Laserfiche WebLink
S-PEC8&K INSPECTION <br />���N��N�8� �����8�i ������������ <br />STRUCTURAL `^���� / ��:�/-�u_ SPECIAL INSPECTIONS <br />, ,��^��� <br />GENERAL: <br />SCOPE: THE PROVISIONS OF THIS SECTION ARE TO DEFINE THE REQUIRED STRUCTURAL SPECIAL INSPECTIONS AND TESTING IN <br />ACCORDANCE WITH THE 2019 CBC CHAPTER 17, <br />����I������NS: <br />APPROVED - ACCEPTABLETO THE BUILDING OFFICIAL OR AUTHORITY HAVING JURISDICTION. <br />APPROVED AGENCY - AN ESTABLISHED AND RECOGNIZED AGENCY REGULARLY ENGAGED IN CONDUCTING TESTS OR <br />FURNISHING INSPECTION, WHEN SUCH AGENCYHAS BEEN APPROVED. <br />APPROVED FABRICATOR - AN ESTABLISHED AND QUALIFIED PERSON, FIRM OR CORPORATION APPROVED BY THE BUILDING <br />OFFICIAL PURSUANT TOCBCCHAPTER 17. <br />CERTIFICATE OF COMPLIANCE - A CERTIFICAT E STATING MATERIALS AND PRODUCTS MEET SPECIFIED STANDARDS OR THAT <br />WORK WAS DONE |NCOMPLIANCE WITH APPROVED CONSTRUCTION DOCUMENTS. <br />DESIGNATED SEISMIC SYSTEM - THOSE NONSTRUCTURAL COMPONENTS THAT REQUIRE DESIGN IN ACCORDANCE WITH CHAPTER <br />'13 OF ASCE 7 AND FOR WHICH THE COMPONENT IMPORTANCE FACTOR, Ip, IS GREATER THAN I IN ACCORDANCE WITH SECTION <br />13.1.3 OF ASCE 7. <br />FABRICATED ITEM - 8TRUCTURAL, LOAD -BEARING OR LATERAL LOAD -RESISTING ASSEMBLIES CONSISTING OF MATERIALS <br />ASSEMBLED PRIOR TO INSTALLATION |NABUILDING OR STRUCTURE, ORSUBJECTED TOOPERATIONS SUCH AS HEAT TREATMENT, <br />THERMAL CUTTING, COLD WORKING OR REFORMING AFTER MANUFACTURE AND PRIOR TO INSTALLATION |NABUILDING OR <br />STRUCTURE. MATERIALS PRODUCED |NACCORDANCE WITH STANDARD SPECIFICATIONS REFERENCED BY THE CBC, SUCH AS <br />ROLLED STRUCTURAL STEEL 8HAPES, STEEL REINFORCING BARS, MASONRY UNITS AND WOOD STRUCTURAL PANELS, OR IN <br />ACCORDANCE WITH AREFERENCED STANDARD WHICH PROVIDES REQUIREMENTS FOR QUALITY CONTROL DONE UNDER THE <br />SUPERVISION OF A THIRD -PARTY QUALITY CONTROL AGENCY, SHALL NOT BE CONSIDERED "FABRICATED ITEMS". <br />INSPECTION CERTIFICATE - AN IDENTIFICATION APPLIED ON A PRODUCT BY AN APPROVED AGENCY CONTAINING THE NAME OF <br />THE MANUFACTURER, THE FUNCTION AND PERFDRK8AGCE CHARACTER|GT|CS, AND THE NAME AND IDENTIFICATION OF AN <br />APPROVED AGENCY THAT INDICATES THAT THE PRODUCT OR MATERIAL HAS BEEN INSPECTED AND EVALUATED BY AN APPROVED <br />AGFNCv- <br />-ANASSEMBLAGE 0FSTRUCTURAL ELEMENTS ASSIGNED TOPROVIDE SUPPORT AND <br />STABILITY FOR THE OVERALL STRUCTURE. THE SYSTEM GENERALLY RECEIVES WIND LOADING FROM MORE THAN ONE SURFACE. <br />SPECIAL INSPECTION - INSPECTION OF CONSTRUCTION REQUIRING THE EXPERTISE OF AN APPROVED SPECIAL INSPECTOR IN <br />ORDER TO ENSURE COMPLIANCE WITH THE CODE AND THESE CONSTRUCTION DOCUMENTS. <br />CONTINUOUS SPECIAL INSPECTION - SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT WHEN AND WHERE <br />TMEVVORKT0 BE INSPECTED IS BEING PERFORMED. <br />INSPECTIONPERIODIC SPECIAL SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY PRESENT <br />WHERE THE WORK TO BE INSPECTED HAS BEEN DR IS BEING PERFORMED. <br />OBSERVE - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. <br />PERFORM ' PERFORM THESE TASKS FOR EACH WELDED JOINT ORMEMBER, BOLTED CONNECTION, ORSTEEL ELEMENT. <br />Sp - A QUALIFIED PERSON EMPLOYED OR RETAINED BY AN APPROVED AGENCY AND APPROVED BY THE <br />BUILDING OFFICIAL AS HAVING THE COMPETENCE NECESSARY TO INSPECT A PARTICULAR TYPE OF CONSTRUCTION REQUIRING <br />SPECIAL INSPECTION. <br />STRUCTURAL OBSERVATION - THE VISUAL OBSERVATION OF -1 HE STRUCTURAL SYSTEM BY A REGISTERED DESIGN PROFESSIONAL <br />FOR GENERAL CONFORMANCE TOTHE APPROVED CONSTRUCTION DOCUMENTS. STRUCTURALOBSERVATION DOES NOT INCLUDE <br />OR WAIVE THE' REGPONS|B|L|TYFOR INSPECTION REQUIRED BY THE CBC� <br />JOB -SITE PROTOCOL FOR SPECIAL INSPECTION: <br />1. THE CONSTRUCTION OR WORK FOR WHICH SPECIAL If'\ISPECTiON IS REQUIRED SHALL REMAIN ACCESSIBLE AND EXPOSED FOR <br />SPECIAL INSPECT ION PURPOSES UNTIL COMPLETION OF THE REQUIRED SPECIAL INSPECTIONS. <br />2. ADEQUATE NOTICE SHALL BE PROVIDED SO THAT THE SPECIAL INSPECTOR HAS TIME TO BECOME FAMILIAR WITH THE <br />PROJECT. <br />3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE SPECIAL INSPECTOR WITH ACCESS TO APPROVED PLANS. <br />4. WHEN REQUIRED BY -THE BUILDING OFFICIAL, THE CONTRACTOR IS RESPONSIBLE FOR RETAINING, AT THE JOB SITE, ALL <br />SPECIAL INSPECTION RECORDS SUBMITTED BY THE INSPECTOR AND PROVIDING THESE RECORDS FOR REVIEW BY THE <br />BUILDING DERARTK8ENTSINSPECTOR UPON REQUEST. <br />REQUIRED VERIFICATION AND INSPECTIONS, <br />VERIFICATION AND INSPECTION OF ELEMENTS OF BUILDINGS AND STRUCTURES SHALL BE AS REQUIRED BY THIS SECTION. <br />SP'ECIAL CASES: SPECIAL INSPECTIONS SHALL BE REQUIRED FOR PROPOSED WORK THAT IS, IN THE OPINION OF THE BUILDING <br />OFFICIAL, UNUSUAL IN ITS NATURE, SUCH AS, BUT NOT LIMITED TO, THE FOLLOWING EXAMPLES: <br />1. CONSTRUCTION MATERIALS AND SYSTEMS THAT ARE ALTERNATIVES TO MATERIALS AND SYSTEMS PRESCRIBED BY THE CBC. <br />2. UNUSUAL DESIGN APPLICATIONS OFMATERIALS DESCRIBED |NTHE CBC. <br />3 MATERIALS AND SYSTEMS REQUIRED TO BE INSTALLED IN ACCORDANCE WITH ADDITIONAL MANUFACTURER'S INSTRUCTIONS <br />THAT PRESCRIBE REQUIREMENTS NOT CONTAINED IN THIS CODE OR IN STANDARDS REFERENCED BY THE CBC. <br />1����������-������ ���� FABRICATORS <br />^/���r �_��/ x��:� ��" <br />WHERE FABRICATION OF STRUCTURAL LOAD -BEARING MEMBERS AND ASSEMBLIES IS BEING PERFORMED ON THE PREMISES OF A <br />FABR|CATDR'SSHOP.SPECIAL|NSPECTONOFTHEFABR(CATEQ|TEK8SGHALLBEREC)U|REDBYTH|SSECT|DNANDASRE0U|REQ <br />|NTHE CBC. <br />THE SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR MAINTAINS DETAILED FABRICATION AND QUALITY CONTROL <br />PR[)CEDURE3THATPROV!DEA8AS|0FOR|NGPECT|DNCDNTR(}LOFTHEVVORKKdANSH|PANDTHEFABR|CATQR'SA8|L|TYTO <br />CONFORM TO THE APPROVED CONST RUCTION DOCUMENTS AND REFERENCED STANDARDS. THE SPECIAL INSPECTOR SHALL <br />REVIEW THE PROCEDURES FOR COMPLETENESS AND ADEQUACY RELATIVE TOTHE CODE REQUIREMENTS FOR THE <br />FABRICATOR'S SCOPE Or' VVURK� <br />EXCEPTION: SPECIAL INSPECTIONS ARE REQUIRED BY THIS SECTION SHALL NOT BE REQUIRED WHERE THE FABRICATOR IS <br />APPROVED |NACCORDANCE WITH THE FOLLOWING: <br />SPECIAL INSPECTIONS ARE NOT REQUIRED WHERE THE WORK IS DONE ON THE PREMISES OF A FABRICATOR REGISTERED AND <br />APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION, APPROVAL SHALL. BE BASED UPON REVIEW OF THE <br />FABRICATOR'S WRITTEN PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC AUDITING OF FABRICATION PRACTICES <br />BY AN APPROVED SPECIAL INSPECTION AGENCY. AT COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A <br />CERTIFICATE OF COINJIPLIANCE TO THE BUILDING OFFICIAL STATING THAT TFIE WORK WAS PERFORMED IN ACCORDANCE WITH THE <br />APPROVED CONSTRUCTION DOCUMENTS. <br />| SOILS / SHALLOW ���0 ��� 1K�N� / <br />/ ����x^_�� / FOUNDATIONS o��^��� | <br />VERIFICATION AND INSPECTION -TASK z C <br />THE APPROVED GEOTECHNICAL REPORT, AND -THESE CONSTRUCTION DOCUMENTS SHALL BE USED TO DETERMINE COMPLIANCE <br />DURING FILL PLACEMENT, THE SPECIAL INSPECTOR SHALL DETERMINE THE PROPER MATERIALS AND PROCEDURES ARE USED IN <br />ACCORDANCE WITH THE PROVISIONS OF THE APPROVED GEOTECHNICAL REPORT. -_ <br />I . VERIFYMATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CA I - __ I X <br />2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL ___ __ _� X <br />3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS X <br />4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND COMPACTION OF , <br />COMPACTED FILL - -_ <br />5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND VERIFY THAT SITE HAS BEEN PREP -_ X <br />PROPERLY <br />I CONCRETE CONSTRUCTION <br />- <br />MATERIALS: IN THE ABSENCE OF SUFFICIENT DATA OR DOCUMENTATION PROVIDING EVIDENCE OF CONFORMANCE TO QUALITY <br />STANDARDS FOR MATERIALS IN ACI 318 CHAPTER 3 THE BUILDING OFFICIAL SHALL REQUIRE TESTING OF MATERIALS IN <br />ACC ,ORDANCE WITH THE APPROPRIATE STANDARDS AND CRITERIA FOR THE MATERIAL IN ACI 318 CHAPTER 3. WELDABILITY OF <br />REINFORCEMENT, EXCEPT THAT WHICH CONFORMS TO ASTiNil A 706, SHALL BE DETERMINED IN ACCORDANCE WITH THE <br />VERIFICATION AND INSPECTION TASK <br />z <br />0 <br />z <br />Ili <br />1 . INSPECTION OF REINFORCING STEEL, INCLUDING PRESTRESSING TENDONS, AND PLACEMENT - <br />---Fx <br />2. INSPECTION OF REINFORCING STEEL WELDING IN ACCORDANCE WITH THE REINFORCING STEEL TASK UNDER STEEL <br />__ <br />__ <br />4. VERIFYING USE OF REQUIRED DESIGN MIX <br />-_ <br />I-x- <br />__� <br />5AT THE TIME FRESH CONCRETE IS SAMPLED 1-0 FABRICATE SPECIMENS FOR STRENGTF TE_ST��, PERFORM SLUMP <br />X <br />-_ <br />AND AIR CONTE' :NT TESTS, AND DETERMINE THE TEMPERATURE OF THE CONCRETE <br />_. <br />6. TESTING AND SAMPLING OF CONCRETE: <br />- <br />--I <br />(A) STRENGTH TEST SAMPLES: SAMPLING PROCEDURE: AsTm C172. CYLINDER MOLDING AND CURING PROCEDURE: <br />ASTM C31/C31 M, CYLINDER SPECIMENS, STANDARD CURED. SAMPLE CONCRETE AND MAKE ONE SET OF FIVE 4X8 <br />OR FOUR 6X12 CYLINDERS FOR EACH DAY'S POUR BETWEEN