Laserfiche WebLink
<br /> City of Everett, Public Works Department, Water Pollution Control Facility <br /> <br />BIOSOLIDS SAMPLING & ANALYSIS PLAN 2 <br /> <br />Following AC2, wastewater flows through the Recirculation Channel to the 130-acre Oxidation Pond and <br />the 25-acre Polishing Pond for further treatment, followed by disinfection and discharge to the <br />Snohomish River. <br />Figure 1 - Aerated Lagoon (AC 1 and 2) <br />