Laserfiche WebLink
(2)2x STUDS 0 HOLDOWN 4,,—PYL. EDGE NAILING <br />TO EACH STUDS 0 <br />HOLDOWN <br />CPLY. <br />2x4" P.T. MUDSILL wl ANCHOR BOLTS SILOLNT. PLATE TO <br />PER PLAN 12" MIN, AT <br />MUDSILL ENDS AND JOINTS, WITH 7" 35d @ 4" O,C. <br />MIN. EMBEDMENT. (U.N.O.) 8d @ 5" O.C. <br />SEE SCHEDULE <br />EDGE NAILING <br />PER SCHEDULE <br />FLOOR JOISTS (PER PLAN) <br />GE <br />SIMPSON STHD14RJ w/ EDNAIL <br />38-16d SINKERS <br />TO DBL. STUDS FINISH <br />(STRAP LOCATION GRADE <br />PER PLAN) <br />#4 BARS TOP <br />CONTINUOUS <br />x <br />< <br />0 16" O.C. VERT. <br />< _j <br />VCENTERLINE OF WALL_ Cc <br />< <br />STANDARD HOOK Z< <br />#4 @ 10" O.C. HORZ., <br />m <br />5 MIL. 'BLACK' VISQUEEN <br />VAPOR BARRIER. co <br />UNYIELDING SOIL <br />C <br />(2)#4 CONT. <br />- - -------- <br />EXTEFZ[OR 5HEARWALL <br />e CRAWL &FAGE <br />3/499=1 P—Opp <br />DOUBLE PORTAL <br />FRAME <br />. . . . . . ®3 1/2%11 1/4" MIN. HDR. <br />i- <br />® —UP, SOLID SAWN, <br />,I ® . . . . . (BUILT <br />LGL, ETC.) <br />---FASTEN T.PL. TO HDR, W 2 ROWS OF <br />16D SINKERS 03" ox� (%P.) <br />aline 9 <br />2400 LB HDR. STRAP OPPOSITE SHEATHING <br />AS SHOWN (SEE SECTION A —A) (TYP.) <br />(MSTA24) <br />FASTEN SHEATHING TO HDR. W/ 8D COMMON <br />NAILS IN 3" GRID PATTERN AS SHOWN AND 3" <br />IN ALL FRMNG. (STUDS & SILLS) TYP. <br />FOR FRAMES OVER 8", PANEL SPLICE (IF NEEDED) <br />SHALL OCCUR WITHIN 24" OF MID —HEIGHT. BLOCKING <br />IS REQUIRED, IF 2X_ BLOCKING IS USED THEN IT <br />MUST BE STITCH NAILED W/ 1 ROW OF 16D SINKERS <br />3" oc. <br />V) <br />V) Z A35 CLIP 0 16' <br />O.C. TRUSS TO <br />I— n DBL. PLATE <br />4200 LB HOLD DOWN STRAP APPLIED <br />1 mein OVER SHEATHING INSTALLED IN CONCRETE <br />PER MANUFACTUREERS INSTRUCTION <br />(STHD14) <br />VdI B518" DIA. ANCHOR BOLT WZ 7" MIN. <br />EDIVIENT @8" o.c.& 3%3"x1/4" PLT. WASHER <br />1 <br />L_ •L_4 <br />Y <br />CONIT. FTG. w/ (2) 414 CONT. <br />Q 50TTOM (TrP) <br />FRONT ELEVATION <br />TYPICAL ,-- <br />POST <br />FRAME <br />CONSTRUCIITON <br />+—PYL. EDGE NAILING <br />TO EACH STUDS 0 <br />HOLDOWN <br />CONT. PLY. TO <br />SILL PLATE <br />SIMPSON STHD14 w/ <br />38-2 1/2x. '148 NAILS <br />TO DBL. STUDS <br />(STRAP LOCATION <br />PIER PL,�N) <br />8d @ 6" O.C. <br />EDGE NAILING <br />PER SCHEDULE <br />FINISH co <br />GRADE <br />#4 BARS <br />CONTINUOUSTOP x <br />0 16" O.C. VERT. . I Z < _j <br />— o_j <br />ICENTERLINE OF WALL i u- <br />STANDARD HOOK < - <br />#4 @ 10- O.C. HORS. - Z< <br />Z) m <br />6 MIL. 