SITE PLAN
<br />SCALE: 1 "=80'-O" 0 40' 80' 160'
<br />NOTES:
<br />1. ALL SYSTEM CONTROL VALVES TO BE MONITORED,
<br />2, EFFECTIVE POINT OF WATER FLOW TEST DATA SHALL BE UTILIZED, NO OTHER LOCATIONS
<br />WILL BE ACCEPTABLE PER OWNER REQUIREMENTS.
<br />)VICINITY MAP
<br />-SCALE: NTS
<br />EVERETT DELIVERY CENTER
<br />SCALE: NTS
<br />IVLYY VI"IIV VI I. JLL JIILLI '.
<br />FP2.0 FOR MORE DETAIL.
<br />CON TRACTOR - �/E-RrF fl
<br />- - --
<br />EXTENT OF WORK.
<br />CONSULTING
<br />7611 re€frdvwx,xdf Avert: ep, #C(Yl
<br />mo ttle,WA 9810u
<br />pn6lmgrolffs
<br />nrg fiferan0,UIfingxol'n^
<br />© MG2. All rights reserved. No part of this document may be
<br />reproduced in any form or by any means without permission in
<br />writing from MG2.
<br />m
<br />6617 ASSOCIATED BLVD
<br />EVERETT, WA 98203
<br />•
<br />1, SPRINKLER PLANS ARE SCHEMATIC AND SHALL NOT BE MEANT TO CONVEY OR
<br />ALLOW DISCREPANCY BETWEEN THE WORK ILLUSTRATED HEREIN AND ALL APPLICABLE
<br />CODES, PLANS AND ORDINANCES. IT SHALL BE THE RESPONSIBILITY OF THE SPRINKLER
<br />CONTRACTOR TO VERIFY ACTUAL CONDITIONS OF CONSTRUCTION AND TO MAINTAIN
<br />CONFORMANCE TO THE REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION.
<br />DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT OR OWNER'S
<br />REPRESENTATIVE PRIOR TO BID.
<br />2. ALL INSTALLATIONS SHALL CONFORM TO THE REQUIREMENTS OF NFPA 13, THE
<br />AUTHORITIES HAVING JURISDICTION, THE OWNERS' INSURANCE CARRIER, THE TRUSS
<br />MANUFACTURER AND STRUCTURAL ENGINEER, AND THE OWNERS' REVIEWING CONSULTANT.
<br />3. ALL MATERIALS USED SHALL BE UL LISTED AND APPROVED.
<br />4. SYSTEMS SHALL BE MONITORED BY AN OFF SITE CENTRAL STATION. z
<br />5. INSTALLATION AND FABRICATION SHALL NOT COMMENCE UNTIL PLANS AND
<br />CALCULATIONS ARE APPROVED BY ALL AUTHORITIES MENTIONED ABOVE OR WORK WILL BE
<br />DONE "AT RISK" AND WILL BE THE RESPONSIBILITY ON THE SPRINKLER CONTRACTOR TO
<br />RECTIFY AT NO COST TO THE OWNER.
<br />6. AT VARIOUS STAGES, AND/OR UPON COMPLETION, THE SYSTEMS MUST BE TESTED
<br />IN THE PRESENCE OF THE ENFORCING AGENCY. z
<br />7. PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED WITH AN APPROVED
<br />MATERIAL AS PRESCRIBED BY THE AHJ. 0
<br />8. ALL HANGER TYPES, SIZES, AND METHODS OF ATTACHMENT MUST MEET
<br />REQUIREMENTS OF REVIEWING AUTHORITIES MENTIONED ABOVE.
<br />9, SEE FIRE SPRINKLER SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND
<br />INFORMATION, THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL SITE INFORMATION
<br />WITH ARCHITECT AND CIVIL ENGINEER.
<br />10. SPRINKLER CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
<br />CONSTRUCTION PRACTICES, SPRINKLER CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE
<br />AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
<br />CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.
<br />THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO
<br />NORMAL WORKING HOURS, SPRINKLER CONTRACTOR FURTHER AGREES TO DEFEND,
<br />INDEMNIFY, AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, 0
<br />REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT. _
<br />11. CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR Z o>� O .J
<br />UNAUTHORIZED CHANGES TO OR USE OF THESE PLANS. ALL CHANGES TO THE PLANS
<br />MUST BE SUBMITTED IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE < r W In
<br />PLANS. ry W
<br />12, THE ENGINEER OF DESIGN SHALL NOT BE RESPONSIBLE FOR THE SPRINKLER 0 ® N
<br />CONTRACTORS' FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH w 00
<br />THE CONTRACT DOCUMENTS, NOR SHALL HE BE REQUIRED TO SUPERVISE THE CONDUCT 0)
<br />OF THE WORK OR THE CONSTRUCTION PROCEDURES FOLLOWED BY THE CONTRACTOR, OR
<br />SUBCONTRACTORS, OR THEIR RESPECTIVE EMPLOYEES OR BY ANY OTHER PERSON AT THE VJ
<br />JOB SITE OTHER THAN THAT OF THE ENGINEERING FIRMS' EMPLOYEES.
