My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 9/6/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 9/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 12:38:03 PM
Creation date
10/13/2022 11:45:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
9/6/2022
Council Approval Date
8/31/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Structural On-Call Support
Tracking Number
0003494
Total Compensation
$190,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
David Evans Associates 5/28/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC/ David Evans and Associates 4/22/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Activity uescnpuon Engineer Engineer Engineer Engineer Hamm i ocai�s� <br /> Direct Labor Costs $78.00 $52.01 $52.01 $37.91 $43.75 d <br /> Bridge Inspection: Grand Ave Ped <br /> Project Management and Coordination 2.0 4.0 6.0 <br /> Review and Printout Previous Records 2.0 0.5 0.5 3.0 <br /> Planning: Rope Access 3.0 1.0 1.0 5.0 <br /> Travel 24.0 4.0 4.0 32.0 <br /> Inspection 14.0 14.0 14.0 42.0 <br /> Reporting 2.0 12.0 14.0 <br /> Quality Assurance 1.0 1.0 <br /> Administration 2.0 2.0 <br /> Direct Labor Hours 3.00 47.00 21.50 31.50 103.00 <br /> Direct Labor Costs (DLC) $234.00 $2,444.47 $1,118.22 $1,194.17 $87.50 $5,078 <br /> Fixed Fee based on 0.3 of DLC <br /> Costs based on 1.3791 of DLC (OH) $70.20 $733.34 $335.46 $358.25 $26.25 $1,524 <br /> Labor Costs $322.71 $3,371.17 $1,542.13 $1,646.87 $120.67 $7,004 <br /> $626.91 $6,548.98 $2,995.81 $3,199.29 $234.42 $13,605 <br /> FlCKE <br /> Structural Solutions <br /> Direct Labor Costs $13,605 <br /> Indirect Costs <br /> Traffic Control 3000.0 x 1.0 Days $3,000 <br /> Rail Traffic Control 1500.0 x 1.0 Miles $1,500 <br /> Airfare 1500.0 x 1.0 Miles $1,500 <br /> Lodging: (2)x 2 nights, (1)x 3 nights 150.0 x 7.0 Miles $1,050 <br /> Pier Diem: (2)x 2 days, (1)x 4 days 74.0 x 8.0 Miles $592 <br /> Equipment Shipping 500.0 x 1.0 Each $500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.