My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 SE EVERETT MALL WAY 2020 7 ELEVEN Plans 2022-10-24
>
Address Records
>
SE EVERETT MALL WAY
>
607
>
7 ELEVEN
>
Plans
>
607 SE EVERETT MALL WAY 2020 7 ELEVEN Plans 2022-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2022 11:20:51 AM
Creation date
10/24/2022 10:23:53 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
607
Tenant Name
7 ELEVEN
Permit
B2008-029
Year
2020
Notes
CREATE RETAIL SPACES IN THE FORMER CONVENIENCE STORE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TILE START POINT <br />s <br />N <br />Da <br />3 <br />\ 15 <br />A7.0 DOOR <br />THRESHOLD <br />G.C. TO INSTALL CUT <br />FLOOR TILE ALONG <br />ENTRANCE WALL. <br />11015 1 <br />-4 <br />33% <br />OFFSET <br />15 DOOR <br />A7.0 THRESHOLD <br />NO <br />DOOR 15 <br />THRESHOLD A7.0 <br />1*1 <br />KEY NOTES <br />1, NOT USED. ' Z <br />2. TILE TO BE INSTALLED UP TO EDGE OF MOP SINK. <br />3. THRESHOLD TO BE SET IN FULL BED OF MASTIC. <br />4. FLOOR SINK/DRAIN PER PLAN, REFERENCE DETAILS ON SHEET A7.0 & PLUMBING DRAWINGS <br />FOR LOCATION. <br />5. CONTRACTOR TO CUT TILE STRAIGHT AND TRUE, NOT LESS THAN 1/2 A TILE. <br />6. NOT USED. <br />7. NOT USED. <br />6. NOT USED. <br />9. NOT USED. <br />10. 3" (33%) OFFSET RUNNING BOND PORCELAIN TILE FLOOR PER MATERIAL SCHEDULE ON A6.1. <br />24" EDGE OF TILE TO RUN PARALLEL WITH ENTRY STOREFRONT, BEGIN FULL SIZE TILE AT <br />EDGE OF ENTRY THRESHOLD. <br />11. IF TILE IS USE - CONTRACTOR SHALL PREP THE EXISTING SUBFLOOR AND INSTALL <br />SCHLUTER - DITRA (OR EQUAL) POLYETHYLENE (CLEAVAGE) MEMBRANE PER <br />MANUFACTURERS INSTALLATION INSTRUCTIONS. <br />OFFICE <br />1®3 <br />T-3 <br />(FLOOR TILE) <br />NOTE. <br />0 <br />GENERAL NOTES <br />1. ALL INTERIOR FINISHES TO BE CLASS 2 OR SETTER. <br />2. CONTRACTOR TO FLOAT AND SCRAPE FLOOR TO BE LEVEL ARID PREPARE FOR NEW <br />SCHEDULED FINISH, AS REQUIRED. <br />3. CONTRACTOR TO RESERVE SPECIFIED FLOORING ARID SASE UPON BEING AWARDED THE <br />BID TO ENSURE AVAILABILITY AND -TIMELY INSTALLATION. SUBSTITUTIONS ARE NOT <br />PERMITTED. <br />4. FLOORS IN WET AREAS TO SLOPE TO DRAINS 1/6" PER FOOT, TYP. <br />5. PROVIDE A BEAD OF CAULK AT INTERIOR CONDITIONS PER OWNER DIRECTION AND <br />PROJECT NEEDS, CAULK IS TO MATCH COLOR OF ADJACENT MATERIAL. <br />6. REFERENCE INTERIOR ELEVATIONS FOR WALL FINISHES. <br />7. REFERENCE SHEET A6.1 FOR BASE TYPES. <br />6. FIDE EXTINGUISHER: #10 CLASS ABC WITH UL RATING 4A-60BC. SURFACE MOUNTED ON <br />WALL WITH MANUFACTURERS ALL STEEL WALL BRACKET. JL INDUSTRIES INC. (COSMIC 1 OE) <br />OR APPROVED EQUAL WITH INSPECTION TAG AS REQUIRED BY LOCAL CODES. <br />9. CONTRACTOR TO INSTALL 7-ELEVEN PROVIDED COAT HOOKS FOR EMPLOYEES. REFERENCE <br />SHEET EFI ITEM 220. INSTALL 2 IN OFFICE AND 3 IN BACKROOM. LOCATION TO BE <br />DETERMINED BY CONSTRUCTION PROJECT MANAGER. SEE DOOR HARDWARE SCHEDULES. <br />I 10. APPLY 3M SUN CONTROL WINDOW FILMS @ ALL SOUTH, EAST, AND WEST FACING GLASS <br />(3M-1). NOTE NO FILM SHOULD BE APPLIED TO THE STOREFRONT DOORS. (REFERENCE <br />SHEET A6.1 FOR MATERIALS SCHEDULE). <br />11. G.C. TO FURNISH AND INSTALL RIS BACKBOARD AT ISP DESK. REFERENCE MATERIALS <br />SCHEDULE ON SHEET A6.1. <br />12. PROTECT SURROUNDING AREAS AND SURFACES FROM DUST, CONTACT WITH OVERSPRAY <br />FROM DENSIFIER, PROTECTIVE SURFACE TREATMENT, & JOINT FILLER. CLEAN SURFACES <br />FROM DUST, DEBRIS, OIL, GREASE, CURING AGENTS, AND OTHER SURFACE CONTAMINANTS <br />THAT MAY ADVERSELY AFFECT INSTALLATION OF POLISHED CONCRETE. <br />13.. REFERENCE. SPECIFICATION SECTIONS 033000 CAST -IN -PLACE CONCRETE AND 033536 <br />POLISHED CONCRETE FLOOR FINISH DATED 02-26-2016, PROVIDED BY 7-ELEVEN, FOR ALL <br />NEW INTERIOR CONCRETE FLOORS. <br />Corporate Office: <br />3025 Highland Parkway, Suite E50 <br />Downers Grove, IL 60515 <br />Phone: 312.756.7778 <br />info@sevansolutions.com www.sevansolutions.com <br />Regional Office: <br />37704 dills Tech Drive <br />Farmington Hills, MI4 331 <br />INTEGRITY I RESPECT I TEAMWORK I EXCELLENCE I CHARITY I <br />0 REVISIONS <br />NO. DATE DESCRIPTION <br />1 11/04/2) OWNER/PEER REVIEW COMMENTS <br />I CONSULTANT II <br />SEAL <br />7862 <br />aka <br />IVT <br />H I i E <br />R DE 1P is <br />I CUSTOMER II <br />I PROJECT DESCRIPTION I <br />I PROJECT LOCATION <br />607 SE EVERETT MALL <br />WAY <br />En <br />SHEET TITLE <br />SHEET MANAGEMENT <br />PROJECT NO.: 41564 <br />DATE ISSUED: 08-03-20 <br />DRAWN BY: RS/0A <br />REVIEWED BY: JI</JD <br />THIS DOCUMENT IS AND SHALL REMAIN THE PROPERTY OF <br />SEVAN DESIGN SOLUTIONS, P.C. <br />REPRODUCTION OR ALTERATION OF THIS DOCUMENT WITHOUT THE EXPRESSE <br />WRITTEN PERMISSION OF SEVAN DESIGN SOLUTIONS, P.C. IS PROHIBITED. <br />(NOT PUBLISHED: AIL RIGHTS RESERVED.) <br />COPYRIGHT BY SEVAN DESIGN SOLUTIONS, P.C. 2020 <br />SHEET NUMBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.