Laserfiche WebLink
111 <br />-541 ©011 <br />vo <br />�aq a <br />SI , 1. a 1 1 4a i e I <br />6e.MEMBNE ! I ! I I I I <br />9�ROOF <br />TOP OF PLATE <br />I 1 I I I <br />i , a <br />I I I I I I <br />a I <br />_ _ ... I777 <br />_ <br />EXISTIN6 METAL <br />BUILPIN6 ROOF <br />10EILIN6 EXI5T . HALL TO <br />HEAD g X I 5T I N6 ST LREN <br />q <br />l <br />5i t®���JM� DENT TO 8 f :j} i� �� d <br />CANOPY III I(j f E ! OR <br />r ' <br />t r r 1 � �� � � <br />CONST. TO <br />5. CURTAIN <br />--ReMOVE EXI�I t REMAIN <br />FkTE04 OR P1 ALL,` I <br />HALL �NO AND ���;i ;III i # ISii <br />- - ul EXIST, IS`P�_ <br />I I �NSi�TI i i PW FLOOR 5LAB <br />cr- <br />'E SEW� <br />-- — - <br />-- -- -- —�i <br />— ---- -- <br />—O�QT. 0 - - - - - -- --- <br />1. COWRETE <br />qo FOOTIN6 FOUNDATION RE40X�ST�N� ��,1 <br />q IN EXI5TING (ON5T U(TION <br />10. PERIMETER CON5TRU6TION TO REMAIN <br />I N5ULATI ON <br />BUILDIN6 SEGTION <br />ALE . 1 J " 1'-0" <br />I <br />8 o EXTTER I OR <br />HALL <br />2,5IDE L <br />01 -011 <br />e <br />-O� <br />TOP OF 5CA <br />q. FOOT IN6 <br />DRAIN / <br />14. 01 A60NAL <br />BRA(, <br />1, CONCRETE <br />FLOOR <br />1. CONCRETE <br />FOUNDATION <br />10. PERIMETER <br />IN5ULATION <br />221-411 <br />ss R A <br />PEE <br />W-114ar ��� <br />01 -0 II <br />A ; 0 5 <br />i � B <br />NEN GUTTER <br />A55EMBLY <br />i I A5, <br />� I <br />EX 1ST I N6 STEEL <br />BENT TO REMAIN <br />EXTERIOR HALL, <br />CANOPY AND ROOF <br />CONSTRUCTION <br />MOVEI U <br />EXI5TIN6 <br />EXI5TIN6 C®N5 UGTION <br />(,ON5TRU6TION,,TO REMAIN <br />SCALE. 1 /6 11 0 1`-0" <br />Q <br />I-->j <br />Lv«-j <br />C1) <br />SEGTION NOTES <br />I CONGRETE FOUNVATION- x <br />t" <br />0- <br />CONCRETTE FOUNDATION AND <br />I Nr-oR , I N6 PER 5TPUcTUB H/ <br />®x <br />17— <br />6 MIL. V,V-B, ON 611 GRAVE-[ <br />IU <br />BASE. PROVIDE R1® RI6IP <br />"MINIMUM <br />< <br />� <br />INSULATION <br />pp <br />VERTICAL 2PERIMETER 1 E v <br />VETAIL5 1 1 /A52 AND61AB. 3 <br />0- <br />< <br />ill- <br />IL <br />P. <br />SLATE <br />e -., <br />4 <br />2 � I K 4" CONCRETE- <br />0 <br />W <br />13 <br />. _ <br />5L SET ON 2" THICK COUR5E <br />LL <br />6- <br />Q <br />Q <br />5AND BED. 5EE PET. 1 ONG. <br />- <br />A1o2o <br />3. 6MU Le CMU HALL PER <br />EXTERIOR EVA T I ON5 H I TH <br />0 <br />REINFORCING PER STRUCTURAL. <br />0 <br />EXTERIORSEE EVATIONS F <br />- - <br />- <br />AND ! U E- m <br />I <br />TOP OF 5LA- <br />4, STOREFRONT. THERMA[1LY <br />w,�n � . <br />73 <br />BROKEN ALUMINUM 5TOREFRONT <br />� <br />FRAMING (U o a 34 MAX.) H I TH 1 11 <br />IN5ULATED 6LA55 OR 1 " <br />s <br />Al, <br />I N5ULAT 5AFETY 6LAS5 (5H66 <br />®. 40 MAX.). 5EE EX I ®R <br />_ CNI'l <br />ELEVATIONS. <br />n ' <br />5, 6U - THERMALLY <br />AIN. <br />BR ALUMINUM STOREFRONT <br />FRAMIN6 (U �; .34 MAX.) H I TH 1 11 <br />INSULATED 6LA55 1 11 <br />IN5ULATEP 5AE-ETY 6LA55 (5H66 <br />0.40 MAX.). SEE EXTERIOR <br />ELEVATIONS, <br />_ <br />b , MEMBRANE ROOF. TPQ <br />2 <br />ROOFING ®N R-M RI6IP <br />>1 <br />< A <br />I N5ULAT I ON AN® VAP BARR I <br />OVER AL DECK AND FRAMIF46 <br />04 <br />PER 5TRUCTURAL. <br />CIA <br />cq <br />1, 5HONROOM AND 5 1 GE- <br />A . <br />CANOPY-. AGM META, PANELS AND <br />- <br />FRAMING PER VETAIL5 ANP <br />1 0 <br />T . ®® PEA <br />6, EXTERIOR L2 9I0I <br />; <br />EXTER IOR ELEVATIONS ON <br />1;SHEATHIN6 <br />AND FRAMIN6 PER9 <br />STRUCTURAL H/ VAPOR BARRIER <br />H/ CONTINUOUS R-10 RIGID INSUL. <br />c:)c) <br />EXTERIOR AND R- 1 BAfiT <br />� <br />INSULATION IN 5TUV 6AVITIE5 <br />OVER FRAMING HITH 5/6" 6 <br />OVER. E TO VETA I L5 1 1 /A5 a I-J <br />AND 6/A!5.2. v <br />® <br />0' ® <br />T®P OF 51A <br />ilo FOOTING IN- 4" MINIMUM <br />PIA, PERFORATED PVC, PIPE <br />SURROUNDED N I T4 I N I N6 <br />6RAVEL BACKF I LL HRAPPEP IN <br />FILTER FABRI6. ROUTE- DRAINS TO <br />NEAREST CATCH BA5 I N . <br />10.PERIMETER INSULATION, <br />CONT. R-10 MIN, RIGID <br />INSULATION BOARD. EXTEND 21-0n <br />MINIMUM INTO INTERIOR OF <br />BUILVIN6. <br />11, IT- 24 6A, <br />PREFIN15KM METAL 5OFFIT <br />PANELS ATTACHED TO FURRING <br />MEMBERS A5 WWI). <br />12. CEILING. CEILING MATERIAL <br />AND EINI5H PER EINI5H <br />56HEDULE. <br />15. ASPHALT RAVING — PROVIDE <br />ASPHALT RAV I NG PER 6 I V I L <br />1i 6I NEER IN6 PRAN N65 <br />0 <br />U- <br />W <br />z <br />M <br />zW <br />1�91 <br />® co <br />P� <br />z <br />T�POF 5L- <br />W <br />(o <br />® <br />P' W e <br />G3 <br />Drawing. <br />3� <br />Af41 <br />�. <br />�J OEVERET <br />� <br />REVIEWED FOR PERMIT <br />Job Nllrrl; <br />1 7 1 <br />