My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
426 E CASINO RD 2020 Plans 2022-10-24
>
Address Records
>
E CASINO RD
>
426
>
Plans
>
426 E CASINO RD 2020 Plans 2022-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2022 9:12:07 AM
Creation date
10/24/2022 9:09:21 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
426
Permit
B2002-007
Year
2020
Notes
INSTALL NEW SATELLITE AND ASSOCIATED CRADLE ON ROOF OF EXTG
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUILDING CODE <br />2015 INTERNATIONAL BUILDING CODE <br />FLOOR LOAD <br />DEAD LOAD 60 psf <br />LIVE LOAD: 100 psf (ASSUMED) <br />ROOF LOAD <br />DEAD LOAD: 60 psf <br />FLAT ROOF SNOW LOAD: 25 psf <br />SNOW EXPOSURE FACTOR (Ce): 1.1 <br />SNOW LOAD IMPORTANCE FACTOR (Is): 1.0 <br />THERMAL FACTOR (Ct): 1.1 <br />WIND DESIGN DATA <br />1. BASIC WIND SPEED: 110 MPH <br />2. WIND IMPORTANCE FACTOR (1w): 1.0 <br />BUILDING CATEGORY: II <br />3. WIND EXPOSURE: B <br />4. Kzt e 1.0 <br />5. INTERNAL PRESSURE COEFFICIENT: NA <br />6. APPLICABLE WIND PRESSURE FOR <br />COMPONENTS AND CLADDING: NA <br />7. WIND LOADING PER ANTENNA TECHNOLOGY COMMUNICATION SPECS. FOR 110 <br />MPH WIND VELOCITY x 2.0 F.S. <br />8. WIND LOADS VERIFIED PER ASCE7-10 29.7.1 <br />9. SERVICE LOADS PER ANTENNA TECHNOLOGY COMMUNICATION SPECS. FOR 110 <br />MPH WIND VELOCITY x 1.0 F.S. <br />SESIMIC DESIGN DATA <br />1. SEISMIC IMPORTANCE FACTOR: 1.0 <br />SEISMIC USE GROUP: 1 <br />2. SPECTRAL RESPONSE ACCELERATION (Ss): 142.0% G <br />3. SITE CLASS: D (ASSUMED) <br />4. SPECTRAL RESPONSE COEFFICIENTS (SDS): 94.5%G <br />5. SEISMIC DESIGN CATEGORY: D <br />6. BASIC SEISMIC -FORCE -RESISTING SYSTEM FOR COMMUNICATION EQUIPMENT <br />7. COMPONENT APPLIFICATION FACTOR: 1.0 <br />8. COMPONENT RESPONSE MODIFICATION FACTOR: 2.5 <br />7. DESIGN BASE SHEAR: SEE CALCULATIONS <br />10. ANALYSIS PROCEDURE USED: SEISMIC DEMAND ON 'NONSTRUCTURAL <br />COMPONENTS' <br />SPECIAL INSPECTIONS <br />SPECIAL INSPECTIONS SHALL BE CONDUCTED IN ACCORDANCE WITH THE 2015 <br />IBC, CHAPTER 17. SPECIAL INSPECTION SHALL BE PROVIDED FOR: <br />- STRUCTURAL WELDING (STEEL 1705.2) <br />- HIGH STRENGTH BOLTING (STEEL 1705.2.1) (AISC 360) <br />- OTHER INSPECTIONS AS REQUIRED BY THE DESIGN PROFESSIONAL OR <br />BUILDING OFFICIAL (1705.1.1) <br />- FIELD WELDING <br />- CONT. SPECIAL INSPECTION FOR POST INSTALLED ANCHORS <br />STRUCTURAL STEEL <br />1. ALL STRUCTURAL AND MISCELLANEOUS STEEL SHALL CONFORM TO ASTM <br />A36 AND SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE <br />AISC 'SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS99, LATEST EDITION. <br />SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL PRIOR TO <br />FABRICATION. <br />2. PIPE COLUMNS SHALL CONFORM TO ASTM A53, GRADE B, UNLESS <br />OTHERWISE NOTED ON PLANS. <br />3. LISS