENT !MILL NOT LEAVE SITE: TEMPORARY COVER (BMP's) <br />ERE ARE THREE TYPES OF POTENTIAL POLLUTANTS THAT THIS SWPPP IS INTENDED TO ADDRESS:7. <br />GIST CONOM G <br />SHALL CONSIST OF HYDROSEEDING, MULCHING, OR COVERING DISTURBED AREAS AND STOCK PILES W1T74 <br />1. HAZARDOUS CHEMICALS <br />C152 SAWCUT7TNG AND SURFACE POLLUTION PREVEN-17ON <br />PLASTIC SHEETING. <br />2. PETROLEUM PRODUCTS <br />CI53 MATE= DEMMY, B70RAGL AND COWSINGM <br />&. <br />STRUCTURAL BACKFILL AND COMPACTION OF VAULT, ROCKERY, RETAINING WALL FOOTINGS AND WALLS, AND <br />J. SEDIMENT <br />CI54 FASUOUT AMA <br />ROADWAY TRENCH RESTORA770N SHALL BE MONITORED INSPECTED, AND COMPACTON TESTED BY A <br />C250 CONSTRUC77ON STORMWATER CHEMICAL TREATMENT <br />LICENSED GE07ECHNICAL ENGINEER. FIELD DENSITY TESTS SHALL INDICATE A MINIMUM COMPAC77ON OF 957. <br />REASONABLE CARE AND DISCRE77ON SHALL BE EXERCISED TO PREVENT DAMAGING THE ENVIRONMENT <br />C251 CONSIRUC77ON STORMWATER FIL7RA77ON <br />OF MAXIMUM DENSITY DETERMINED IN ACCORDANCE WITH ASTM D-1557 70 (MODIFIED PROCTOR). <br />THROUGH A RELEASE OF ANY OF THE THREE TYPES OF POLLU770N. THIS SNPPP /S TO BE CONSIDERED A <br />C252 TREATING AND DISPOSING OF HIGH PH WATER <br />COMPACTION TEST RESULTS TO BE SUBMITTED TO CITY Wi774 AS -BUILT DRAI>IIfNGS <br />GUIDE, AND REPRESENTS ONLY THE MINIMUM STANDARD OF CARE TO BE PRACTICED DURING 774E <br />CONSTRUC77ON PHASE OF THIS PROJECT. A CER77FIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) SHALL <br />1O CONTROL DEWATERING. <br />9. <br />F ALL H B H <br />THE SURFACE OF ALL SLOPES SHALL BE COMPACTED. THIS MAY BE ACCOMPLISHED BY OVER -BUILDING 774E <br />BE RESPONSIBLE FOR EVALUA77NC THE COND17701VS AND POLLUTON P07EN71AL ON 774E PROJECT SITE AT ALL <br />CLEAN, NON -TURBID DE -WATERING WATER CAN BE DISCHARGED TO SYSTEMS TRIBUTARY TO OR DIRECTLY INTO SURFACE WATERS OF <br />SLOPES, THEN G BACK FINAL GRADES, OR BY RUNNING THE COMPACTOR OVER ;TIE SLOPE <br />77MES AND DETERMINING WHAT ADDITIONAL MEASURES NEED TO BE ENACTED TO PROTECT 714E ENVIRONMENT. <br />THE STATE, PROVIDED THE DE -WATERING FLOW DOES NOT CAUSE EROSION OR FLOODING TO RECEIVING W47ERS HIGHLY TURBID OR <br />EACH FILL LIFT IS BEING PLACED. ALL SLOPES SHALL BE COMPACTED BY THE END OF EACH WORKING DAY. <br />7VS MY INCLUDE STOPPING CONSTRUCTON UN77L CONDITIONS CHANGE SUCH THAT THE DANGER TO 774E <br />CONTAMINATED DE -WATERING WATER SHALL BE HANDLED SEPARATELY FROM STORMWA TER. <br />10. <br />EARTH QUAN7777ES (CUTS & FILLS) SHOWN ON PLANS ARE ES71MATES ONLY AND ARE NOT ADJUSTED FOR <br />ENVIRONMENT HAS BEEN MINIMIZED. <br />EXPANSION OR COMPAC77ON. 774E CONTRACTOR IS RESPONSIBLE