ONE AND 25 CUBIC YARDS. IF A DAY'S POUR EXCEEDS <br />25 CUBIC YARDS, MAKE FIVE 4X8 OR FOUR 6X12 CYLINDERS FOR EACH ADDITIONAL 50 CUBIC YARDS. WHEN VOLUME <br />OF CONCRETE FOR ANY CLASS OF CONCRETE WOULD PROVIDE LESS THAN FIVE SETS OF CYLINDERS, TAKE <br />SAMPLES FROM FIVE RANDOMLY SELECTED BATCHES, OR FROM EVERY BATCH WHEN LESS THAN FIVE BATCHES <br />ARE USED. MAKE ONE ADDITIONAL CYLINDER DURING COLD WEATHER CONCRETING, AND FIELD CURE. <br />(B) FIELD TESTING: SLUMP TEST METHOD: ASTM C143/C143M. AIR CONTENT TEST METHOD: ASTM C173/C173M OR ASTM <br />C231. TEMPERATURE TEST METHOD: ASTM C1 064/Cl 064M. AT THE TIME FRESH CONCRETF 13 SAMPLED, MEASURE <br />__ <br />x <br />SLUMP AND TEMPERATURE FOR EACH COMPRESSIVE STRENTH CONCRETE SAMPLE. MEASURE AIR CONTENT IN AIR <br />ENTRAINED CONCRETE FOR EACH COMPRESSIVE STRENTH CONCRETE SAMPLE. <br />p CYLINDER COMPRESSIVE STRENGTH TESTING: TEST METHOD: ASTM C39/C39M. -TEST A CCEPTANCE IN ACCORDANCE <br />WITH ACI 318. TEST ONE CYLINDER AT 7 DAYS, TEST THREE 4X8 OR TWO 6X12 CYLINDERS AT 28 DA Y,S. RETAIN ONE <br />CYLINDER FOR 56 DAYS FOR TESTING WHEN EARLIER TESTS SHOW LOW STRENGTH. DISPOSE REMAINING <br />i <br />CYLINDERS WHEN TESTING IS NOT REQUIRED, <br />(D) CORE COMPRESSIVE STRENGTH TESTING: SAMPLING AND TESTING PROCEDURES: ASTM C42/C42M.TEST <br />� <br />ACCEPTANCE: IN ACCORDANCE WITH ACI 318. DRILL THREE CORES FOR EACH FAILED STRENGTH TEST FROM <br />I <br />C ONCRPTE REPRESENTED BY FAILED STRENGTH TEST. <br />' <br />7. INSPECTION OF CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES - <br />-_ <br />X <br />__ __ <br />S. IN_SP'ECTION_FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES <br />__ <br />��_ <br />9. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED _____ <br />- <br />[AX-1 <br />���������� CONSTRUCTION <br />�����������| U��|���J <br />MASONRY ����v��� n / ����� / '��'w <br />VERIFICATION AND INSPECTION TASK <br />7 <br />0 <br />i . VERIFICATION OF SLUMP FLOW AND VISUAL STABILITY INDEX (VSI) AS DELIVERED TO THE SITE FOR SELF- <br />X <br />-_ <br />CONSOLIDATING GROUT _ _____ <br />2. VERIFICATION OF fm AND f',Ac PRIOR TO CONSTRUCTION EXCEPT WERE SPECIFICALLY EXEMPTED BY THE ADOPTED <br />-_ <br />x <br />3, VERIFY COMPLIANCE WITH APPROVED SUBMITTALS <br />-_ <br />X <br />- <br />4AS MASONRY CONSTRUCTION BEGINS, THE FOLLOWING SHALL BE VERIFIED TO ENSURE COMPLIANCE: (A) <br />- <br />PROPORTIONS OF SITE -PREPARED MORTAR, (B) B. CONSTRUCTION OF MORTAR JOINTS, (C) GRADE AND SIZE OF <br />-_ <br />X <br />PRESTRESSING TENDONS AND ANCHORAGES, (D) LOCATION OF REINFORCEMENT, CONNECTORS, PRESTRESSING <br />(F) PROPERTIES OF THIN -BED MORTAR FOR AAC MASONRY: CONTINUOUS FOR THE FIRST �,_000SSOjJARE FEET, <br />X <br />X <br />AFTER THE FIRST 5,000 SQUARE FEET <br />-PERIODIC _____ <br />5. PRIOR TO GROUTING, TFIE FOLLOWING SHALL BE VERIFIED TO ENSURE COMPLIANCE: (A) GROUT SPACE, (B) GRADE, <br />TYPE, AND SIZE OF REINFORCEMENT AND ANCHOR BOLTS, AND PRESTRESSING TENDONS AND ANCHORAGES, (C) <br />PLACEMENT OF REINFORCEMENT, CONNECTORS, AND PRESTRESSING TENDONS AND ANCHORAGE, (D) <br />-_ <br />X <br />PROPORTIONS OF SITE -PREPARED GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS, (E) CONSTRUCTION <br />6. VERIFY DURING CONSTRUCTION: (A) SIZE AND LOCATION OF STRUCTURAL ELEMENTS, (B) TYPE, SIZE AND LOCATION <br />OF ANCHORS, INCLUDING OTHER DETAILS OF ANCHORAGE OF MASONRY TO STRUCTURAL MEMBERS. FRAMES OR <br />-_ <br />X <br />OTHER CONSTRUCTION, (C) PREPARATION, CONSTRUCTION AND PROTECTION OF MASONRY DURING COLD <br />WEATHER _(I�,�MF�ERATURE BE (LVV 40F) OR HOT WEATHER (TEMPERATURE ABOVE 9OF <br />(D) PLACEIVIE-NT OF GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS IS IN COMPLIANCE, (E) WEL I OF <br />X <br />__ <br />(G) PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION ON THIN--BE_D MORTAR JOINTS: CONTINUOUS FOR <br />X <br />x <br />THE FIRST 5,000 SQUARE FEET, PERIODIC AFTER THE FIRST 5,000 SQUARE FEET. <br />7. OBSERVE PREPARATION OF GROUT SPECIMEINS, MORTAR SPECIMENS, AND/OR PRISMS <br />__ <br />X <br />�x����|�������������o�������������������^�&j���������y�&�x���� <br />x ���� o-/u��� ,^�a_�_�_�� r�x���x x�^/��� ox� HARDENED CONCRETE ��,^ o�^x-y�,��/�'^u <br />VERIFICATION AND INSPECTION TASK z 0 <br />1. INSTALLATION Or' MECHANICAL ANCHORS INTO HARDENED CONCRETE <br />2. INSTALLATION OF ADHESIVE ANCHORS INTO HARDENED CONCRETE <br />a SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR <br />ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH ACI 355,2 OR OTHER QUALIFICATION PROCEDURES. WHERE <br />SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE <br />REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL PRIOR TO THE COMMENCEMENT <br />0FTHE WORK. <br />b IN ACCORDANCE WITI H THE RESEARCH REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE <br />STEEL��������Y o��������[��8 �������J <br />�_�_"~ ����'��� x ` ����� x o��x� <br />1 . APPROVED FABRICATORS AND ERECTORS: QUALITY ASSURANCE (OA) INSPECTIONS, EXCEPT NONDESTRUCTIVE TESTING <br />(NDT), MAY BE WAIVED WHEN THE WORK IS PERFORMED IN A FABRICATION SHOP OR BY AN ERECTOR APPROVED TO <br />PERFORM WORK WITHOUT CA. NDT OF WELDS COMPLETED IN AN APPROVED FABRICATOR'S SHOP MAY BE PERFORMED BY <br />THATFA80CATDRWHENAPPROVED.VVHENTHEFA8R|C/AT)RPERFORM@NDT.THEOAAGEMCYGHALLREV|EVVTHE <br />FABRICATOR'S NDT REPORTS. AT COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE <br />OF COMPLIANCE TO THE BUILDING OFFICIAL OR AUTHORITY HAVING JURISDICTION STATING THAT THE MATERIALS SUPPLIED <br />AND THE WORK PERFORMED BY THE FABRICATOR ARE IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, AT <br />COMPLETION OF ERECTION, THE APPROVED ERECTOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE BUILDING <br />OFFICIAL OR AUTHORITY HAVING JURISDICTION STATING THAT THE MATERIALS SUPPLIED AND WORK. PERFORMED BY THE- <br />ERECTORARE|NACCDRDANCEVV|THTHEC0NSTRUCT|0NDOCUMENTS. <br />z STRUCTURAL STEEL: SPECIAL INSPECTION FOR STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE "STRUCTURAL <br />STEEL" TABLE BELOW AND THIS SECTION. <br />(A) QUALITY CONTROL (QC): QC INSPECTION TASK SHALL BE PERFORMED BY THE FABRICATOR'S OR ERECTOR'S QUALITY <br />CONTROL INSPECTOR (UC!).ASAPPLICABLE, |MACCORDANCE WITH TH|s SECTION. <br />(8) QUALITY ASSURANCE (QA)-. OA INSPECTION OF FABRICATED ITEMS SHALL BE MADE AT THE FABRICATOR'S PLANT. THE <br />QUALITY ASSURANCE INSPECTOR (QAI) SHALL SCHEDULE THIS WORK TO MINIMIZE INTERRUPTION TO THE WORK OF THE <br />FABRICATOR. OA INSPECTION OF THE ERECTED ST'E:EL SYSTEM SHALL BE MADE AT THE PROJECT SITE. THE QAl SHALL <br />SCHEDULE THIS WORKTO MINIMIZE INTERRUPTION TO THE WORK OF THE ERECTOR. THE QAI SHALL REVIEW THE MATERIAL <br />TEST REPORTS AND CERTIFICATIONS FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. CONCURRENT WITH THE <br />SUBMITTAL OF SUCH REPORTS TO THE BUILDING OFFICIAL OR AUTHORITY HAVING JURISDICTION, ENGINEER OF RECORD OR <br />OWNER, THE OA AGENCY SHALL SUBMIT TO THE FABRICATOR AND ERECTOR-. (1) INSPECTION REPORTS, (2) NONDESTRUCTIVE <br />TESTING REPORTS. <br />(C) TO ENSURE THAT THE WORK IS PERFORMED IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, TASKS IN <br />"STRUCTURAL STEEL" TABLE BELOW IDENTIFIED AS: (1) QC ARE THOSE INSPECTIONS PERFORMED BY THE QCI (2) QA ARE <br />THOSE INSPECTIONS PERFORMED BY THE QAI (3) UNSPECIFIED ARE QC AND QA INSPECTIONS PERFORMED BY THE QCI AND <br />(D) COORDINATED INSPECTION: WHERE A I -ASK IS NOTED TO BE PERFORMED BY BOTH QC AND QA, IT IS PERMITTED TO <br />COORDINATE THE INSPECTION FUNCTION BETWEEN THE QCI AND QAI 30 THAT THE INSPECTION FUNCTIONS ARE PERFORMED <br />BY ONLY ONE PARTY. WHERE QA RELIES UPON INSPECTION FUNCTIONS PERFORMED BY QC, THE APPROVAL OF THE <br />ENGINEER OF RECORD AND THE BUILDING OFFICIAL OR AUTHORITY HAVING JURISDICTI ION IS REQUIRED. <br />(E) INSPECTION OF WELDING: OBSERVATIONS AND VISUAL INSPECTION OF IN -PROCESS AND COMPLETED WELDS SHALL BETHE <br />PRIMARY METHOD TO CONFIRM THAT THE MATERIALS, PROCEDURES AND WORKMANSHIP ARE IN CONFORMANCE WITH THE <br />CONSTRUCTION DOCUMENTS. ALL PROVISIONS OF AWS D1.101.1 M STRUCTURAL WELDING CODE - STEEL FOR STATICALLY <br />LOADED STRUCTURES SHALL APPLY. <br />(F)NONDESTRUCTIVE TESTING QFWELDED JOINTS: <br />1)PROCEDURES: ULTRASONIC TESTING (UT).MAGNETIC PARTICLE TESTING (K8T).PENETRANT TESTING (PT)AND <br />RADIOGRAPHIC TESTING (RT), WHERE REQUIRED, SHAL.L. BE PERFORMED BY CA IN ACCORDANCE WITH AWS DIA/D1 A fvI. <br />ACCEPTANCE CRITERIA SHALL BE IN ACCORDANCE WITH AWS D1.1/D1.1M FOR STATICALLY LOADED STRUCTURES, UNLESS <br />OTHERWISE DESIGNATED !NTHE APPROVED CONSTRUCTION DOCUMENTS, <br />9) CJP GROOVE WELD NDT: FOR STRUCTURES IN RISK CATEGORY III OR IV BUILDINGS AND OTHER STRUCTURES, UT SHALL BE <br />PERFORMED BY QA ON ALL CJP GROOVE WELDS SUBJECT TO TRANSVERSELY APPLIED TENSION LOADING IN BUTT, T- AND <br />CORNER JOINT G.