STEEL TUBES SHALL CONFORM TO ASTM A500, GRADE B (Fy =46 KSI) <br />UNLESS OTHERWISE NOTED ON PLANS. <br />4. STEEL W-SECTIONS SHALL CONFORM TO ASTM A992 (fy®50 KSI) UNLESS <br />OTHERWISE NOTED ON THE PLANS. <br />6. NO ATTEMPT * BEEN MADE <br />TO <br />DIFFERENTIATE BETWEEN <br />- . <br />SPECIFICATIONS._IELD WELDED CONNECTIONS. ALL WELDING IS TO COMPLY WITH AWS <br />AND IS TO BE DONE BY THE WASHINGTON ASSOCIATION <br />iUILDING OFFICIALS (WABO) CERTIFIED WELDERS. ALL WELDING IS TO BE DONI <br />I'Y ELECTRIC .r PROCESS r SHALL PERFORMED WITH • r 0 <br />,.r. <br />c-LECT <br />r• -S AS REQUIRED CODE. <br />7. SPECIAL INSPECTION IS REQUIRED FOR ALL FIELD WELDS. <br />S. ARCHITECTURAL PLANS ARE PART OF THE STRUCTURAL DESIGN DRAWINGS <br />AND ARE TO BE USED TO DEFINE DETAIL CONFIGURATIONS INCLUDING, BUT <br />NOT LIMITED TO, RELATIVE LOCATIONS AND ELEVATIONS OF ALL MEMBERS, <br />ELEVATIONS LOCATION OF ALL OPENINGS, ETC. THE ARCHITECTURAL PLANS <br />MUST BE USED IN THE DEVELOPMENT OF SHOP DRAWINGS. <br />9. REFER TO ARCHITECTURAL DRAWINGS FOR MISCELLANEOUS STEEL SHOWN <br />OR NOTED ON THE DRAWINGS AS TO LOCATION FOR WHICH THE EXTENT IS <br />NOT CLEAR. <br />lummoolvilol MA I I k El kv� Lei Nffim� WIN <br />11. ALL STRUCTURAL STEEL, HARDWARE, AND MISC. STEEL EXPOSED TO <br />EARTH OR WEATHER SHALL BE HOT DIPPED GALVANIZED PER ASTM A123 <br />UNLESS OTHERWISE NOTED. DAMAGED GALVANIZED COATINGS AND STEEL <br />DESIGATED FOR ZINC PRIMING SHALL BE PROTECTED WITH A ZINC RICH <br />PRIMER AND TOP COAT PER SSPC-PS SPECIFICATIONS. STEEL SHALL BE <br />CLEANED PRIOR TO PRIMING. THE PRIMER SHALL BE CLASSIFIED AS <br />INORGANIC WITH A 92-95% METALLIC ZINC IN DRY FILM. THE PRIMER SHALL <br />BE APPLIED IN A CONTROLLED DRY ENVIRONMENT AND MAY CONSIST OF <br />BRUSH OR SRAY COATING WITH A DRY FLIM THICKNESS BETWEEN 2.5-3.5 <br />MILS. AN OUTER PROTECTIVE PAINT LAYER SHALL BE APPLIED OVER THE <br />PRIMER. THE PRIMER AND TOP COAT(S) SHALL BE FULLY CURED PRIOR TO <br />ERRECTION. THE OUTER COATING SHALL BE INSPECTED UPON ERRECTION <br />ON -SITE. ANY DAMAGE TO THE ZINC -RICH PAINT PRIMER SHALL BE SPOT <br />COVERED ON -SITE. <br />12. PROVIDE SHOP DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO <br />FABRICATION. <br />13. IF THE STEEL FABRICATOR'S SHOP DRAWINGS DIFFER FROM THE DESIGN <br />DRAWINGS APPROVED BY THE BUILDING OFFICIAL, REDESIGN DRAWINGS <br />BEARING THE SEAL AND SIGNATURE OF THE PROJECT STRUCTURAL ENGINEER <br />SHALL BE SUBMITTED ALONG WITH THE SHOP DRAWINGS TO BUILDING <br />OFFICIAL FOR APPROVAL. <br />GENERAL_ <br />1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE CONTRACT <br />DRAWINGS. <br />2. DURING, CONSTRUCTION PERIOD • ' A • T <br />RESPONSIBLE FOR THE SAFETY OF THE BUILDING. THE CONTRACTOR SHALL <br />PROVIDE ADEQUATE SHORING, BRACING AND GUYS