My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 9/6/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 9/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 12:38:03 PM
Creation date
10/13/2022 11:45:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
9/6/2022
Council Approval Date
8/31/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Structural On-Call Support
Tracking Number
0003494
Total Compensation
$190,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
David Evans Associates 5/28/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC/ David Evans and Associates 4/22/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FICKEl1 <br /> Structural Solutions <br /> May 31, 2022 <br /> Mr. Kash Nikzad, P.E. <br /> TranTech Engineering <br /> 365 118th Ave, Suite 100 Bellevue, <br /> WA 98005 <br /> Re: City of Everett Grand Ave Pedestrian Truss Inspection. <br /> Dear Kash, <br /> Fickett Structural Solutions (Fickett) is pleased to provide you with this proposal for bridge inspection services. You <br /> have indicated you would like us to perform Routine, Fracture Critical and Inventory Inspections of the City's Grand <br /> Avenue pedestrian truss bridge located in Everett, WA. We propose the following to accomplish this work: <br /> • Review existing plans. <br /> • Create a bridge inspection record in WSDOT's bridge inspection database. <br /> • Develop an access plan for access to all structural members, including but not limited to those over Grand <br /> Avenue and the adjacent rail lines. <br /> • Procure private traffic control for Grand Avenue and the adjacent rail lines. <br /> • Perform a Routine, Fracture Critical, and Inventory Inspection of the bridge per current WSDOT Bridge <br /> Inspection Standards. <br /> • Update all Inventory inspection data, routine and fracture critical inspections findings, including, work <br /> recommendations and photographs into the WSDOT bridge inspection database. <br /> • Provide you with signed copies of the Routine and Fracture Critical Inspection reports. <br /> All inspection related work will be conducted under the direct supervision a Professional Engineer, registered in the <br /> State of Washington and with current WSDOT Certified Bridge Inspection Team Leader status. <br /> A combination of a lifts and rope access may be utilized for access to bridge members. <br /> Proposed traffic and rail control plans will be submitted to the City of Everett for approval prior to start of field work. <br /> It is the City's option to provide traffic control using City personnel if they so desire. <br /> The bridge owner shall provide permission and access to the bridge site. <br /> We propose to complete this work at up to a maximum fee of $21,863. Fickett Structural Solutions will provide <br /> additional bridge services on an on-call basis. Modifications or additions may require a modification to the proposed <br /> maximum fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.