|NMATERIALS 5/1G|N(8K4K4)THICK 0RGREATER. FOR STRUCTURES |0RISK CATEGORY ||.UTSHALL BE <br />PERFORMED BY QA ON 10% OF CJP GROOVE WELDS IN BUTT, T- AND CORNER JOINTS SUBJECT TO TRANSVERSELY APPLIED <br />TENSION LOADING, }NKvIATER|ALSG/10|N(8&4M)THICK (}RGREATER. <br />3) ACCESS HOLE NDT: THERMALLY CUT SURFACES OF ACCESS HOLES SHALL BE TESTED BY QA USING MT OR PT, WHEN THE <br />FLANGETHICKNESS EXCEEDS 2|N(50K8KX)FOR ROLLED SHAPES, ORWHEN THE WEB THICKNESS EXCEEDS 2|N(50K8K8)FOR <br />BUILT-UP SHAPES. ANY CRACK SHALL BE DEEMED UNACCEPTABLE REGARDLESS OF SIZE OR LOCATION. <br />4)WELDED JOINTS SUBJECTED TOFATIGUE: WHEN REQUIRED 8YAPPENDIX 0.TABLE A-3.1OFTHE A|8CSPECIFICATION, <br />LATEST ADOPTION, WELDED JOINTS REQUIRING WELD SOUNDNESS TO BE ESTABLISHED BY RADIOGRAPHIC OR ULTRASONIC <br />INSPECTION SHALL BETESTED BYgAASPRESCRIBED. REDUCTION |NTHE RATE OFLIT |8PROHIBITED. <br />5) REDUCTION OF RATE OF ULTRASONIC TESTING: THE RATE OF UT IS PERMITTED TO BE REDUCED IF APPROVED BY ENGINEER <br />OF RECORD OR BUILDING OFFICIAL OR AUTHORITY HAVING JURISDICTION. WERE THE INITIAL RATE FOR LIT IS 1 00%, THE NDT <br />RATE FOR AN INDIVIDUAL WELDER OR WELDING OPERATOR IS PERMITTEED TO BE REDUCED TO 25%, PROVIDED THE REJECT <br />RATE, THE NUMBER OF WELDS CONTAINING UNACCEPTABLE DEFECTS DIVIDED BY THE NUMBER OF WELDS COMPLETED, IS <br />DEMONSTRATED TO BE 5% OR LESS OF THE WELDS TESTED FOR THE WELDER OR WELDING OPERATOR. A SAMPLING OF AT <br />LEAST 40 COMPLETED WELDS FOR A JOB SHALL BE MADE FOR SUCH REDUCTION EVALUATION. FOR EVALUATING THE REJECT <br />RATE Or' CONTINUOUS WELDS OVER 3 FT (1 M) IN LENGTH WHERE THE EFFECTIVE THROAT IS1 IN (25 MM) OR LESS, EACH -12 IN <br />(300 MM) INCREMENT OR FRACTION THEREOF SHALL BE CONSIDERED AS ONE WELD. FOR EVALUATING THE REJECT RATE ON <br />CONTINUOUS WELDS OVER 3 FT (1 M) IN LENGTH WHERE THE EFFECTIVE THROAT IS GREATER THAN 'I IN (25 MM), EACH 6 IN <br />(15UM&1)OFLENGTH ORFRACTION THEREOF SHALL BECONSIDERED ONE WELD. <br />6) INCREASE IN RATE OF ULTRASONIC TESTING: FOR STRUCTURES IN RISK CATEGORY 11, WHERE THE INITIAL RATE FOR UT IS <br />10%, THE NDT RATE FOR AN INDIVIDUAL WELDER OR WELDING OPERATOR SHALL BE INCREASED TO 100% SHOULD THE <br />REJECT RATE, THE NUMBER OF WELDS CONTAINING UNACCEPTABLE DEFECTS DIVIDED BY THE NUMBER OF WELDS <br />COMPLETED, EXCEEDS 5% OF THE WELDS TESTED FOR THE WELDER OR WELDING OPERATOR. A SAMPLING OF AT LEEAST20 <br />COMPLETED WELDS FOR A JOB SHALL BE MADE PRIOR TO IMPLEMENTING SUCH AN INCREASE. WHEN THE REJECT RATE FOR <br />THE WELDER OR WELDING OPERATOR, AFTER A SAMPLING OF AT LEAST 40 COMPLETED WELDS, HAS FALLEN TO 5% OR LESS, <br />THE RATE OF LIT SHALL BE RETURNED TO 10%. FOR EVALUATING THE REJECT RATE OF CONTINUOUS WELDS OVER 3 FT (1 M) <br />IN LENGTH WHERE THE EFFECTIVE THROAT IS 1 IN (25MM) OR LESS, EACH 12 IN (300 MM) INCREMENT OR FRACTION THEREOF <br />SHALL BE CONSIDERED AS ONE WELD. FOR EVALUATING -THE REJECT RATE ON CONTINUOUS WELDS OVER 3 FT (1 M) IN <br />LENGTH WHERE THE EFFECTIVE THROAT IS GREATER THAN 1 IN (25 MM), EACH 6 IN (150 MM) OF LENGTH OR FRACTION <br />THEREOF' SHALL ECONSIDERED ONE WELD. <br />7) DOCUMENTATION: ALL NDT PERFORMED SHALL BE DOCUMENTED. FOR SHOP FABRICATION, THE NDT REPORT SHALL <br />IDENTIFY THE TESTED WELD BY PIECE MARK AND LOCATION IN THE PIECE. FOR FIELD WORK, THE NDT REPORT SHALL <br />IDENTIFY THE TESTED WELD BY LOCATION IN THE STRUCTURE, PIECE MARK, AND LOCATION IN THE PIECE. WHEN A WELD IS <br />REJECTED ON THE BASIS OF NDT, THE NDT RECORD SHALL INDICATE THE LOCATION OF THE DEFECT AND THE BASIS OF <br />REJECTION. <br />(G) INSPECTION OF HIGH -STRENGTH BOLTING: OBSERVATION OF BOLTING OPERATIONS SHALL BE THE PRIMARY METHOD USED <br />TO CONFIRM THAT THE MATERIALS, PROCEDURES AND WORKMANSHIP INCORPORATED IN CONSTRUCTION ARE IN <br />CONFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THE PROVISIONS OF THE RCSC SPECIFICATION. <br />1) FOR SNUG -TIGHT JOINTS, PRE -INSTALLATION VERIFICATION TESTING AS SPECIFIED IN "STRUCTURAL STEEL" TABLE BELOW <br />AND MONITORING OF THE INSTALLATION PROCEDURES AS SPECIFIED IN "STRUCTURAL STEEL" TABLE BELOW ARE NOT <br />APPLICABLE. THE QCI AND QAI NEED NOT BE PRESENT DURING THE INSTALLATION OF FASTENERS IN SNUG -TIGHT JOINTS. <br />2) FOR PRETENSIONED JOINTS AND SLIP-CRITICALJOINTS, WHEN THE INSTALLER IS USING THE CALIBRATED WRENCH METHOD <br />ORTHETURN-(}F'NUTK8ETHODVVITHK8ATCHW1ARK|NSTECHN|QUES.THED|RECT-TEN8|ON-|ND|CATORK8ETHOD.ORTHETVV|ST, <br />OFF -TYPE TENSION CONTROL BOLT METHOD, MONITORING OF BOLT PRE -TENSIONING PROCEDURES SHALL BE AS SPECIFIED <br />IN "STRUCTURAL STEEL" TABLE BELOW. THE