IN ACCORDANCE WITH ALL <br />NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. ANY DEVIATION MUST BE <br />APPROVED PRIOR TO <br />r•• ERECTION. <br />* � ,err• i r � _ * •• •• • - r • .. <br />4 CONTRACTOR SHALL BE SOLELY RESPONSIBLE • -•, <br />PROCEDURES•SHORINGADJACENT <br />PROPERTY,, STRUCTURES, STREETS i UTILITIES IN ACCORDANCE <br />NATIONAL, STATE AND LOCAL SAFETYORDINANCES. <br />SHALL5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK <br />OF ALL TRADES AND SHALL CHECK ALL DIMENSIONS. ALL DISCREPANCIES <br />BE ` i TO THE ATTENTION OF THE ENGINEER AND BE RESOLVED <br />WORK.BEFORE PROCEEDING WITH THE <br />6. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. <br />WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR <br />CHARACTER <br />r TO <br />DETAILS SHOWN, SIMILAR DETAILS • - CONSTRUCTION SHALL <br />!�E USED SUBJECT TO REVIEW BY THE ENGINEER. <br />ELECTRICAL8. CONTRACTOR SHALL COORDINATE WITH MECHANICAL, PLUMBING, AND <br />DRAWINGS FORAND LOCATION OF ALL OPENINGS REQUIRED <br />FOR DUCTS,' • i r OTHER <br />TO BE rrCONCRETE OTHERWISE INCORPORATED IN <br />STRUCTURAL <br />, WORK. ALL OPENINGS IN <br />STRUCTURAL <br />R •r SHALL VERIFIED <br />BY _ __ ENGINEER. <br />10. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING <br />CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE <br />GUARANTEE OF ACCURACY. <br />r, WHERE ACTUAL <br />, CONDITIONS CONFLICT <br />DRAWINGS, THEY SHALL BE REPORTED TO THE ENGINEER SO THAT <br />REVISIONS MADE. •r • DETAILS <br />CONSTRUCTION SHALL NOT B MADE WITHOUT PRIOR WRITTEN APPROVAL • <br />THE ENGINEER. I <br />INCLUDING; <br />11. ARCHITECTURAL AND MECHANICAL PLANS ARE CONSIDERED A PART OF <br />THE STRUCTURAL DESIGN DRAWINGS AND ARE TO BE USED TO DEFINE DETAIL <br />CONFIGURATIONS NOT r TO RELATIVE LOCATIONOF <br />MEMBERS, ELEVATIONS, DIMENSIONS AND LOCATIONS OF ALL OPENINGS, ETC. <br />12. MECHANICAL EQUIPMENT MUST BE FIRMLY ATTACHED TO THE STRUCTURE. <br />ISOLATORS, FASTENERS AND ANY OTHER ELEMENTS PROVIDING STABILITY FOR <br />MECHANICAL EQUIPMENT MUST BE APPROVED BY THE ICBO OR AN <br />EQUIVALENT TESTING PROCEDURE APPROVED BY THE BUILDING DEPARTMENT <br />AND ENGINEER AND MUST BE `P*•LE OF TRANSMITTING CODE <br />LOADS •* 0 OPERATING <br />rrA OF <br />EQUIPMENT. <br />m <br />v N If <br />C) <br />o <br />� <br />Ln <br />C\1 <br />t� <br />Lu® <br />E <br />O <br />o <br />Lu <br />U <br />o <br />O <br />M <br />L <br />V <br />Ln <br />O <br />O O <br />O O O <br />N C\] N <br />0I o <br />o� <br />Lu _z <br />Fz _� <br />® r, <br />� cv <br />Lu <br />O <br />� <br />Lnuu <br />Lu <br />Lu <br />Lu <br />> <br />o <br />ER 2 12 P <br />Drawn By: JIB <br />Checked By: CCC <br />Date: 02-1 7-2020 <br />5DA JOB NO. <br />890113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.