FOR VERIFICA71ON OF ACTUAL QUAN7177E5 <br />BMP'SC203 WATER BARS <br />AS REQUIRED. <br />C236 VEGETATIVE FILTRAT70N <br />11. <br />AREAS TO RECEIVE FILL SHALL BE PREPARED BY REMOVING UNSUITABLE MATERIAL SUCH AS CONCRETE <br />RDG SCHEMICALS <br />11. MAINTAIN BMPs: <br />SLABS 7REE STUMPS, BRUSH, AND TRASH <br />HAZARDOUS CHEMICALS, SUCH AS CLEANING AGENTS AND SOLVENTS, SHALL BE STORED IN AN APPROVED <br />IGG CAD IIPO S IOff NARTC,G OF CD 17 D � COMPLY <br />12 <br />FILL MATERIALS SHALL BE AS SPECIFIED IN GENERAL A107E 1., UNLESS SHOWN OTHERIMSE ON PLANS <br />CHEMICAL STORAGE FACILITY(IES), LOCATED IN THE EQUIPMENT STAGING AREA. WHEN USING CHEMICALS <br />OIYAL AT TM W OF PPOC� <br />DURING CONSIRUC77ON AC7716TY, CARE SHALL BE TAKEN TO GUARD AGAINST SPILLAGE. IN THE EVENT OF A <br />BMP'S° <br />13 <br />LAND DISTURBANCE FROM OCTOBER 1st TO MARCH 31st IS NOT PERMITTED WTHOUT SPECIFIC APPROVAL. <br />CHEMICAL RELEASE, THE APPROPRIATE AU7HOR177ES ARE TO BE N077FIED AND THE SPILL IS TO BE CLEANED <br />CI50 MATIRMS ON HOD <br />UP IMMEDIATELY. <br />C160 CER71FIED EROSION AND SEDIMENT CONTROL LEAD <br />14. <br />STABILIZING EXPOSED SOIL. THE CONTRACTOR SHALL STABILIZE DENUDED AREAS AND SOIL STOCK PILES AS <br />FOLLOWS: <br />12. MANAGE 7HE PROJECT <br />PP AGM IN A COORM2M EffORT BY M PROW7 NNAGER, CONMCTOR, NGWRE, AND <br />IF PERMIT70, FROM OCTOBER 1 TO APRIL 30, NO SOIL MAY REMAIN EXPOSED FOR MORE THAN 2 DAYS <br />PETROLEUM PRODUCTS <br />P, CTO� SWPPP'� DD .MOD A GE AT CONSTRUCTION I T <br />6. <br />FROM MAY 1 TO SEPTEMBER 30, NO SOIL MAY REMAIN EXPOSED FOR MORE THAN 7 DAYS <br />SOIL STOCKPILES SHALL E STABILIZED OR PROTECTED WITH SEDIMENT RETEN774N BMPs WITHIN 24 HOURS <br />OR C® .BAPS A SIG ON .OLD P OF POLLUTANTS TO WA OF S'TAT9 D G <br />c. <br />OF FORMAT70N. <br />7HE CONSTRUCTION S17E IS TO BE PROTECTED AGAINST EXCESSIVE PETROLEUM POLLUTION. ALL CONSTRUCTON <br />CON UCI7ON PROCESS, �T C O� DTCO�N, COl ON A � <br />EQUIPMENT AND VEHICLES SHALL HAVE A REGULAR MAINTENANCE SCHEDULE AS RECOMMENDED BY 7"riE PRODUCT <br />(OT b'WPPP CS) SHM BN HALMD AND TO CETY LVERECTOR AND TM PRORCT ENGMEM AM TO DS <br />15, <br />ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER <br />MANUFACTURER WITH PAR77CULAR AT7EN770NICAE BEING PAID TO LOCA17ONS THAT ARE COMMONLY KNOWN TO <br />CONTACTRU AM RMEW OF TO ATLON. <br />FINAL FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. <br />LEAK LUBRICANTS UPON DISCOVERY OF AN UNSA775FACTORY PART, THAT WHICLEjEQUIPMENT SHALL NOT BE <br />TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESUL77NG FROM <br />OPERATED UN71L IT HAS BEEN FIXED. A00/710NALLY, ALL