My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 10/6/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
HDR Engineering Inc. 10/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 10:18:22 AM
Creation date
10/14/2022 10:16:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
10/6/2022
Council Approval Date
10/5/2022
End Date
12/31/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Drainage Improvements
Public Works WO Number
UT3792
Tracking Number
0003503
Total Compensation
$1,299,908.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> City of Everett <br /> Lexington Avenue Storm Drainage Improvements <br /> Preliminary Design <br /> Scope of Services <br /> September 2022 <br /> FI) 929 108th Avenue NE, Suite 1300, <br /> Bellevue, WA 98004-4361 <br /> (425)450-6200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.