Laserfiche WebLink
� ' TR,ANTECH <br /> Prime Consultant Cost Computations <br /> City of Everett-2022 Load Rating Updates <br /> Project QA/QC Senior Project Staff Admin.3 Total <br /> Task Items Manager Engr. Struc. Struc. Struc. <br /> Engr. Engr. Engr.1 &2 <br /> Task 5-Group 2 Load Rating Updates <br /> 41st St Over BNSF RR(3 span prestressed concrete girders, concrete crossbeam) 2 2 4 8 18 2 36 <br /> 41st St Over Smith Ave(1 span prestressed multiweb girders) 2 2 2 8 16 2 32 <br /> BROADWAY BRIDGE OC BNSF(3 span prestressed voided slab girders(2 section 2 2 4 10 20 2 40 <br /> types),concrete crossbeam) <br /> LOMBARD BN OVERXING(1 span prestressed decked bulb tee w/transition slabs, 2 2 4 12 22 2 44 <br /> concrete crossbeam,continuous corbel) <br /> OAKES/BNRR OVER-XING(1 span prestressed decked bulb tee) 2 2 2 8 16 2 32 <br /> Pacific Ave Overcrossing(8 span post-tensioned box girder, link slab, link slab beam 2 4 8 24 32 2 72 <br /> ledge,3 concrete crossbeam sections) <br /> POWDER M.ARCHED CULVERT(Plate arch metal culvert) 2 2 4 8 18 2 36 <br /> Smith Avenue Ramp(2 span post-tensioned box girder,concrete crossbeam,connection 2 4 4 10 22 2 44 <br /> to Pacific Ave Overcrossing) <br /> Terminal ST Bridge OC BN(2 span post-tensioned box girder,concrete crossbeam) 2 2 4 10 20 2 40 <br /> TWENTIETH AVENUE WEST(3 span prestressed concrete girder, concrete crossbeam 2 2 4 8 18 2 36 <br /> Total Manhours 20 24 40 106 202 20 412 <br /> Direct Labor Rates(DLR) $ 85.00 $ 85.00 $ 70.00 $ 65.00 $ 50.00 $ 35.00 <br /> Total Direct Salary Cost $1,700 $2,040 $2,800 $6,890 $10,100 $700 $24,230 <br /> Fixed Fee @ 30% of DLR $7,269 <br /> OH @ 131.38%of DLR $36,095 <br /> $67,594 <br /> Direct Costs(Copy, Fedex, ...) $500 <br /> Total $68,094 <br />