OIL AND REFUELING OPERATIONS ARE TO BE CONDUC7ED IN <br />BMP'S° C150 MAMwo ON HM <br />REMOVAL SHALL BE PERMANENTLY STABILIZED. <br />A DESIGNATED AREA THAT HAS BEEN PREPARED TO PREVENT THE LOSS OF SPILLED OILjFUEL TO THE ENVIRONMENT <br />C160 CER71FIED EROSION AND SEDIMENT CONTROL LEAD <br />7HROUGH THE USE OF A LINER; SPILL TRAP OR OTHER MEANS <br />CI62 SCMULNG <br />WET WEATHER GRADING NOTES <br />13 PR07ECT ON -SITE BMPS° <br />ON-SM S"EffAM AffiVACEMUD 'S USED POD RUNUff ROM POOH AM OTM MM SUNACES INCLUE YVLL <br />1. <br />THE CONS7RUC770N SEQUENCE SHALL BE MODIFIED TO MINIMIZE THE AREA OF SOIL EXPOSED. <br />®� � �. <br />SEDIMENT <br />D ON, ROOF DOWNSPOUT 77ON ORDEP Obi S S, P ORA OUT C0 GT 0flS, BAN <br />GAMZVS, B10NI7ON SISMS, PARAMBW PAS , SHM FLOW DEPARON, AN COlVCfffM= 1101T DISPEEMON. <br />'S <br />2. <br />EARTHEN AREAS THAT ARE SUBJECT TO C'ON7RIBUTTNG SEDIMENTS DURING STORM EVENTS AND WHERE EARTH <br />MOVEMENT IS NOT ANTICIPATED FOR 48-HOURS SHALL BE STABILIZED USING THE FOLLOWING BLIPS° <br />THE RELEASE OF SEDIMENT TO 774E ENVIRONMENT SHALL BE PREVENTED AT ALL 77MES IHE FOLLOWING BLIPS ARE <br />ON TBE RM TO BE USED POD THISE B SHALL DN PROTECTED FROM SMfAffON AND CO ACTION DUMG <br />HYDROSEEDING & MULCHING (4" 774ICK STRAMI) OR COVERING DISTURBED AREAS AND STOCK PILES WITH PLASIIC <br />TO BE CONSIDERED THE MINIMUM PR07ECIION MEASURES.° <br />COMMUMON .BY SRqVfflMWG M CONSMUCTIONIV A FAMON TO EMALL TOSE BAPS AT M LATTIR PART OP IIN <br />SHEEIINO <br />CONSTRUCEON GRADRYG OPERATIONS, DT &CLOHO lineuj?MET FROM TO D 'S° OffA d � <br />°S <br />Ci70N ECONSIENT,IVEN SHALL <br />1. THE DISTRINIED fTRACCONKING OF MUD/SEDIMENT ONTO ROADS FROM CVIA <br />MSG 57ON S ATdON CONTROL B B AD.O ONAL .13E S FOR PROTECMG <br />3. <br />WET WEA771ER 7ESC MEASURES KILL BE EXPANDED TO INCLUDE CONSTRUCTON AREA STAB/LIZA77ON, <br />ENTRANCE, <br />A EN <br />BE PREVENTED. THE CONSTRUCTION SITE SHALL BE ACCESSED VIA A ROCK <br />R 'S D G CON 'd O ON PROCESS, G ON bU.FSSTR G CT10iU , <br />(EXTEND COAISTRUC77ON ENTRANCE), SEDIMENT 7RAPS, AND ADDITIONAL SILT FENCES, IF NECESSARY. WINTER <br />TENSTRUF N T <br />UNDERLAIN BY A GOO -TEXTILE FABRIC. THE ENTRANCE SHALE BE EXTENDED IF NECESSARY 0 <br />G CTON AT AL STAGS OF CON UCffON PIROC MC'L IO <br />COND177ONS TEMPORARY EROSION & SEDIMENT CONTROL BMP'S° FROM OCTOBER 1 TO APRIL 30. NO SOIL MAY <br />PROVIDE ACCESS TO THE EMPLOYEE PARKING AND EQUIPMENT STAGING AREAS PRIOR TO LEAVING THE <br />NG AN EQUIPMENT <br />SP C B9MONS M IY.AL F OF AL <br />REMAIN EXPOSED FOR MORE THAN 2 DAYS, OTHERWISE NO SOIL MAY REMAIN EXPOSED FOR MORE THAN 7 DAYS <br />COVER PRACTCES° THE