Laserfiche WebLink
24v4" <br />0 i ) <br />7 <br />7.1 i — <br />1 jC3 <br />P2 <br />F3 <br />NORTH <br />31'4" <br />CANOPY FOUNDATION PLAN <br />ma <br />311-411 <br />c!) <br />125'44" <br />111-81, <br />ro Co <br />TFE= 98'-0" <br />TYP GRID 7,1 <br />C3 C3 <br />P2 6 P2 <br />F3 S7.20 <br />P TF= E9F3 <br />8'-0" <br />TY <br />TYP GRID 8.1 <br />3194" 191-81, <br />FOR ADD`L INFORMATION, <br />SEE TI DRAWINGS <br />OZ46 <br />C3 'C3 <br />P9 i i P2 <br />F3 F3 <br />36'-0" <br />36v-(Y <br />Csi <br />SV <br />uj <br />ju) <br />10 <br />�L- <br />w <br />L L <br />P.7 <br />T <br />I <br />IT-O" 2,55'- 6P1 241-6" 14'-0'v 361-0" ! 2'-6't 9V0011 29'-6" <br />Cl <br />f <br />: 0- <br />Pi <br />Fl <br />TFE= 98-,0' <br />TYP GRID 8 <br />Ici <br />I <br />IPI <br />_IF <br />S7.20 <br />'TFE= 979-6" TYP <br />TYP GRID 9 <br />i 1c1 <br />1 1 cwl <br />1pi <br />p I <br />Fl <br />L--- <br />--- I <br />T Fl <br />m <br />PARTIAL CANOPY FOUNDATION PLAN NOTES: <br />1. FOR GENERAL STRUCTURAL NOTES, SEE SHEET S0,02. <br />2. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, ELEVATIONS, ETC PRIOR TO FABRICATION OR CONSTRUCTION. <br />3. NOTIFY STRUCTURAL ENGINEER IF (E) FT G CONDITION DIFFERS FROM INFORMATION SHOWN. <br />4(E) - ON PLAN DENOTES -EXISTING. <br />5. TFE - ON PLAN DENOTES TOP OF FOOTING ELEVATION. <br />6. "Cx" - ON PLAN DENOTES COLUMN, FOR SIZE AND BASE F`LA7rE SEE SCHEDULE ON THIS SHEET. <br />7. FOR BAR BENDING DETAIL, SEE 1/37.20. <br />8. "Fx" - ON PLAN DENOTES FOOTING, FOR INFORMATV&tA SEE FOOTING SCHEDULE ON THIS SHEET. CENTER FOOTING BELOW COLUMNS, <br />TYP UNO <br />Cl I IC1 <br />" 4p <br />Pi i 1 pi <br />Fl T- --'Fl <br />C2 cl <br />pi Pl <br />F2 <br />L ----- ----- I I <br />rOLUMN SCHEDULE <br />MARK <br />SIZE <br />BASE PLXrE <br />COMMENTS <br />SIZE <br />TAPE <br />Cl <br />W 1247 <br />1"x14"x1'-4" <br />SEE DETAIL 3/S7.20 <br />C2 <br />W12-,,87 <br />1"x16"x1'-8" <br />SEE DETAIL 4/S1.20 <br />C3 <br />H 33 S 8 c 8,x .5116 <br /><1 4"xl'-2" <br />SEE DETAIL 7/S7.20 <br />FOOTING SCHEDULE <br />MARK <br />SIZE <br />REINFORCING COMMENTS <br />Fl <br />6'-0"x61-0"x2'-0" <br />(8) 46 EA WAY <br />BARS TOP AND B0170M - SFRS <br />F2 <br />1-olf, <br />6 X&-O"XT-0" <br />48 @ 12" OC <br />BARS TOP AND BOTTOM - SFRS <br />F3 <br />4'-0"x4'-0"x1`-6" <br />(4) #6 EA W Y <br />GAF TC AND B0170M - SFRS <br />I F— PIER SCHEDULE <br />1 MARK SIZE REINFORCI COMMENTS <br />—pl <br />30"0 <br />(12) #6 <br />E <br />SEC DETAIL 2/S7.20 <br />P2 <br />24`0 <br />(8) #6 <br />SEE DETAIL 6/S7.20 <br />VAA, U0 763,559.9100 <br />2300 Seekshire Lane K Suite 200 G,Avx.vaaeng.corpi <br />Plymouth, NIN 55441 Project 4 205013 <br />UILFIrma-agistration No. 3035 <br />NO -ICE, 111200ION aLLTECWII I OR4'MN13, DETALS, DEVELOPMENTS, GRAPHICS AND �WJDELS THEREOF, ARE THE <br />EXCLU911.1E PPOPERTY OF Vkl, LW. AlID CANT BE COPIED, DUPLICATED, REPRODUM) OR <br />Y EVLICITEQ, IN WHOLE OR IN PART, NOR C44 ANY DERIVATIVE <br />',YORr BE 1401 UNLESS EXPRESSLY AUTHORIZED IN WRITING BYWA, LI.C. <br />COPYRIGHT VAA, LLC 2020 - ALL FIGHTS FEESERVER <br />um <br />6617 ASSOCIATED BLVD <br />BUILDING B, SUITE 100 <br />EVERETT, WA 98203 <br />w" <br />z <br />w <br />LLJ (a) <br />z <br />ws <br />C <br />:D), <br />0 <br />0) 21- <br />�4-0 D <br />a. <br />0 <br />co <br />0 <br />z <br />m w <br />REVISION A DATE <br />Issue For Permit 0 09/17/2020 <br />— — --------------- ---- <br />� �j <br />--4 <br />OrF <br />c <br />4,0 <br />IS k <br />�x <br />9/17/20 <br />JOB NUMBER <br />205013 <br />DRAWN BY CHECKED BY <br />AA D RRP/BMS <br />'SHEET TITLE <br />IIIIIIIIIIIMIM <br />CANOPY FOUNDATION PLAN <br />1/8 <br />u = 11-01, <br />SHEET NUMBER <br />S1.21 <br />