<br />13. FIRE SPRINKLER SHOP DRAWINGS, WITH DETAILS SHOWING HANGERS, FASTENERS, L1.i
<br />AND ATTACHMENT METHODS AND SIZES, SHALL BE SUBMITTED TO THE TRUSS 0
<br />Uj r� 0
<br />MANUFACTURER AND STRUCTURAL ENGINEER FOR APPROVAL. A LETTER OF APPROVAL W
<br />SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE PRIOR TO FINAL ACCEPTANCE
<br />BY OWNER. THE DETAILS SHALL INCLUDE ALL HANGERS, AND EARTHQUAKE BRACING ry z
<br />ATTACHMENTS. < � Q
<br />14, IT IS THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR TO FAMILIARIZE h
<br />THEMSELVES WITH THE BID SPECIFICATION DOCUMENTS, AND TO BRING ANY POTENTIAL 0
<br />CONFLICTS TO THE ATTENTION OF THE ARCHITECT PRIOR TO BID. M�
<br />15. CORRECT SPRINKLER LOCATIONS AND/OR QUANTITIES DUE TO NEW/EXISTING Uj W 8o
<br />OBSTRUCTIONS IS THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR. COORDINATE
<br />PIPING WITH ALL OTHER TRADES AND REVIEW ALL OTHER TRADES DRAWINGS.
<br />CONTRACTOR SHALL PLACE IN THEIR BID AS A SEPARATE LINE ITEM EXTRA QUANTITIES -.I-
<br />OF SPRINKLERS, PIPING, FITTINGS, HANGERS, OTHER ASSOCIATED EQUIPMENT/MATERIALS DESCRIPTION A DATE
<br />AND LABOR. COST OF EXTRA ITEMS INDICATED SHALL BE ACCOUNTED FOR AT TIME OF QAREVIEW SET - 05/22/2020
<br />BID, CONTRACTOR WILL NOT BE AWARDED COST OF EXTRA ITEMS, UNLESS OWNER
<br />CHANGES INDICATED OTHERWISE. ANY ADDITIONAL WORK (DESIGN, FABRICATION, OR 90% QA REVIEW SET - 06/19/2020
<br />INSTALLATION) SHALL BE APPROVED PRIOR TO COMMENCEMENT OF ADDITIONAL CHANGES, PERMIT SET - 09/17/2020
<br />NO EXCEPTIONS.
<br />16. ALL PERMITS ARE THE RESPONSIBILITY OF THE SPRINKLER CONTRACTOR.
<br />17. FLUSH CONNECTIONS SHALL BE PROVIDED PER NFPA 13.
<br />18. ALL DEFLECTOR DISTANCE REQUIREMENTS OF NFPA 13 MUST BE COMPLIED WITH
<br />19. CRIMP TYPE INSTALLATIONS ARE NOT ACCEPTABLE.
<br />20. THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL SITE INFORMATION WITH
<br />ARCHITECT AND CIVIL ENGINEER.
<br />21. THE SPRINKLER CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF NFPA 13
<br />"PROTECTION OF PIPING AGAINST DAMAGE WHERE SUBJECT TO EARTHQUAKES". THE _
<br />SPRINKLER CONTRACTOR MUST ALSO TAKE INTO ACCOUNT THE LIMITATIONS OF THE
<br />STRUCTURAL ELEMENTS PRIOR TO SIZING, FASTENING AND/OR LOCATING SEISMIC
<br />ASSEMBLIES, RESTRAINTS, ETC, ON THEIR PLANS. STRUCTURAL REQUIREMENTS AND
<br />LIMITATIONS MAY BE MORE STRINGENT THAN NFPA. NO ADDITIONAL COMPENSATION FROM
<br />OWNER RELATING TO THE SPRINKLER CONTRACTORS FAILURE TO CONSIDER AND
<br />COORDINATEWITH THE STRUCTURAL ENGINEER AS IT RELATES TO LOAD, FASTENING
<br />METHODS, LOCATION ETC OF ALL SEISMIC CONNECTIONS TO THE STRUCTURE WILL BE
<br />CONSIDERED.
<br />22. AS PART OF THE OWNER'S CLOSE OUT DOCUMENTS, THE SPRINKLER CONTRACTOR
<br />SHALL REVISE THEIR PLANS AND ISSUE AN "AS -BUILT" (IN COMPLIANCE TO NFPA 13)
<br />AS -BUILT PLANS SHALL HAVE ALL NOTES REMOVED THAT REFERENCE "CONTRACTOR TO
<br />VERIFY" ETC. AS THESE ARE INSTRUCTIONS TO THE SPRINKLER CONTRACTOR FOR THEIR
<br />SCOPE OF WORK. AS -BUILT PLANS SHALL HAVE CONSULTING/NRG INFORMATION
<br />REMOVED (EXCEPT FLOW TEST/PUMP TEST DATA) FROM THEIR PLANS PRIOR TO
<br />ISSUANCE. 1 SET OF AS -BUILT PLANS SHALL REMAIN ON SITE AND PLANS,
<br />CALCULATIONS, ETC.
<br />APPLICABLE BUILDING CODES
<br />INTERNATIONAL BUILDING CODE 2015
<br />INTERNATIONAL FIRE CODE 2015
<br />APPLICABLE STANDARDS:
<br />NFPA 13 2013
<br />PROJECT STATUS
<br />SHEET INDEX
<br />SHEET SHEET NAME
<br />NUMBER
<br />FP1.0 FIRE PROTECTION SITE PLAN AND NOTES
<br />FP2.0 FIRE PROTECTION PARTIAL PLAN
<br />JOB NUMBER
<br />20574401B
<br />DRAWN BY CHECKED BY
<br />A. HOLTON R. ANDERSON
<br />SHEET TITLE
<br />FIRE PROTECTION
<br />SITE PLAN AND
<br />NOTES
<br />SHEET NUMBER
<br />FP1 wO
<br />
|