EXIS7ING E-GETARON SHOULD BE LEFT UNDISTURBED WHERE POSSIBLE TO LIMIT <br />CONSTRUCTION SITE, CONSTRUCTION EQUIPMENTjVEHICLES S14ALL BE INSPECTED FOR MUDjSEDIMENT AND ALL <br />BMP's C102° BUFFER ZONE <br />EROSION, DISTURBED AREAS SHALL BE COVERED WTH MULCH, SOD, PLASTIC OR MATTING STOCKPILES OR <br />WHEELS ARID SURFACES ARE TO BE BRUSHEDICLEANEDjWASHED AS NECESSARY PRIOR TO LEAVNG THE <br />C103: HIGH WS131UTY FENCE <br />SLOPES DEEPER THAN 2:1 SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT RETENTION B14PS WITHIN 24 <br />CONSTRUCTION SITE ADD1770NALLY THE EXIS77NG PAVEMENT OF ROAD SYSTEMS ADJACENT TO THE PROJECT <br />C200: INTERCEPTOR DIKE AND SWALE <br />HOURS OF FORMA7701. STRUCTURAL PRACTCES: SILT FENCES AROUND 771E PERIMETER WILL PREVENT SEDIMENT <br />SITE WILL BE SWEPT DAILY WHEN SEDIMENT IS TRACKED OFF SITE. <br />C201: GRASS LINED CHANNELS <br />LADEN WHERE ACTIVE GRADING IS IN PROGRESS, THE DIRECTOR MAY EXTEND 7HE DEADLINE FOR SOIL <br />C207.- CHECK DAMS <br />STABILIZATON UPON DETERMINING THAT THE LIKELIHOOD OF EROSION IMPACTS IS LOW BASED ON THE TYPE AND <br />2. COVER MATERIALS (I.E. STRAW, MULCH OR PLASTIC SHEETING SHALL BE STORED ON SITE IN SUFFICIENT <br />C206: TRIANGLAR SILT DIKE (TSD) (GE07EXRLE-ENCASED CHECK DAM) <br />AMOUNT OF SOIL EXPOSED, SITE TOPOGRAPHY 774E P07EN77AL FOR DISCHARGE TO CRI77CAL AREAS AND LAKES <br />AND OTHER FACTORS DISTURBED AREAS SHALL BE COVERED WITH MULCH, SOD, PLASTIC OR MATTING. GRADING <br />QUAN77RES SUCH THAT ALL PORTIONS OF EXPOSED EARTH CAN BE COMPLETELY COVERED TO PREVENT EROSION. <br />C231: BRUSH BARRIER <br />CONSTRU0770N SHALL BE TIMED AND CONDUCTED IN STAGES TO MINIMIZE 501E EXPOSURE. <br />RUNOFF FROM, THE AREA THAT IS PROPOSED TO BE DISTURBED SHALL BE INTERCEPTED BY INTERCEPTOR <br />CHANNELS, AND CONVEYED TO A TEMPORARY SEDIMENTA77ON POND. DISCHARGE FROM THE TEMPORARY POND <br />CT OS <br />C23: <br />34: VEGETATED STRIP <br />4. <br />SOILS SHALL NOT BE DISTURBED EXCEPT FOR ACTUAL CONSTRUCTION ACTlVITTES PARKING 1S ALLOWED ONLY ON <br />WILL BE 7HROUGH A GRAVEL F1L7ER CONE TO THE EXIS77NG STORM SYSTEM. <br />PAVED ANDjOR GRAVEL SURFACES <br />3 7HE PLANNED CONSTRUC7ION AC77W77ES SHALL E EV4LUA7ED ON A DAILY BASIS TAKING INTO CONSIDERATION <br />COE EROSION AND SEDIMENTATION CONTROL NOTES_ <br />5. <br />SLOPES &Z AND GREATER WITHOUT ESTABLISHED GROUNDCOVER WILL E STABILIZED 97H PLASTIC SHEETING, <br />774E LATEST WEA7HER FORECAST. THE WEATHER FORECAST SHALL DICTATE WHETHER LARGE-SCALE FAR771 <br />6-MIL (MINIMUM). THE SHEE77NG SHALL BE ANCHORED NPH SAND BAGS LOCATED 5-FEET APART ON THE <br />MOVING OPERA77ONS SHALL COMMENCE OR CON77NUE IF