'BLACK' VISQUEEN <br />VAPOR BARRIER. s a <br />co <br />UNYIELDING SOIL <br />PPIP <br />(2)#4 CONT. <br />S <br />EXTERiCR eHEAIALL <br />6 CfRAWL 6FACE <br />31499= 1 2- 099 2x SILL PLATE W/ <br />ANCHOR BOLTS OR <br />EXPANSION BOLTS PER <br />SCHEDULE <br />(2) 414 CONT. (TYP) <br />EXPANSION <br />SHEATHING FILLER JOINT/ THERMAL <br />IF NEEDED BREAK <br />77. <br />ml . . . . . . 4/�2400 LB <br />A HDR. <br />STRP <br />(MSTAA24) <br />14. VERT. <br />#4 @ 16" O.C. <br />16D #4 0 10" O.C. HORZ. <br />SINKERS <br />2 ROWS @ A -1. 1 <br />(2)2x STUDS 0 HOLDOWN <br />2x P.T. MUDSILL wl ANCHOR BOLTS <br />PER PLAN 12" MIN, AT <br />MUDSILL ENDS AND JOINTS, WITH 7" <br />MIN. EMBEDMENT. (U.N.O.) <br />SEE SCHEDULE <br />(2) LA'T'ERS 1501 FELT 0 STEM <br />WALL TO 1DEPT14 OF JOIST <br />FLOOR JOISTS (PER PLAN) <br />TOP FI-ANG <br />HANGER <br />.1.1 1ma® <br />j;— T 7 Jv�v8 (vim <br />7/16' MIN — <br />THICKNESS <br />2x FRAMING WOOD <br />STRUCTURAL <br />PANEL <br />'J. <br />TRUSS PER PLAN <br />A -A SECTION A -A <br />611DE ELEVATION <br />MIN, LATERAL FANEL F EAVE e <br />3/4yy 1 Y-0 <br />8d 0 6" O.C., TYP. <br />PLY. w/ EDGE NAILING <br />TRUSS DRAG � <br />STRUT PER Li <br />a - <br />PLAN DESIGN U) <br />FOR 300#/FT z ,,:,c <br />LATERAL LOAD cK -j <br />�— a- <br />2x BLK'G. 0 <br />24"o.c. w/ A35EDGE NAIL EA. END <br />PLY. PER <br />SCHEDULE <br />LDRAG 5TFUT TRU56 <br />I _� /4" == 1 -n- <br />ONE STUD <br />0 EACH <br />SPLICE (TY <br />N <br />SPLICE AND NAIL TOP PLATES AS SHOWN @ ALL <br />'EXTERIOR WALLS, SHEAR WALLS, & AT EACH FLOOR <br />LEVEL AND AT ROOF, <br />ELEZA—T—lai <br />4 TO <br />J 3/411=11-0H <br />m <br />P PLATE <br />PLYWOOD PER <br />SCHEDULE <br />BOTTOM PLATE NAILING <br />PER SCHEDULE <br />EDGE NAILING <br />PLY. SPLICE <br />CONT. RIM <br />EDGE NAILING <br />PLY. PER SCHEDULE <br />J01-,awT f=EfRf=EN!:)lCULAfR TO EXTERIOR W <br />FLOOR JOIST <br />PLY. EDGE NAILING <br />0 HOLDOWN STUD <br />(2)2x STUDS <br />STHD14 w/ 38-16d <br />SINKERS NAILS <br />STRAP LOCATION <br />PER PLAN <br />EDGE NAILING <br />FINISH <br />GRADE 00 <br />SIMPSON Hl EA. END/ EA. TRUSS <br />PLY. EDGE NAILING <br />2x BLOCK w/ 1 1/2" <br />VENT HOLES AS <br />REQUIRED wl (2)12d T.N. <br />EA. TRUSS/ EA, END <br />EDGE NAILING <br />2x STUD @ 16" O.C. <br />PLY. PER SCHEDULE <br />OF (TRU65) <br />EDGE NAILING <br />PLY. SPLICE <br />EDGE NAILING <br />CONT. RIM <br />EDGE NAILING <br />EXTERIOR WALL <br />mll <br />z <br />z <br />31/s" T43G PLTWD. 