My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 9/6/2022
>
Contracts
>
6 Years Then Destroy
>
2022
>
Redtail LLC 9/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 12:03:25 PM
Creation date
10/13/2022 12:02:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
9/6/2022
End Date
11/30/2022
Department
Facilities
Department Project Manager
Darcie Byrd
Subject / Project Title
Use of Shore Ave
Public Works WO Number
UP3734
Tracking Number
0003496
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Use of Property
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CNA CNA PARAMOUNT <br /> Contractors' General Liability Extension Endorsement <br /> claims arising solely out of their capacity or status as such and, in the case of a spouse, where such claim seeks <br /> damages from marital community property, jointly held property or property transferred from such natural person <br /> Insured to such spouse. No coverage is provided for any act, error or omission of an estate, heir, legal <br /> representative, or spouse outside the scope of such person's capacity or status as such, provided however that the <br /> spouse of a natural person Named Insured and the spouses of members or partners of joint venture or partnership <br /> Named Insureds are Insureds with respect to such spouses' acts, errors or omissions in the conduct of the Named <br /> Insured's business. <br /> 10. EXPECTED OR INTENDED INJURY—EXCEPTION FOR REASONABLE FORCE <br /> Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled <br /> Exclusions is amended to delete the exclusion entitled Expected or Intended Injury and replace it with the following: <br /> This insurance does not apply to: <br /> Expected or Intended Injury <br /> Bodily injury or property damage expected or intended from the standpoint of the Insured. This exclusion does not <br /> apply to bodily injury or property damage resulting from the use of reasonable force to protect persons or property. <br /> 11. GENERAL AGGREGATE LIMITS OF INSURANCE -PER PROJECT <br /> A. For each construction project away from premises the Named Insured owns or rents, a separate Construction <br /> Project General Aggregate Limit, equal to the amount of the General Aggregate Limit shown in the Declarations, <br /> is the most the Insurer will pay for the sum of: <br /> 1. All damages under Coverage A,except damages because of bodily injury or property damage included in <br /> the products-completed operations hazard;and <br /> 2. All medical expenses under Coverage C, <br /> that arise from occurrences or accidents which can be attributed solely to ongoing operations at that construction <br /> project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations, nor the <br /> Construction Project General Aggregate Limit of any other construction project. <br /> B. All: <br /> 1. Damages under Coverage B, regardless of the number of locations or construction projects involved; <br /> 2. Damages under Coverage A, caused by occurrences which cannot be attributed solely to ongoing <br /> operations at a single construction project, except damages because of bodily injury or property damage <br /> included in the products-completed operations hazard; and <br /> 3. Medical expenses under Coverage C caused by accidents which cannot be attributed solely to ongoing <br /> operations at a single construction project, <br /> will reduce the General Aggregate Limit shown in the Declarations. <br /> C. The limits shown in the Declarations for Each Occurrence, for Damage To Premises Rented To You and for <br /> Medical Expense continue to apply, but will be subject to either the Construction Project General Aggregate Limit <br /> or the General Aggregate Limit shown in the Declarations, depending on whether the occurrence can be <br /> attributed solely to ongoing operations at a particular construction project. <br /> D. When coverage for liability arising out of the products-completed operations hazard is provided, any payments <br /> for damages because of bodily injury or property damage included in the products-completed operations <br /> hazard will reduce the Products-Completed Operations Aggregate Limit shown in the Declarations, regardless of <br /> the number of projects involved. <br /> CNA74705XX(1-15) Policy No: 7015068928 <br /> Page 8 of 17 Endorsement No: 4 <br /> CONTINENTAL CASUALTY COMPANY Effective Date: 07/23/2021 <br /> Insured Name: REDTAIL, LLC <br /> Copyright CNA All Rights Reserved Includes copyrighted material of Insurance Services Office,Inc,with its permission <br />
The URL can be used to link to this page
Your browser does not support the video tag.