PRECIPITATION OCCURS DURING CONSTRUC714N AC77WTY, <br />PERIME7ER AND 10-FEET ON CENTER ON THE REMAINDER OF 174E SHEEING. A MINIMUM OF 2-FEET OVERLAP IS <br />AND IS INTENSE ENOUGH TO GENERATE RUNOFF ALL EARTH MOVING AC77077ES SHALL CEASE AND EXPOSED <br />1. APPROVAL OF 7T41S EROSIONjSEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONS71TU7E AN APPROVAL OF <br />REQUIRED FOR OVERLAPPING SHEETS <br />EARTH SHALL BE COVERED TO PREVENT EROSION. WHILE PRECIPITATION PERSISTS THE ONLY CONSTTRUC7701V <br />PERMANENT ROAD OR DRAINAGE DESIGN (EG. SIZE AND LOCA77ON OF ROADS PIPES, RESTRICTORS CHANNELS <br />AC71WTY THAT SHALL BE ALLOWED' ARE THOSE AC711177ES REQUIRED TO MAINTAIN EXIS77NG EROSION CONTROL <br />RETEN770AI FACILITIES U77LITTES). <br />6. <br />WATER DISCHARGED FROM THE SITE WILL BE MONITORED FOR 3URBIDITY THE MAXIMUM ALLOWABLE <br />MEASURES INSTALL NEW EROSION CONTROL BMP'S AS NECESSARY AND NON-ERQSIOIVjSEDIMENT GENERA1IfUG <br />TURBID(];° OF DISCHARGED WATER WILL BE 5 NTU OVER BACKGROUND. <br />AC77W77ES <br />2 THE 1MPLEVENTA77ON OF THESE ESC PLANS AND 774E CONSTRUC770A6 MAINTENANCE, REPLACEMENT, AND <br />UPGRADING OF 774ESE ESC FACILITIES IS THE RESPONSIBILITY OF 774E APPLICANTjCONTRACTOR UIV77L ALL <br />7: <br />WHEN RAINFALL IS HEAVY (DEFINED AS RAINFALL HARD ENOUGH TO PRODUCE SEDIMENT RUN-OFF FROM <br />CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETA770NILANDSCAPING IS ESTABLISHED. <br />EXPOSED DIRT), ALL EXPOSED EARTHWORK SHALL BE COVERED. NO OTHER CONSTRUCTION ACTIVITY SHALL <br />4. CONS7RUC71ON ACTMTES SHALL BE PHASED TO MINIMIZE THE SURFACE AREA OF EXPOSED EARTH AT ANY <br />OCCUR ON PERVIOUS SURFACES DURING THESE PERIODS OF HEAVY RAIN <br />GIVEN TIME 774E CLEARINGjGRADING LIMITS ARE IDENTIFIED ON 771E PLAN SHEET. <br />J. THE BOUNDARIES OF 774E CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN 771E FIELD <br />PRIOR TO CONSTRUCTION DURING 774E CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED <br />&. <br />ALL DRAINAGE SWALES SHALL BE FULLY VEGETATED. SWALES SHALL BE SODDED IF THE VEGETARON GROWING IN <br />5. SPECIFY SUP FOR CLEANING PAVEMENT SURFACES AT THE END OF EACH WORKING DAY <br />CLEARING LIMITS SHALL BE PERMITTED. 7HE FLAGGING SHALL BE MAINTAINED BY THE APPLICANTjCON7RACTOR <br />774E SWALE' IS INSUFFICIENT TO PROVIDE IVA7ER QUALITY AND TO PREVENT EROSION OF 774E SWALE, <br />FOR THE DURA770N OF CONSTRUCTION. <br />9. <br />FIL7ER FABRIC (CE07EX77LE FABRIC) SHALL BE INSTALLED BENEATH THE EN77RE CONSTRUC7ION ENTRANCE <br />4. 