8U5FLOOR ON <br />FLOOR J016T5, GLUE AND NAIL w/ <br />FUNG5HANG NAILS \ <br />IX4 CLEAT <br />w/ (4) I6e <br />TO POT <br />P.T. POST PER <br />FNI;�. FLAN <br />MA5I5 5TRAIF <br />OR A35,OLIlP <br />& MIL. SLACK " <br />VAPOR 5ARRIIER <br />FOOTING DETAIL <br />2X 5LOOKING <br />R-Bo Nl6ul_-, <br />SEAM PER <br />PLAN <br />1400 FELT <br />FOOTN3 PER PLAN <br />SHEARWALL SCHEDULE <br />INDICATES SHEARWALL wl PLYWOOD ONE SIDE, <br />1, SHEATHING, 1/2' PLYWOOD OR 7/16' &S,&, ONE SIDE, BLOCKED, NAIL W/ 8ol <br />2 40 O,C. ALL EDGES AND 12' OZ, FIELD, <br />2. BOLT SILL PLATE TO CONCRETE w/ 5/6 DIA, x 10' A3a'S 2 32' OZ, <br />3, NAIL BOTTOM PLATE TO FRAMING BELOW w/ 16d @ 4' OZ <br />4, FASTEN DOUBLE PLATE TO JOIST OR BLOCKING ABOVE PER DTLS, ON Sl & S2 <br />AND DETAILS ON Sl & S2, <br />SHEARWALL SCHEDULE <br />INDICATES SHEARWALL vf/ PLYWOOD ONE SIDE, <br />1, SHEATHING1 1/2' PLYWOOD OR 7/16' O,S,B„ ONE SIDE, BLOCKED, NAIL w/ 8d <br />23 3" OoCa ALL EDGES AND 12" 0,C, FIELD, <br />2, ao BOLT (3)2x SILL PLATE TO CONCRETE w/ 5/8" DIA. x 12" A,R'S @ 16" OZ D/Sl <br />h OR BOLT (2)x SILL PLATE TO CONCRETE w/ 5/8' DIA, x 10' 2 24" OZ <br />3, NAIL BOTTOM PLATE TO FRAMING BELOW w/ 16d @ 4" O,Co <br />4o FASTEN DOUBLE PLATE TO JOIST OR BLOCKING ABOVE PER DTLS, ON Sl & S2o <br />5, USE (2)2x STUDS @ 16' OZ OR DETAIL D/ S1. & (2)2x STUDS @ ABUTTING <br />PANEL JOINTS, <br />SHEARWALL SCHEDULE <br />- == INDICATES SHEARWALL w/ PLYWOOD ONE SIDE, <br />L SHEATHINGi 1/2" PLYWOOD OR 7/16" Oo&B., ONE SIDE, BLOCKED, NAIL w/ Sol <br />@ 2" O.C. ALL EDGES AND 12" 0,C, FIELD, <br />20 BOLT 3x SILL PLATE TO CONCRETE w/ 5/6' DIA, x 10' k&'S @ 12' OZ <br />3, NAIL BOTTOM PLATE TO FRAMING BELOW vi/ 16o1 9 3' O,C, <br />4, FASTEN DOUBLE TOP PLATE TO JOIST OR BLOCKING ABOVE w/ SIMPSON LTP4 <br />e 10" 0,C, PER DTLS, ON Sl & S2. <br />5, USE 3x OR DBL STUDS ALL FRMNG MEMBERS RECIEVING E,N, FROM ABUTTING PANELS, <br />SHEARWALL SCHEDULE <br />- ==--- INDICATES SHEARWALL w/ PLYWOOD TWO SIDES, <br />1, THEAT7FIN�_l 1/2" PLYWOOD OR 0,S,B., TWO SIDES, BLOCKED, NAIL <br />wl 8d @ 3" 0,C, ALL EDGES AND @ 12' 0,C, FIELD, <br />2a BOLT 3x SILL PLATE TO