My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 10/3/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 10/3/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 11:15:31 AM
Creation date
10/14/2022 11:15:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
10/3/2022
Council Approval Date
9/28/2022
End Date
8/1/2022
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Rotary Park Renovations
Tracking Number
0003186
Total Compensation
$19,043.75
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No.: One <br /> Change Order Effective Date: Date of Mayor's Signature <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for the <br /> changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract price <br /> shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or <br /> his designee is authorized to direct Contractor to perform additional work. In calculating such <br /> threshold amounts, Washington State sales tax, if applicable to the Work, has been <br /> considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to,this Change <br /> Order, the work described in Exhibit A, and all work and actual or constructive changes that <br /> occurred or began prior to the date of this Change Order, including, but not limited to, claims <br /> for equitable adjustment of time and compensation, delay, impact, overhead, or <br /> inefficiencies. This provision does not apply to requests for equitable adjustment of time or <br /> price for which the Contractor timely and properly provided notice of a differing site condition, <br /> protest,dispute, claim or Contract Claim as required by the Contract Documents, If the <br /> Contract Documents establish a time period for notice of a differing site condition, protest, <br /> dispute, claim, or Contract Claim that ends after the date of this Change Order, but relates to <br /> work performed prior to the date of this Change Order, then this provision does not apply if <br /> the Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent <br /> explicitly provided herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.