My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 9/20/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County PUD 9/20/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 2:03:28 PM
Creation date
10/21/2022 2:03:17 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
9/20/2022
End Date
1/10/2023
Department
Purchasing
Department Project Manager
Bert Cueva/Randy Loveless
Subject / Project Title
Connection Substation Evergreen Pump Station
Public Works WO Number
UP3747
Tracking Number
0003516
Total Compensation
$14,487.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
425-535-2472 <br />ACCOUNT # <br />CITY OF EVERETT <br />RANDY LOVELESS EXPIRES <br />ACCOUNT #CONTRACT #DATE EXPIRES CONNECT #PROPERTY <br />RLOVELESS@EVERETTWA.GOV <br />Notes: <br />DESIGNER INFORMATION <br />DESCRIPTION <br />Pull and terminate Feeder cables into switchgear, testing <br />District Labor <br />Transportation Equipment <br />General Overhead <br />425-535-2472 <br />QTY <br />1 <br />QUOTE <br />DATE <br />10/12/2022 <br />Providing quality water, power and service at a competitive price <br />Toll-free in Western Washington at 1-877-783-1000, ext. 8272 FAX (425) 783-8650 www.snopud.com <br />QUOTE <br />TOTAL <br />5-309-2736 <br />14,487.00 Subtotal <br />CITY OF EVERETT <br />WORK ORDER # <br />10/12/2022 <br />ATTN: <br />If amounts set forth above were paid for the PUD to permanently connect a new single-phase secondary service at the service address(es) indicated, this is also a receipt for all interest in any customer installed secondary service conductor, intended to be <br />maintained by the pud, between the PUD's primary distrubution system and the delivery point. Ownership of this conductor is transferred and conveyed to satisfy a condition required by the PUD's Line Extenion Regulations for receiving electric utility service. <br />5-309-2736 <br />1/10/2023 <br />1/10/2023 <br />SALES ORDER # <br />128.00 <br />6,563.00 <br />7,796.00 <br />AMOUNT OF QUOTE <br />$14,487.00 <br />14,487.00 Total <br />UNIT COST <br />Mail Remittance to: PO Box 1100 Everett, WA 98206 <br />snopud.com <br />Return this statement with cash or check payment
The URL can be used to link to this page
Your browser does not support the video tag.