CONCRETE w/ 5/8' DIAxIO, ANCHOR BOLTS @ 16' ECa <br />3, FASTEN DBLo BOTTOM PLTS, TO DOUBLE JOIST OR BLOCKING BELOW w/ 2 ROWS <br />2 LAYERS 16d 2 4" OZ OR 2 ROWS A35 CLIPS @ 16" OZ <br />4o FASTEN DBL, TOP PLTS, TO DOUBLE JOIST OR BLOCKING ABOVE w/ 2 ROWS <br />2 LAYERS 16d e TOE NAILS 4" OZ & 2 ROWS A35 CLIPS 2 16" 0,C OR PER DTLS <br />ON SHEET Sl & S2 <br />5, USE 3x OR DBL STUDS ALL FRM'NG MEMBERS RECIEVING E,N, FROM ABUTTING PANELS, <br />SHEARWALL SCHEDULE <br />INDICATES SHEARWALL vil PLYWOOD TWO SIDES, (DO NOT USE 7/16' 0,S,B) <br />THEAT_HING7: 1/2' PLYWOOD, TWO SIDES, BLOCKED, NAIL <br />w/ 10d x 2 1/2" LONG @ 2' O,C, ALL EDGES AND 2 6` OZ FIELD, <br />20 BOLT 3x SILL PLATE TO CONCRETE w/ 5/8' DIAx12', ANCHOR BOLTS 6' 0,C, <br />3, FASTEN DBL, TOP PLTS, TO BEAM ABOVE PER DETAIL Z2/S2 <br />4, USE 3x OR (2) 2x STUD w/ (2) ROWS 16d @ 3' OZ <br />ALL FRMNG MEMBERS RECIEVING E,N, FRO ABUTTING PANELS, <br />TYPICAL ROOF SHEATHING <br />7/16' 0,S,B, PLYWOOD, INDEX 40/20, UNBLOCKED, w/ FACE GRAIN <br />PERPENDICULAT TO FRAMING BELOW, NAIL AS FOLLOW& <br />DIAPHRAM BOUNDARY, OVER EXTERIOR WALLS, <br />SHEAR AS, & DRAG STRUTS, 8d @ 6" 0Z <br />ALL SUPPORTED EDGES <br />FIELD 6d @ 61, O.C, <br />TYPICAL FLOOR SHEATHING 8d 2 12" OZ <br />3/4® T&G, 0,S,3,, INDEX 40/20, UNBLOCKED, LAID UP <br />W/ FACE GRAIN PERPENDICULAR TO FRAMING BELOW, STAGGER <br />END JOINTS, GLUE & NAIL AS FOLLOWS: <br />DIAPHRAGM BOUNDARY AND OVER 66 AT 6' OC <br />EXTERIOR WALLS, SHEARWALLS <br />& DRAG STRUTS, <br />ALL SUPPORTED EDGES Sd AT 6' OC <br />FIELD ScI AT 10� OC <br />NOTESI <br />1, USE3'x3"xl/4' PLATE WASHERS ON ALL ANCHOR BOLTS, <br />2, EDGE OF PLATE WASHERS MUST BE LOCATED WITHIN 1/2' OF THE <br />INSIDE FACE OF THE STRUCTURAL SHEATHING, <br />3, ALL POWDER DRIVEN NAILS SHALL BE 2 3/4' LONG (MIN,)x 156 <br />SHANK DIA, wl MINIMUM 1 1/4' PENETRATION, <br />4. a, I6dl MAIL$ SHALL 5E Jro" LO. <br />b. 5d NAILS �ALL 5E .113x2 31 <br />1/21/2" LONG U117"Ii" <br />c. 206 NAILS SHALL 5E J'32x4" LONGRE-VIEWED FOR PERMIT <br />5USE 20d NAILS c 3x FRAMING MEM5ERS <br />CN, <br />< <br />CC, <br />0.110 <br />Lu <br />Lj u- Lo m <br />M <br />CN <br />< <br />ko <br />uj M <br />'LIU <br />fS) <br />lud <br />c� <br />Ld <br />F- <br />X <br />4', IAfli <br />I P'l <br />kpo 20 <br />U— <br />Lij Lu <br />DL Il <br />FILE NUMBER <br />DRAWN BY <br />R5E <br />REV. <br />Sheet <br />