QC1 AND QA1 NEED NOT BE PRESENT DURING THE INSTALLATION OF FASTENERS <br />WHEN THESE METHODS ARE USED BYTHE INSTALLER. <br />3) FOR PRETENSIONED JOINTS AND SLIP -CRITICAL JOINTS, WHEN THE INSTALLER IS USING THE CALIBRATED WRENCH METHOD <br />ORTURN-OF-NUT METHOD WITHOUT MATCHMARKING, MONITORING OF BOLT PRETENSIONING PROCEDURES SHALL BE AS <br />SPECIFIED IN "STRUCTURAL STEEL" TABLE BELOW. THE QCI AND QA1 NEED NOT BE PRESENT DURING THE INSTALLATION OF <br />FASTENERS WHEN THESE METHODS ARE USED BYTHE INSTALLER. <br />(H) OTHER INSPECTION TASKS: THE FABRICATOR'S QCI SHALL INSPECT THE FABRICATED STEEL TO VERIFY COMPLIANCE WITH <br />THE DETAILS SHOWN ON THE SHOP DRAWINGS, SUCH AS PROPER APPLICATION OF JOINT DETAILS AT EACH CONNECTION. THE <br />ERECTOR'S QCI SHALL. INSPECT THE ERECTED STEEL FRAME TO VERIFY COMPLIANCE WITH THE DETAILS SHOWN ON THE <br />ERECTION DRAWINGS, SUCH AS BRACES, STIFFENERS, MEMBER LOCATIONS AND PROPER APPLICATION OF JOINT DETAILS AT <br />EACH CONNECTION. THE QAI SHALL BE ON THE PREMISES FOR INSPECTION DURING THE PLACEMENT OF ANCHOR RODS AND <br />OTHER EMBEDMENT SUPPORTING STRUCTURAL STEEL FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. AS A <br />MINIMUM, THE DIAMETER, GRADE, TYPE AND LENGTH OF THE ANCHOR ROD OR EMBEDDED ITEM, AND THE EXTEND OR DEPTH <br />Or' EIMBEDNIENT INTO CONCRETE OR MASONRY, SHALL BE VERIFIED PRIOR TO PLACEMENT OF CONCRETE OR GROUT. THE QAI <br />SHALL INSPECT THE FABRICATED STEEL OR ERECTED STEEL FRAME, AS APPROPRIATE, TO VERIFY COMPLIANCE WITH THE <br />DETAILS SHOWN ON THE CONSTRUCTION DOCUMENTS, SUCH AS BRACES, STIFFENERS, MEMBER LOCATIONS AND PROPER <br />APPLICATION OFJOINT DETAILS ATEACH CONNECTION. <br />(1) MINIMUM REQUIREMENTS FOR INSPECTION OF COMPOSITE CONSTRUCTION: INSPECTION OF STRUCTURAL STEEL AND STEEL <br />DECK USED IN COMPOSITE CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE "STRUCTURAL STEEL" TABLE <br />BELOW ANDTHIS SECTION. FOR WELDING OF STEEL HEADED STUD ANCHORS, THE PROVISIONS OF AWS D1.1/1311.11VI, <br />STRUCTURAL WELDING CODE - STEEL, APPLY. FOR WELDING OF STEEL DECK, OBSERVATION OF WELDING OPERATIONS AND <br />VISUAL INSPECTION OF IN -PROCESS AND COMPLETED WELDS SHALL BE THE PRIMARY METHOD TO CONFIRM THAT THE <br />MATERIALS, PROCEDURES AND WORKMANSHIP ARE IN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS. ALL <br />APPLICABLE PROVISIONS OF AWS D'1.301.31M, STRUCTURAL WELDING CODED - SHEET STEEL, SHALL APPLY. DECK WELDING <br />INSPECTION SHALL INCLUDE VERIFICATION OF THE WELDING CONSUNIABLES, WELDING PROCEDURE SPECIFICATIONS AND <br />QUALIFICATIONS OF WELDING PERSONNEL PRIOR TO THE START OF THE WORK, OBSERVATIONS OF THE WORK IN PROGRESS, <br />AND A VISUAL INSPECTION OF ALL COMPLETED WELDS. FOR STEEL DECK ATTACHED BY FASTENING SYSTEMS OTHER THAN <br />WELDING, INSPECTION SHALL INCLUDE VERIFICATION OF THE FASTENERS TO BE USED PRIOR TO THE START OF THE WORK, <br />OBSERVATIONS OF THE WORK IN PROGRESS 1-0 CONFIRM INSTALLATION IN CONFORMANCE WITH THE MANUFACTURER'S <br />RECOMMENDATIONS, AND AVISUAL INSPECTION OFTHE COMPLETED INSTALLATION. <br />3. STEEL CONSTRUCTION OTMER THAN STRUCTURAL STEEL: SPECIAL INSPECTION FOR STEEL CONSTRUCTION OTHER THAN <br />STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE "STEEL (OTHER THAN STRUCTURAL)" SECTION AND THIS SECTION. <br />WELDING INSPECTION AND WELDING INSPECTOR QUALIFICATION' FOR COLD-TFORMED STEEL FLOOR AND ROOF DECKS SHALL <br />BE}NACCORDANCE WITH /0WSD1.3. <br />WELDING INSPECTION AND WELDING INSPECTOR QUALIFICATION FOR REINFORCING STEEL SHALL BE IN ACCORDANCE WITH <br />A\NSD14AND AC|3i8. <br />4. NONCONFORMING MATERIAL AND WORKMANS'HIP: IDENTIFICATION AND REJECTION OF MATERAIL OR WORKMANSHIP THAT 13 <br />NOT IN COINFORMANCE WITH THE CONSTRUCTION DOCUMENTS SHALL BE PERMITTED AT ANY TIME DURING THE PROGRESS <br />OF THE WORK. HOWEVER, THIS PROVISION SHALL NOT RELIEVE THE OWNER OR THE INSPECTOR OF THE OBLIGATION FOR <br />TWO Y, IN -SEQUENCE INSPECTIONS. NONCONFORMING MATERAIL AND WORKMANSHIP SHALL BE BROUGFIT TO THE <br />IMMEDIATE ATTENTION Or' THE FABRICATOR C}RERECTOR, ASAPPLICABLE. <br />N ON'C'ON FORM ING MATERIAL OR WORKMANSHIP SHALL BE BROUGHT INTO CONFORMANCE OR MADE SUITABLE FOR ITS <br />INTENDED PURPOSE ASDETERMINED BYTHE ENGINEER OFRECORD. <br />CONCURREWTVV|THTHEGUBK8|TTAL0F3UCHREPORTGTOTHEBU|LD|NGDFF|C|ALOHAUTHOR|TYHAV|NGJUR|SD!CT|ON. <br />ENGINEER OF RECORD OR OWNER, THE OA AGENCY SHALL SUBMIT TO THE FABRICATOR AND ERECTOR: (1) <br />NONCONFORMANCE REPORTS, (2) REPORTS