774E ESC FACIL177ES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION 141TH ALL CLEARING AND <br />GRADING AC77167TES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO <br />10. <br />IF 771ERE IS A MEASURABLE INCREASE IN THE TURB°D!n° OF THE RECEIVING WATER GREATER THAN 5 NTUS 77-IE <br />NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR WOLA7E APPLICABLE WATER QUALITY STANDARDS <br />WATER IN THE TEMPORARY SEDIMENTA770M POND SHALL BE PUMPED TO UIVDIS77JRBED VEGETA77ON ON SITE. <br />S THE ESC FACILITIES SHOWN Ohl THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED S17E <br />CONDITIONS DURING 771E CONSTRUCTION PERIOD, THESE ESC FACIL177ES SHALL BE UPGRADED AS NEEDED FOR <br />BMP DOTES. <br />UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WA7ER DO NOT LEAVE <br />771E SITE <br />1. COVER PRACTICES.° <br />6. THE ESC FACIL171ES SHALL BE INSPECTED ROU77NELY AND MAINTAINED BY THE APPLICANTjCONTRACTOR TO <br />77.7E EXIS77NC VEGETA77ON SHOULD BE LEFT UNDISTURBED WHERE POSSIBLE TO LIMIT EROSION. DISTURBED <br />ENSURE 774EIR CON71NUED FUNC770NING, ESPECIALLY AFTER STORM EVENTS <br />AREAS SHALL BE COVERED WITH MULCH ANDIOR MATTING STOCKPILES OR SLOPES STEEPER THAN 2:1 <br />SHALL BE COVERED WI7H PLAS77C SHEETING HELD IN PLACE Po#Pd SAND BAGS <br />7° THE ESC FACILITIES ON INA077VE S17ES SHALL BE INSPEC7ED AND MAINTAINED A MINIMUM OF ONCE A <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />&. AT NO 77ME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED <br />CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING THE <br />CLEANING OPERA77ON SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUC77ON ENNSTALLED AT THE BEGINNING OF CONSTRUC77ON AND <br />SHALL BEES IADD177ONAL <br />MAINTAINED FOR 7HE DURA770AIOFC7HE PROJECT MEASURES MAY BE REQUIRED TO ENSURE 77YAT <br />O E T aT <br />ALL PAVED AREAS ARE KEPT CLEAN FOR 774E DURA77ON OF THE PROJECT <br />REVIEWED �� O f l., <br />10 THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF <br />THE SITE. <br />11. MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM EN7ERING SURFACE WATER BODIES IF THE <br />PROPOSED BMPS <br />E I E®A D APPROVED <br />12, BARE ANDjOR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 <br />DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />ON 77*S DAY OF 2020 <br />SEPTEMBER 30. <br />BYe <br />C17Y OF EVERETT ENGINEER <br />D. <br />Z.f WASH, <br />e <br />DATE REVISION/ISSUED <br />03119121 ISSUED <br />CALL 48 HOURSTHE CON7RRACTOR SHALL VERIFY THE LOCATION OF ALL <br />BEFORE YOU U77LI77ES PRIOR TO ANY CONS7RUC770NL AGENCIES INVOLVED <br />: SHALL BE N077FIED WITHIN A REASONABLE TIME PRIOR TO <br />THE START OF CONSTRUC770N. <br />9;'•s „ G�*,s?'.vizr ,axs e h � �` _ .,. aa:.. � .v`li�%a ..7`., <br />a <br />