OF REPAIR, REPLACEMENT OR ACCEPTANCE OF NONCONFORMING ITEMS. <br />5. SEE PLAN SHEETS FOR LOCATIONS REQUIRING SEISMIC SPECIAL INSPECTIONS. <br />VERIFICATION AND INSPECTION TASK <br />1. WELDS: <br />(A) FILLET WELDS: <br />ONAPERIODIC BASIS, VISUALLY INSPECT 1OOY6OFALL FILLET WELDS 5/18^0RLESS. <br />ON A CONTINOUS BASIS, INSPECT WELDING PROCESS FOR ALL MULTI -PASS FILLET WELDS AND SINGLE PASS FILLET <br />WELDS GREATER THAN 5/18 INCH. <br />(B) PARTIAL PENETRATION AND FULL PENETRATION WELDS: <br />ON A CONTINUOUS BASIS, INSPECT WELDING PROCESS FOR ALL GROOVE WELDS PER AWS D1A. <br />TEST 100%OFALL WELDS EXCEEDING 5/10INCH, USING UTPER AVVSD1A. <br />TE8T259&OFALL WELDS LESS THAN 3/1G INCH, USING K8PTPER A8TK4 E-iOS' PERFORMED ON ROOT PASS AND ON <br />FINISH WELD. FOR ELEMENTS OF THE SEISMIC FORCE RESISTING SYSTEM (SFRS), THE FOLLOWING ADDITIONAL <br />REQUIREMENTS APPLY: MAGNETIC PARTICLE TESTING SHALL BEPERFORMED ON25960FALL BEAI\11-TO-COLU&8N <br />CJP GROOVE WELDS. WHERE WELD TABS HAVE BEEN REMOVED PERFORM MAGNETIC PART!CAL TESTING AT THE <br />END OFWELDS. <br />FOR ELEMENTS OF THE SEISMIC FORCE RESISTING SYSTEM (SFRS), THE FOLLOWING ADDITIONAL REQUIREMENTS <br />APPLY: MAGNETIC PARTICLE TESTING SHALL BE PERFORMED ON 25% OF ALL BEAM -TO -COLUMN CJP GROOVE <br />(C) STUD SHEAR CONNECTOR WELDS: <br />VISUALLY |NSPECT1OOY6DFINSTALLED STUDS FOR 380»FLASH. TEST ALL QUESTIONABLE STUDS, NOTSHOYV|N8 <br />FULL 3600 FLASH BY BENDING STUDS TO 150 FROM VERTICAL, AWAY FROIVI WELD DISCONTINUITY, PER AWS D1.1. <br />RANDOMLY TEST ALL OTHER STUDS BY8EN|DNB15»FROM VERTICAL ASNOTED THUS: <br />i5%()FSTUDS WELDED THRU DECK <br />5% OF STUDS WELDED TO BARE STEEL <br />ALTERNATIVELY, SOUND 100% OF INSTALLED STUDS, FOR FULL PENETRATION WELD, USING AN 8 LB. MAUL. TEST <br />QUESTIONABLE STUDS AGNOTED ABOVE. <br />(D)STEEL JOIST AND JOIST GIRDER WELDS: <br />PROVIDE TESTING AND INSPECTION FOR FIELD WELDS PREVIOUSLY DESCRIBED. <br />(E) METAL DECK WELDS: - X <br />ONAPERIODIC BASIS, VISUALLY INSPECT SIZE, LOCAT|ON, LENGTHANDBURN THRU FOR 1OO9tOF PUDDLE WELDS <br />AND TOP SEAM WELDS ONMETAL DECK DESIGNED ASASTRUCTURAL ELEMENT, PER AWSD1�3. <br />(F) WELDING OFREINFORCING BARS: <br />PR|[)RTOYVELD!NG.VE�iFYVVEL�AB�L|TY{)FRE|NFORCiN�STEELOTHER THAN ASTMA7OG.VERIFY PROPER JOINT <br />PERPARAT|ON|BPROVIDED AND PROPER ELECTRODES ARE USED AND PROPERLY STORED AND DRIED. <br />ONACONTINUOUS BASIS, VISUALLY INSPECT 100% OF ALL REINFORCING BAR WELDS A8THE WELDING IS � | <br />(G)k-AJlEATESTING (FOR ELEMENTS OFTHE SEISMIC FORCE RESISTING SYSTEM (SFR5)): <br />WHERE WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PEROFORMED IN THE K- <br />AREA,THEVVEBSHALLBETESTEDFDRCRACKSVG|NGK8A3NET|CPART|CLETEST|NG.|NCLUDETHEBADEK8ETAL <br />WITHIN 3IN OF THE K-AREA. PERFORM TEST NO SOONER THAN 48 HOURS FOLLOWING THE COMPLETION OF <br />WELDING- <br />(H) BASE METAL -TESTING FOR LAMELLAR TEARING AND LAMINATIONS (FOR ELEMENTS OF THE SEISMIC FORCE <br />RESISTING SYSTEM (8FRS): <br />FOR BASE METAL THICKNER THAN 1 1/2" LOADED IN TENSION IN THE THROUGH -THICKNESS DIRECTION IN TEE AND <br />C0RNERJU!NTS.VVHERETHECONNE�TEDKJATER|AL|8GREATER THAN 3/4iNAND CONTAINS CJPGROOVE WELDS, <br />BEAM COPE AND ACCESS HOLE TESTING (FOR ELEMENTS OF THE SEISMIC FORCE RESISTING SYSTEM (SFRS): <br />AT WELDED SPLICES AND CONNECTIONS, THERMALLY CUT SURFACES OF BEAM COPES AND ACCESS HOLES SHALL <br />BE TESTED USING MAGNETIC PARTICLE TESTING OR PENETRANT TESTING, WHEN THE FLANGE THICKNESS <br />EXCEEDS 1 112 IN FOR ROLLED SHAPES, OR WHEN THE WEB THICKNESS EXCEEDS 1 1/2 IN FOR BUILT-UP SHAPES. <br />(J) REDUCED BEAM SECTION REPAIR TESTING (FOR ELEMENTS OF THE SEI&VIIC FORCE RESISTING SYSTEM R0 <br />TIC LE TESTING SHALL BE PERFORMED ON ANY WELD AND ADJACENT AREA OF THE REDUCED BEAM <br />SECTION (RBS) CUT SURFACE THAT HAS BEEN REPAIRED BY WELDING, OR ON -THE BASE METAL OF THE RBS CUT <br />SURFACE IF A SHARP NOTCH HAS BEEN REMOVED BY GRINDING. <br />2INSPECTION TASKS PRIOR TO WELDING: (A) WELDING PROCEDURE SPECIFICATIONS (11\IPS,q) AVAILABLE, (B) <br />-_ <br />X <br />MANUFACTURER C­RTIFICATIONS FOR WELDING CON SUMABLESAVAILABLE <br />(C) MATERIAL IDENTI F1 CATION (TYPE/GRADE), (D) WELDER IDENTIFICATION SYSTEM', (E) FIT -UP OF GROOVE WELDS <br />(INCLUDING JOINT GEOMETRY): 1) JOINT PREPARATION, 2) DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, <br />BEVEL), 3) CLEANLINESS (CONDITION OF STEEL SURFACES), 4) TACKING (TACK WELD QUALITY AND LOCATION), 5) <br />X <br />__ <br />BACKING -TYPE AND FIT (WHERE APPLICABLE), (F) CONFIGURATION AND FINISH OF ACCESS HOLES, (G) FIT -UP OF <br />FILLET WELDS: 1) DIMENSIONS (ALIGNMENT, GAPS AT ROOT), 2) CLEANLINESS (CONDITION OF STEEL SURFACES), 3) <br />TACKING (TACK WELD QUALITY AND LOCATION) <br />I <br />3. INSPECTION -TASKS DURING WELDING: (A) USE OF QUALIFIED WELDIERS, (B) CONTROL AND HAN. LING OF WELDING <br />CONSUMABLE& 1) PACKAGING, 2) EXPOSURE CONTROL, (C) NO WELDING OVER CRACKED TACK WELDS, (D) <br />ENVIRONMENTAL CONDITIONS: 1) WIND SPEED WITHIN LIMITS, 2) PRECIPITATION AND TEMPERATURE, (E) V'vPS <br />FOLLOWED: 1) SETTINGS ON WELDING EQUIPMENT, 2) TRAVEL SPEED, 3) SELECTED WELDING MATERIALS, 4) <br />X <br />-_ <br />SHIELDING GAS TYPE/FLOW RATE, 5) PREHEAT APPLIED: INTERPASS TEMPERATURE MAINTAINED (MIN/iVIAX), <br />PROPER POSITION (F, V, H, OH), 6) INTERPASS TEMPERATURE MAINTAINED (MIN/MAX), 7) PROPER POSITION (F, V, H, <br />OH), (F) WELDING TECHNIQUES: 1) INTERPASS AND FINAL CLEANING, 2) EACH PASS WITHIN PROFILE LIMITATIONS, 3) <br />EACH PASS MEETS QUALITY REQUIREMENTS <br />4, INSPECTION TASKS AFTER WELDING: (A) WIELDS CLEANED -_ <br />X <br />__ <br />�-B)SIi-E,-LENGTH, AND LOCATION OF WELDS, (C) WELDS MEET VISUAL ACCEPTANCE-C-RITERIA: 1) CRACK <br />PROHIBITION, 2) WELDIBASE-METAL FUSION, 3) CRATER CROSS SECTION, 4) WELD PROFILES, 5) WELD SIZE, 6) <br />T__X <br />UNDERCUT, 7) POROSITY, (D) ARC STRIKES, (E) K-AREA d , (F) BACKING REMOVED AND WELD TABS REMOVED (IF <br />REQUIRED), (G) REPAIR ACTIVITIES, E. DOCUMENT ACCEPTANCE OR REJECTION Or- WELDED JOINT OR MEIMBER <br />5, INSPECTION TASKS PRIOR TO BOLTING: (A) MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER <br />xa <br />xb <br />(B) FASTENERS MARKED IN ACCE WITH ASTM REQUIREMENTS, (C) PROPER FASTENERS SELECTED FOR THE <br />JOINT DETAIL. (GRADE, TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM SHEAR PLANE), (D) PROPER <br />BOLTING PROCEDURE SELECTED FOR JOINT DETAIL, (E) CONNECTING ELENIENTS, INCLUDING THE APPROPRIATE <br />1z <br />FAYING SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS, (F) <br />PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER FASTENER COMPONENTS <br />I <br />(G) PRE -INSTALLATION VERIFICATION TESTING BY INST ALLATION PERSONNEL OBSERVED AND DOCUMENTED FOR <br />Xb <br />Xa <br />6. INSPECTIONTASKS DURING BOLTING: (A) FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES <br />AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED, (B) JOINT BROUGHT TO THE SNILIG-TIGHT CONDITION <br />- IT,1"\, <br />PRIOR TO THE PRETENSIONING OPERATION, (C) FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED <br />X <br />-- <br />FROM ROTATING, (D) FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION, <br />PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE EDGES <br />____ <br />L. INSPECTION TASKS AFTER BOLTING: DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTION' S <br />,X <br />& INSPECTION OF STEEL ELEMENTS OF COMPOSITE CONSTRUCTION PRIOR TO CONCRETE PLACEMENT: (A) <br />-_ <br />PLACEMENT AND INSTALLATION OF STEEL DECK, (B) PLACEMENT AND INSTALLATION OF STEEL HEADED STUDT1x <br />uQUALITY CONTROL (QC)ONLY <br />bQUALITY ASSURANCE (IA)ONLY <br />c THE ERECTOR SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED. <br />STAMPS, |FUSED, SHALL BETHE LOW -STRESS TYPE. <br />d WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PREFORMED IN THE K-AREA, VISUALLY INSPECT THE WEV K-AREA FOR CRACKS WITH 3 IN. OF THE WELD. <br />� ��� 763�59.9100 <br />'2000Berkshire Lana m.Suite 200 wvvw,aaeng.cnm <br />WA Firm Registration No. 3035 <br />RM <br />6617ASSOCIATED BiVD <br />BUILDING B.SUITE 1O0 <br />EVERETT, WA 98203 <br />11 <br />11 <br />11 <br />11 <br />0 <br />�� <br />&�=� <br />�� <br />�� <br />Br-� <br />�� <br />~ <br />�� <br />�� <br />00 <br />C� <br />~�=m <br />=" <br />' <br />00 <br />-_ <br />�&� <br />�� <br />�� <br />��* <br />��� <br />�� <br />�� <br />��� <br />v�� <br />�� <br />� <br />�� <br />�� <br />�� <br />�� <br />�� <br />�� <br />= <br />(f) <br />~°�� <br />�� <br />w=,� <br />= <br />.� <br />(1) <br />�� <br />v�� <br />� <br />� <br />-- <br />~ <br />(�� � <br />�� <br />�� <br />� <br />�8 <br />� <br />'l,�",'�_11- -,,._,_ <br />"_''_�'� �­ �­ <br />- <br />__,� " �- -',� <br />,',�, ­1 - <br />�,�; "___­­__'_1 <br />�� , <br />1-1 I 1,11 <br />,_ <br />I '. . <br />I i <br />� <br />JOB NUMBER <br />205013 <br />DRAWN BY CHECKED AY <br />AAD RRP/BMS <br />SHEET TITLE <br />SHEET NUMBER <br />SO-03 <br />